12.07.2015 Views

Central Planning Committee

Central Planning Committee

Central Planning Committee

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

3. BEFORE ANY WORK STARTS ON SITE, full technical specifications of the roadimprovement works, as detailed on stamped approved plan 03A shall be submitted for the priorwritten approval of this <strong>Planning</strong> Authority. Thereafter the road improvement works shall becompleted in accordance with the approved scheme, prior to the occupation of any of the newdwellinghouses hereby approved.Reason: In the interests of road safety: to ensure that all the required road improvementworks are completed to the correct standard and prior to the occupation of the houses.4. BEFORE THE OCCUPATION OF THE DWELLINGS HEREBY APPROVED, visibility splaysof 2 metres by 25 metres shall be provided in both directions at the new accesses to the sitefrom Fa-Latch Road. Thereafter these shall be permanently maintained free from anyobstructions exceeding a height of 0.6 metres above the adjacent road channel levels.Reason: In the interests of road safety; to ensure the provision of adequate visibility at thejunction of the vehicular access to the site and the public road.5. BEFORE ANY WORK STARTS ON SITE, full details of the SUDS system for thedevelopment hereby approved shall be submitted for the prior written approval of Fife Council as<strong>Planning</strong> Authority. Thereafter the development shall be carried out in accordance with theseapproved details.Reason: To ensure the site is drained in an acceptably sustainable manner and the drainageinfrastructure is properly maintained.6. IF DURING THE CONSTRUCTION PERIOD EVIDENCE OF BATS ARE FOUND, ALLWORK SHALL CEASE AND SHALL NOT COMMENCE UNTIL a further survey which includesmitigation methods for the safe removal and relocation of the bats has been submitted for thewritten approval of this <strong>Planning</strong> Authority and the mitigation measures contained within havebeen wholly carried out in accordance with the approved survey. It should be noted that this is inaccordance with Regulations 39 and 43 of the Conservation (Natural Habitats &c.) Regulations1994 (as amended) (Habitats and Regulations) and it is therefore illegal not to comply with thiscondition.Reason: To ensure the adequate protection of a protected species should any evidence oftheir presence be found7. No trees, hedgerows or shrubs shall be removed, and no soil stripping shall take place duringthe bird nesting season (i.e. 1st March to 1st September) unless the trees, hedgerows or shrubsthat are to be removed have been surveyed to confirm the absence of active bird nesting and areport setting out the methodology employed and the results of the survey have been submittedto and approved in writing by the <strong>Planning</strong> Authority through consultation with SNH.Reason: To protect local birdlife and maintain the biodiversity of the site.8. BEFORE ANY WORKS START ON SITE, the development hereby approved shall beenclosed by a form of boundary enclosure, the details of which shall be submitted for approval inwriting by this <strong>Planning</strong> Authority. FOR THE AVOIDANCE OF DOUBT, the frontage of the siteshall be enclosed by a stone wall not exceeding 1 metre in height. Details of the wall shall besubmitted for the prior written approval of Fife Council as <strong>Planning</strong> Authority.Reason: In the interests of safeguarding visual and residential amenity and localenvironmental quality.26

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!