Presentation on Voith Hydro
Presentation on Voith Hydro Presentation on Voith Hydro
Omkareshwar 520MW HEPStay ringInner dia: ~ 5.8mOuter dia:~ 8.5 mWeight ~ 60 TonnesStatorOuter diameter: 13.5mInner diameter: 11.7mWeight ~ 150 Tonnes220 KV Switch YardGeneratorTransformerBay(8x80 MVA)Power Houseview fromUnloading BayRunnerDiameter: 5.5mWeight ~ 70 T
Baglihar 450MW HEPProject : New Hydropower PlantLpcation : Doda District, J&KType of Scheme : Run-of-the-river, with Underground Power HouseClient : JKPDCCapacity: : 3 x 150 MWCommissioning : 8 th Oct. 2008 (1st Unit)31 st March 2009 (last Unit)Dam Under Construction A view of Machine hall A view of Machine hallxxxxd
- Page 5 and 6: Milestones1873 First Voith hydrauli
- Page 7 and 8: Milestones1992 Grand Coulee, USA: N
- Page 9 and 10: Milestones2004 Kops II, Austria: Th
- Page 11 and 12: Voith Group4048dPresentatio
- Page 13 and 14: Voith - Sales and employees by divi
- Page 15 and 16: Management Board• Dr. Siegbert Et
- Page 17 and 18: 18501867187718811900190119231928195
- Page 19 and 20: Locations in Europe• Heidenheim,
- Page 21 and 22: Locations in Europe• Oslo/Trondhe
- Page 23 and 24: Locations in Asia• Shanghai, Chin
- Page 25 and 26: VH Manufacturing NetworkMississauga
- Page 27 and 28: The Voith - ElectricalProductsAir C
- Page 29 and 30: Locations for ocean energy• Heide
- Page 31 and 32: Positive market development• Sale
- Page 33 and 34: Voith Hydro - Markets and products4
- Page 35 and 36: Turbines• Voith Hydro is for more
- Page 37 and 38: 4032dDevelopment of the capacity of
- Page 39 and 40: 4033eDevelopment of the capacity of
- Page 41 and 42: Small Hydro• A Small Hydro power
- Page 43 and 44: Automation• Voith Hydro has devel
- Page 45 and 46: Ocean Energy - the new form of hydr
- Page 47 and 48: Ocean Energy - wave power stations
- Page 49 and 50: Voith Hydro in IndiaIncorporated :
- Page 51 and 52: Major Orders And Customers2000 By t
- Page 53 and 54: Recent Orders2006-07 Electro Mechan
- Page 55: Omkareshwar 520MW HEPProject : New
- Page 59 and 60: Why Voith Hydro?4042ePresen
- Page 61 and 62: The Blue Book process is• The gui
- Page 63 and 64: 4045dCustomer relationships and lon
- Page 65 and 66: Vision and Mission4048ePres
- Page 67 and 68: Our values - fair and reliable• W
- Page 69 and 70: Our values - engineered and innovat
- Page 71 and 72: Engineered reliability - the Voith
Baglihar 450MW HEPProject : New <strong>Hydro</strong>power PlantLpcati<strong>on</strong> : Doda District, J&KType of Scheme : Run-of-the-river, with Underground Power HouseClient : JKPDCCapacity: : 3 x 150 MWCommissi<strong>on</strong>ing : 8 th Oct. 2008 (1st Unit)31 st March 2009 (last Unit)Dam Under C<strong>on</strong>structi<strong>on</strong> A view of Machine hall A view of Machine hallxxxxd<str<strong>on</strong>g>Presentati<strong>on</strong></str<strong>on</strong>g> | 2009-08-18 | 57