Presentation on Voith Hydro

Presentation on Voith Hydro Presentation on Voith Hydro

12.07.2015 Views

More than 150 years of Siemens highlights1925 Construction of the Shannon hydroelectric power plant in Ireland.1941 After the death of Carl Friedrich von Siemens, Hermann vonSiemens takes over as chairman of the Company’s SupervisoryBoards.1966 Founding of Siemens AG.2000 Joint Venture Voith Siemens Hydro Power Generation.Werner von Siemens (1816 -1892)4016eong>Presentationong> | 2009-08-18 | 4

Milestones1873 First Voith hydraulic turbine.1903 First Pelton turbine.1912 Niagara Falls, Canada: Voith twinFrancis turbines with a rating of12 MW – the largest at the time.1934 Pedreira, Brazil: First reversiblepump-turbine in the world with anoutput of 5.3 MW.1938 Sungari, China: The worldwide first100 MVA generators.1964 Roenkhausen, Germany: Firstreversible motor and generator unitin a German pumped storage station.1969 El Chocon, Argentina: First generatorwith a stator bore diameter of 16 m.1970 Raccoon, USA: Largest pumpedstorage machines in the world at thetime, with four 425 MVA units anddirectly water-cooled stator and rotor.NiagaraRaccoon4018eong>Presentationong> | 2009-08-18 | 5

More than 150 years of Siemens highlights1925 C<strong>on</strong>structi<strong>on</strong> of the Shann<strong>on</strong> hydroelectric power plant in Ireland.1941 After the death of Carl Friedrich v<strong>on</strong> Siemens, Hermann v<strong>on</strong>Siemens takes over as chairman of the Company’s SupervisoryBoards.1966 Founding of Siemens AG.2000 Joint Venture <strong>Voith</strong> Siemens <strong>Hydro</strong> Power Generati<strong>on</strong>.Werner v<strong>on</strong> Siemens (1816 -1892)4016e<str<strong>on</strong>g>Presentati<strong>on</strong></str<strong>on</strong>g> | 2009-08-18 | 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!