Introduction to the Logical Framework Approach - Stockholm ...
Introduction to the Logical Framework Approach - Stockholm ...
Introduction to the Logical Framework Approach - Stockholm ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Introduction</strong> <strong>to</strong> <strong>the</strong> LFAReaderActivity & Resource SchedulingDSEWorkplan /activityscheduleActivities 1 2 3 4 5 6 etc. WhoActivitiesBudgetCode Unit cost No. Total Rec.1. Rehabilitate sewer network1.1 Conduct assessmentA1.2 Design improvementsA1.3 Contract company A2. Rehabilitate WWTP2.1 Obtain design spec.2.2 Sign contract2.3 Moni<strong>to</strong>r constructionBBB1. Rehabilitate sewer network• Salaries A.1 200 20 4,000 4,000• Equipment B.3 350 4 1,400• Consultant B.4 1000 3 3,0002. Rehabilitate WWTP• Salaries• Equipement• Filters2.3.7.2. Resource SchedulesResource schedules provide <strong>the</strong> basis for <strong>the</strong> planned mobilisation of(external and local) resources, facilitate results-based budgeting and<strong>the</strong> moni<strong>to</strong>ring of cost-effectiveness. Resource schedules also identifycost implications, such as <strong>the</strong> requirement for counterpart funding. 45To establish a resource schedule <strong>the</strong> list of activities, sub-activities and taskselaborated in <strong>the</strong> activity schedule is being copied in<strong>to</strong> a resource scheduleform. Then in a first step <strong>the</strong> means (human and material resources)necessary <strong>to</strong> carry out <strong>the</strong> activities are specified. In a second step <strong>the</strong> cost of<strong>the</strong> means are specified following defined categories, such as 46 :• units• quantities per defined period (e.g. quarters of a year)• unit costOn this basis cost per period and <strong>to</strong>tal project cost can be easily calculated.In addition a column can be included <strong>to</strong> specify <strong>the</strong> funding source <strong>to</strong> indicate<strong>the</strong> contributions of <strong>the</strong> different parties involved.45 Adapted from PARTICIP GmbH, p. 23.46 Adapted from European Commission, May 1999, p. 41.34