Steve Langish 11 January 2012 - PPPL EVMS Page
Steve Langish 11 January 2012 - PPPL EVMS Page Steve Langish 11 January 2012 - PPPL EVMS Page
• Applicability:• This procedure covers changes to the followingcontrolled documents that define the functional ortechnical requirements, the design configuration ofthe NSTX Upgrade Project (NSTXU), or cost andschedule baselines associated with the technicalbaseline:▪ Approved NSTXU specifications, including the GeneralRequirements Document (GRD) and System RequirementsDocuments (SRDs);▪ Approved Interface Control Documents (ICDs); and▪ NSTXU cost and schedule baselines.9
- Page 1 and 2: Steve Langish11 January 20121
- Page 3 and 4: • It is recommended dd that furth
- Page 5 and 6: • Change Control (ECPs)• Requir
- Page 7: • PMSD Section 5 Change Control
- Page 12 and 13: http://198.35.0.12/fmi/iwp/res/iwp_
- Page 14 and 15: • On a monthly basis, the control
- Page 16 and 17: • Provided EACH MONTH by the CAM
- Page 18: • There Are Many Formulas That Ca
- Page 21: • Tab 2 of CAM Notebook• Work A
• Applicability:• This procedure covers changes to the followingcontrolled documents that define the functional ortechnical requirements, the design configuration ofthe NSTX Upgrade Project (NSTXU), or cost andschedule baselines associated with the technicalbaseline:▪ Approved NSTXU specifications, including the GeneralRequirements Document (GRD) and System RequirementsDocuments (SRDs);▪ Approved Interface Control Documents (ICDs); and▪ NSTXU cost and schedule baselines.9