• The Committee recommends that t PPPL deploy EVMS training i that t isconsistently and rigorously applied so that the message becomes a partof the normal work process of functioning as a CAM or a PCM. A trainingvenue, especially in the areas of change control, EAC and thedevelopment and usage of a comprehensive Control Account Plan shoulddeliver results that show CAMs and PCMs have integrated the teachinginto their everyday work methods and not just ‘taken’ a class or reviewedan online assignment; then “went back to work”. The intent of theCommittee’s recommendation is not so much to request training is“conducted” but that a training program is focused on the CAMs andPCMs “using” the training and ensuring the consistent and continuousapplication of the EVMS policies and procedures across all ControlAccounts.4
• Change Control (ECPs)• Requirements• Discussion of Change Control (NSTXU‐PROC‐001)NSTXU Configuration Control• On‐line ECP Process• Estimate at Complete• Requirements……..and what feedback is needed• Calculations• Control Account Plan• Requirements• Components5
- Page 1 and 2: Steve Langish11 January 20121
- Page 3: • It is recommended dd that furth
- Page 7: • PMSD Section 5 Change Control
- Page 10: When ECP NeededWhen there is a desi
- Page 13 and 14: • Guideline #27: Develop revised
- Page 15 and 16: • (From the PMSD) On a Monthly ba
- Page 17 and 18: MY EAC IS = MUSTSUPPLY A NUMBER EAC
- Page 20 and 21: • Procedure 5 of PMSD “Control
- Page 24: • Take Away’s:• On‐line sys