• It is recommended dd that further training i on EAC analysis andmaintenance be conducted with the CAMs, and the CAMsshould take on a more active role in maintaining their EAC.The training should include the value a properly maintainedEAC adds to the project, as well as how to determine whatjustifies an EAC update. It is also recommended thatdocumentation be kept on file to reflect the basis of theadjustment, and that both additions and subtractions bemaintained i in the EAC in order to reflect a valid projection ofproject costs.3
- Page 1: Steve Langish11 January 20121
- Page 5 and 6: • Change Control (ECPs)• Requir
- Page 7: • PMSD Section 5 Change Control
- Page 10: When ECP NeededWhen there is a desi
- Page 13 and 14: • Guideline #27: Develop revised
- Page 15 and 16: • (From the PMSD) On a Monthly ba
- Page 17 and 18: MY EAC IS = MUSTSUPPLY A NUMBER EAC
- Page 20 and 21: • Procedure 5 of PMSD “Control
- Page 24: • Take Away’s:• On‐line sys