Steve Langish 11 January 2012 - PPPL EVMS Page
Steve Langish 11 January 2012 - PPPL EVMS Page Steve Langish 11 January 2012 - PPPL EVMS Page
• Provided EACH MONTH by the CAM• NSTXU PEP requires a bottom‐up estimateevery six monthsEAC Updates DO NOTCHANGE YOUR BUDGET !You must file an ECP to changeyour budget!!TAB 11 of CAM Notebook16
MY EAC IS = MUSTSUPPLY A NUMBER EACHMONTH – MUST ADDCURRENT MO. COST VAR.17
- Page 1 and 2: Steve Langish11 January 20121
- Page 3 and 4: • It is recommended dd that furth
- Page 5 and 6: • Change Control (ECPs)• Requir
- Page 7: • PMSD Section 5 Change Control
- Page 10: When ECP NeededWhen there is a desi
- Page 13 and 14: • Guideline #27: Develop revised
- Page 15: • (From the PMSD) On a Monthly ba
- Page 20 and 21: • Procedure 5 of PMSD “Control
- Page 24: • Take Away’s:• On‐line sys
MY EAC IS = MUSTSUPPLY A NUMBER EACHMONTH – MUST ADDCURRENT MO. COST VAR.17