• Guideline #27: Develop revised estimates ofcost at completion based on performance todate, commitment values for material, andestimates of future conditions. Compare thisinformation with the performancemeasurement baseline to identify variancesat completion important to companymanagement and any applicable customerreporting requirements including statementsof funding requirements.13
- Page 1 and 2: Steve Langish11 January 20121
- Page 3 and 4: • It is recommended dd that furth
- Page 5 and 6: • Change Control (ECPs)• Requir
- Page 7: • PMSD Section 5 Change Control
- Page 10: When ECP NeededWhen there is a desi
- Page 15 and 16: • (From the PMSD) On a Monthly ba
- Page 17 and 18: MY EAC IS = MUSTSUPPLY A NUMBER EAC
- Page 20 and 21: • Procedure 5 of PMSD “Control
- Page 24: • Take Away’s:• On‐line sys
• Guideline #27: Develop revised estimates ofcost at completion based on performance todate, commitment values for material, andestimates of future conditions. Compare thisinformation with the performancemeasurement baseline to identify variancesat completion important to companymanagement and any applicable customerreporting requirements including statementsof funding requirements.13