12.07.2015 Views

constituted - of Planning Commission

constituted - of Planning Commission

constituted - of Planning Commission

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table 5.3:Projected IEBR for the 12 th Plan(` crore)Year 2012-13 2013-14 2014-15 2015-16 2016-17 TotalInternal Resources 151045 159101 177366 184055 184055 855621Extra Budgetary 134631 144596 135061 128905 169083 712276ResourcesIEBR 285676 303697 312427 312960 353138 1567897Out <strong>of</strong> the Total IEBR, 54.6 per cent is contributed through Internal Resources,with the remaining 45.4 per cent coming as Extra Budgetary Resources. DuringEleventh Plan, the major contributing Ministries were Ministry <strong>of</strong> Petroleumand Natural gas (30.08%), Ministry <strong>of</strong> Power (19.16%), Ministry <strong>of</strong> Steel(6.37%) and Ministry <strong>of</strong> Railways (13.17%). The projected IEBR for theTwelfth Plan indicates Ministry <strong>of</strong> Petroleum and Natural gas as majorcontributor with 26.98 per cent <strong>of</strong> the total followed by Ministry <strong>of</strong> Power(18.77%), Ministry <strong>of</strong> Steel (14.07%) and Ministry <strong>of</strong> Railways (10.23%).Should IEBR be a part <strong>of</strong> the Plan?Right from the First Five year Plan, PSEs (both Centre and State) wereconsidered part <strong>of</strong> the public sector plan. The development programmes <strong>of</strong> theCentral and State Governments and also <strong>of</strong> the commercial enterprises ownedby them is included in the Public Sector plan. The Plan investments andresources (IEBR) <strong>of</strong> the CPSEs have always been important components <strong>of</strong> theCentral Plan. In the Eleventh Plan, out <strong>of</strong> the total projected Central Planresources <strong>of</strong> `21.5 lakh crore, the CPSE resources (IEBR) was projected at`10.6 lakh crore (49 per cent <strong>of</strong> the total). The resources <strong>of</strong> SPSEs in theEleventh Plan were projected at `128,824 crore, which was 8.7 per cent <strong>of</strong> thetotal plan resources <strong>of</strong> States and UTs. The Eleventh Plan projections forresources <strong>of</strong> CPSEs and SPSEs taken together amounted to `11.9 lakh crore,which was 32.6 per cent <strong>of</strong> the total resources <strong>of</strong> public sector plan <strong>of</strong> `36.4lakh crore.Working Group Report on Centre’s Financial ResourcesPage-53

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!