ASSEMBLY MANUAL B-25 Mitchell ARF - RC DEPOT
ASSEMBLY MANUAL B-25 Mitchell ARF - RC DEPOT
ASSEMBLY MANUAL B-25 Mitchell ARF - RC DEPOT
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Retract Air line Routing DiagramRetaining nuts are optionalReach Forrobart3 GEARINSTALLATIONRight LandingGear CylinderOptional On-boardPressure Gauge #173(NOT INCLUDED)Included in theVRX KitsFill ChuckFill ValveNoseGearCylinderTeeFittings(AIR SUPPLY IN)ControlValve** USE THE PROPER LINK ROD <strong>ASSEMBLY</strong>FOR THE CONTROL VALVE(servo, servo arm, and link rod assembly are NOTincluded in kit)1/4" TravelMaximumLink RodAssemblyServoArmLeft LandingGear CylinderServoNote: The link rod betweenthe servo arm and the controlvalve spool is very important.Use a nylon clevis at the valvespool and a simple Z-bend atthe servo arm as shown. Thethrow on the servo arm shouldallow for approximately 1/4-inch(4mm) of travel. This will keepany excessive side loads on thevalve spool minimal and, in turn,prevent any leakage around thevalve spool seals.74