12.07.2015 Views

ASSEMBLY MANUAL B-25 Mitchell ARF - RC DEPOT

ASSEMBLY MANUAL B-25 Mitchell ARF - RC DEPOT

ASSEMBLY MANUAL B-25 Mitchell ARF - RC DEPOT

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Section 12: Rudder and Servo Installation Step 14After the CA has fully cured, gently pull on the rudderand fin to make sure the hinges are secure. If not, re-gluethe hinges. Step 16Use medium grit sandpaper to sand the evevator torquerods. Use rubbing alcohol and a paper towel to removeany dirt and debris from the torque rod. This will aid instrengthening the bond between the elevator, torque rodand epoxy. Step 15To break in the hinges, you will need to flex the rudderback and forth a number of times. Step 17Hinging the elevator follows the same procedure as therudder, except you will need to apply 30-minute epoxy tothe torque rods that enter the elevator. Step 18Repeat Steps 1 through 17 for the remaining rudderand elevator.62

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!