12.07.2015 Views

ASSEMBLY MANUAL B-25 Mitchell ARF - RC DEPOT

ASSEMBLY MANUAL B-25 Mitchell ARF - RC DEPOT

ASSEMBLY MANUAL B-25 Mitchell ARF - RC DEPOT

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Section 8: Retractable Landing Gear Installation Step 24Route the air lines from the retract unit through the nacelleloosely. If you are installing the retracts and the wingextensions are already in place, then you will need to usea string and a weight to fish the air lines through the wing.Both sets of these air lines will be hooked up later usingthe Robart air installation diagram which we have includedon page 73 of this manual) Step <strong>25</strong>Install the main wheel onto a wheel axle and then installtwo #10 washers onto the axle before inserting the wheeland axle into the strut. The washers act as spacers to keepthe wheel from rubbing against the strut leg. Temporarilytighten the setscrew and then cut off the excess axle usinga rotary tool and cutoff wheel. File a flat area on the axlefor the wheel strut setscrew and then install the wheel andaxle to the main wheel strut. Step 26Repeat Steps 17 through <strong>25</strong> for the remaining main gear.Note: Use threadlock on all screws to keepthem from coming loose during flight.51

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!