12.07.2015 Views

ASSEMBLY MANUAL B-25 Mitchell ARF - RC DEPOT

ASSEMBLY MANUAL B-25 Mitchell ARF - RC DEPOT

ASSEMBLY MANUAL B-25 Mitchell ARF - RC DEPOT

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Section 7: Fixed Landing Gear Installation Step 4Slide the main gear into the engine nacelle. Step 6Enlarge the holes in the gear rails ONLY using a 7/64-inch(3mm) drill bit.Note: Wheel not shown for clarity. Step 5Use a drill and 5/64-inch (2mm) drill bit to drill fourholes through the mounting rails and into the gearblock. these holes are to be drilled 1/2-inch (13mm) andthen 1 1 / 2-inch (38mm) from the front of the rear bulkhead.The holes are to be centered on the rails. By doing thisyou can later use the same holes to install the optionalretracts. Step 7Secure the main gear in the engine nacelle using four#4 x 1-inch sheet metal screws. Step 8Repeat Steps 1 through 7 to install the remaining maingear in the engine nacelle.40

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!