12.07.2015 Views

ASSEMBLY MANUAL B-25 Mitchell ARF - RC DEPOT

ASSEMBLY MANUAL B-25 Mitchell ARF - RC DEPOT

ASSEMBLY MANUAL B-25 Mitchell ARF - RC DEPOT

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Section 6: Glow Engine Installation Step 24We used a fuel dot on the line to the needle valve that willmount to the cowling, making fueling the engine mucheasier when the cowl has been installed. When using afuel dot you will need to splice a "T" fitting between thetank and the carburetor as shown. Step 26Use hobby scissors and a rotary tool with a small sandingdrum to make a round opening in the dummy engine forthe motor shaft. Step <strong>25</strong>Connect the lines from the tank to the engine. Step 27Use a sharp hobby knife to remove the materialbetween the dummy cylinder heads to allow coolingair to pass through the dummy engine and over themotor. Use 30-minute epoxy to glue the dummy engineinside the cowling.Note: Do not remove the area between allof the dummy cylinder heads. You need toonly remove the area in front of and nextto the glow engine. This will help maintainairflow over the engine cylinder head andhelp to promote proper engine cooling.36

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!