ASSEMBLY MANUAL B-25 Mitchell ARF - RC DEPOT
ASSEMBLY MANUAL B-25 Mitchell ARF - RC DEPOT
ASSEMBLY MANUAL B-25 Mitchell ARF - RC DEPOT
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Section 4: Operation Flap Linkage Installation Step 12Adjust the position of the clevises so the flaps are alignedwith the trailing edge of the wing when the flap servo is inthe up position. Use the heat shrink tubing and heat gunto make sure the clevises will not become disconnectedfrom the flap control horns. Be careful not to damage thecovering. Step 13Repeat Steps 1 though 10 for the remaining flap linkage.<strong>25</strong>