12.07.2015 Views

ASSEMBLY MANUAL B-25 Mitchell ARF - RC DEPOT

ASSEMBLY MANUAL B-25 Mitchell ARF - RC DEPOT

ASSEMBLY MANUAL B-25 Mitchell ARF - RC DEPOT

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Section 4: Operation Flap Linkage Installation Step 12Adjust the position of the clevises so the flaps are alignedwith the trailing edge of the wing when the flap servo is inthe up position. Use the heat shrink tubing and heat gunto make sure the clevises will not become disconnectedfrom the flap control horns. Be careful not to damage thecovering. Step 13Repeat Steps 1 though 10 for the remaining flap linkage.<strong>25</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!