12.07.2015 Views

ASSEMBLY MANUAL B-25 Mitchell ARF - RC DEPOT

ASSEMBLY MANUAL B-25 Mitchell ARF - RC DEPOT

ASSEMBLY MANUAL B-25 Mitchell ARF - RC DEPOT

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Section 3: Fixed Flap Linkage InstallationRequired Parts• Assembled wing panel (right and left)• Fixed flap stay (2) • Flap linkage (2)• Pushrod connector (2) • Nylon clevis (4)• 1/4-inch (4mm) heat shrink tubing Step 2Sand the flap stay using medium grit sandpaper. Userubbing alcohol and a paper towel to remove any dirt anddebris from the flap stay. This will help in strengtheningthe bond between the flap stay and wing rib.Required Tools and Adhesives• 30-minute epoxy• Hobby knife• Heat gunNote: The following steps cover theinstallation of fixed flaps on yourB-<strong>25</strong> <strong>Mitchell</strong>. You can skip to"Section 4: Operational FlapLinkage Installtion" if you areinstalling operational flaps. Step 1Remove the covering from the wing slot to insert the fixedflap stay in the wing. Step 3Use 30-minute epoxy to glue the flap stay in the wing. Step 4Cut two 1/4-inch (4mm) long pieces from the heat shrinktubing and slide it onto each of the clevises. Thread theclevises onto the flap linkage.20

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!