ASSEMBLY MANUAL B-25 Mitchell ARF - RC DEPOT
ASSEMBLY MANUAL B-25 Mitchell ARF - RC DEPOT
ASSEMBLY MANUAL B-25 Mitchell ARF - RC DEPOT
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Section 3: Fixed Flap Linkage InstallationRequired Parts• Assembled wing panel (right and left)• Fixed flap stay (2) • Flap linkage (2)• Pushrod connector (2) • Nylon clevis (4)• 1/4-inch (4mm) heat shrink tubing Step 2Sand the flap stay using medium grit sandpaper. Userubbing alcohol and a paper towel to remove any dirt anddebris from the flap stay. This will help in strengtheningthe bond between the flap stay and wing rib.Required Tools and Adhesives• 30-minute epoxy• Hobby knife• Heat gunNote: The following steps cover theinstallation of fixed flaps on yourB-<strong>25</strong> <strong>Mitchell</strong>. You can skip to"Section 4: Operational FlapLinkage Installtion" if you areinstalling operational flaps. Step 1Remove the covering from the wing slot to insert the fixedflap stay in the wing. Step 3Use 30-minute epoxy to glue the flap stay in the wing. Step 4Cut two 1/4-inch (4mm) long pieces from the heat shrinktubing and slide it onto each of the clevises. Thread theclevises onto the flap linkage.20