12.07.2015 Views

Damoh Batiagarh - Madhya Pradesh Road Development ...

Damoh Batiagarh - Madhya Pradesh Road Development ...

Damoh Batiagarh - Madhya Pradesh Road Development ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Electrical Services at Laybys, bus stops and rest area - Potable water supplysystem including supply of drinking water at truck parking laybyes, rest areas etc.- Public toilets and other sanitary Facilities- Solid wastes disposal system including those from litterbins3.3 Maintenance Part of O& M Manual3.3.1 This section of the operation and maintenance manual, shall include theactivities described here-in-under amongst other activities required for the regularand preventive maintenance of the equipment during the operations period, sothat the Project Highway is maintained in a manner that at all times it complieswith the specifications and standards prescribed in this Schedule and at the timeof divestment of Right and Interests by the Concessionaire in terms of Article 17of the Concession Agreement it is sound, durable and in functional condition.3.3.2 The concessionaire shall maintain the Project Highway in traffic-worthy conditionand the Project‟s Facilities in usable condition throughout the Concession Periodor any extension thereof in terms of the Concession Agreement through regularmaintenance and preventive maintenance of the various items and elements ofthe Project Highway.3.3.3 The concessionaire shall maintain the existing 2 lane of the Project Highway duringconstruction of new lanes as per the requirement set out in clause 12.2 ofConcession Agreement3.3.4 The following publications can be referred for preparation of the said section II of“Maintenance Manual”MOST manual for maintenance of roadsIRC:SP-35, guidelines for Inspection and Maintenance of BridgesThe manufacturers Maintenance Manual(s) of the equipment includingthat of all Toll Collection system to be used in the Project HighwayOperation shall form part of the said O & M ManualAny other appropriate documents3.3.5 Routine MaintenanceIn order to ensure smooth and uninterrupted flow of traffic during normal operatingconditions for all 24 hours of a day, routine maintenance of the Project Facilities shallinclude but not be limited to:(i)Prompt repairs of Toll Plaza, concrete joints, drains, lane marking, signage;patching, raised beams, drain cleaning, repairing of signs, road marking, carryingout repairs to pavement crack by sealing; barricades, railing etc.MPRDC- Bhopal March, 2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!