12.07.2015 Views

Damoh Batiagarh - Madhya Pradesh Road Development ...

Damoh Batiagarh - Madhya Pradesh Road Development ...

Damoh Batiagarh - Madhya Pradesh Road Development ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Request for Proposal (RFP) for Independent Engineer for <strong>Damoh</strong> <strong>Batiagarh</strong> <strong>Road</strong>5 Construction Period5.1 In respect of the Drawings, Documents and Safety Report received by theIndependent Engineer for its review and comments during the Construction Period,the provisions of Paragraph 4 shall apply, mutatis mutandis.5.2 The Independent Engineer shall review the monthly progress report furnished by theConcessionaire and send its comments thereon to the MPRDC and theConcessionaire within 7 (seven) days of receipt of such report.5.3 The Independent Engineer shall inspect the Construction Works and the ProjectHighway once every month, preferably after receipt of the monthly progress reportfrom the Concessionaire, but before the 20 th (twentieth) day of each month in anycase, and make out a report of such inspection (the “Inspection Report”) settingforth an overview of the status, progress, quality and safety of construction,including the work methodology adopted, the materials used and their sources, andconformity of Construction Works with the Scope of the Project and theSpecifications and Standards. In a separate section of the Inspection Report, theIndependent Engineer shall describe in reasonable detail the lapses, defects ordeficiencies observed by it in the construction of the Project Highway. TheInspection Report shall also contain a review of the maintenance of the existinglanes in conformity with the provisions of the Agreement. The IndependentEngineer shall send a copy of its Inspection Report to the MPRDC and theConcessionaire within 7 (seven) days of the inspection.5.1 The Independent Engineer may inspect the Project Highway more than once in amonth if any lapses, defects or deficiencies require such inspections.5.5 For determining that the Construction Works conform to Specifications andStandards, the Independent Engineer shall require the Concessionaire to carry out, orcause to be carried out, tests on a sample basis, to be specified by the IndependentEngineer in accordance with Good Industry Practice for quality assurance. Forpurposes of this Paragraph 5.5, the tests specified in the IRC Special Publication-11(Handbook of Quality Control for Construction of <strong>Road</strong>s and Runways) and theSpecifications for <strong>Road</strong> and Bridge Works issued by MOSRTH (the “QualityControl Manuals”) or any modification/substitution thereof shall be deemed to betests conforming to Good Industry Practice for quality assurance. The IndependentEngineer shall issue necessary directions to the Concessionaire for ensuring that thetests are conducted in a fair and efficient manner, and shall monitor and review theresults thereof.5.6 The sample size of the tests, to be specified by the Independent Engineer underParagraph 5.5, shall comprise 10% (ten per cent) of the quantity or number of testsprescribed for each category or type of tests in the Quality Control Manuals;provided that the Independent Engineer may, for reasons to be recorded in writing,__________________________________________________________________________MPRDC-Bhopal March, 2011 40

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!