12.07.2015 Views

Damoh Batiagarh - Madhya Pradesh Road Development ...

Damoh Batiagarh - Madhya Pradesh Road Development ...

Damoh Batiagarh - Madhya Pradesh Road Development ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

(b)Foundations of bridges(i) Scouring and/or cavitations - 15 days(c) Piers, abutments, return walls and wing walls of bridges(i) Cracks and damages including settlement - 30 daysand tilting(d)Bearings (metallic) of bridges(i) Deformation - 15 days(e)Joints in bridges(i) Loosening and malfunctioning of joints - 15 days(f)Other items relating to bridges(i) Deforming of pads in electrometric bearings- 7 days(ii)Gathering of dirt in bearings and joints;or clogging of spouts, weep holes and - 3 daysvent-holes(iii) Damage or deterioration in parapets - 3 daysside slopes of approaches(iv) Rain-cuts or erosion of banks of the - 15 daysside slopes of approaches(v) Damage to wearing coat - 15 days(vi) Damage or deterioration in approach - 30 daysslabs, pitching, apron, toes , floor orguide bunds(vii) Growth of vegetation affecting the - 15 daysstructure or obstructing the waterwayMPRDC- Bhopal March, 2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!