Criterion / Consideration Priority Score Indicators ofSignificance• >504. Expansive Soils along the corridor(length)• 50• 25-50• 10-25•
Criterion / Consideration Priority Score Indicators ofSignificance2. Level of unemployment % PopulationPoverty• >75• 50-75• 25-50• 254321E. Environmental Sensitivity Projects will not include any roadsections going through a national parkor sanctuary. Projects will not involveany expansion of RoWs.F. Involuntary Resettlement Sections with involuntary resettlementwill be subject to strict implementationof the RPs approved by GOMP andacceptable to ADB. Prior review andapproval of ADB is required beforeawards of civil works contracts for suchProject roads.ADB-IV80
- Page 29 and 30: 3.12 Deleted.3.13 In order to have
- Page 31 and 32: 4.3 The consultant shall plan the a
- Page 33 and 34: 4.7 Traffic Survey4.7.1 Number and
- Page 35 and 36: 4.7.3.5 The distribution of lead an
- Page 37 and 38: pessimistic and most likely traffic
- Page 39 and 40: upgrading costs. The detailed topog
- Page 41 and 42: 4.9.2.7 Details of utility Services
- Page 43 and 44: (ii)(iii)(iv)shoulder condition;emb
- Page 45 and 46: section testing shall involve carry
- Page 47 and 48: 4.9.4.2.3 For bridges and cross dra
- Page 49 and 50: 4.9.4.5.3 Environmental restriction
- Page 51 and 52: (i)(ii)(iii)(iv)(v)horizontal align
- Page 53 and 54: Government guidelines, use of flyas
- Page 55 and 56: 4.9.6.9 Arboriculture and Landscapi
- Page 57 and 58: 4.10.1.10 The consultant shall prep
- Page 59 and 60: feasibility and effectiveness of in
- Page 61 and 62: (ii)(iii)(iv)(v)Civil works contrac
- Page 63 and 64: 4.12 Economic Analysis4.12.1 The ro
- Page 65 and 66: 7. Project Team and Project Office
- Page 67 and 68: e presented as separate sections li
- Page 69 and 70: estimation, environmental aspects,
- Page 71 and 72: (ii)(iii)(iv)(v)Locations of median
- Page 73 and 74: that progress could be monitored by
- Page 75 and 76: A. Selection Criteria for ProjectsS
- Page 77 and 78: Handbook on Resettlement -A Guide t
- Page 79: TABLE SAF1: PROJECT RANKING CRITERI
- Page 83 and 84: A2 : Local AlignmentA3 : JunctionsA
- Page 85 and 86: C3 : JunctionsC4 : Non-Motorised ro
- Page 87 and 88: Schedule for Submission of Reports
- Page 89 and 90: 4. Bridge Engineeri) Educational Qu
- Page 91 and 92: 11. Social Development Specialisti)
- Page 93 and 94: (Form-III)FIRM’S REFERENCESReleva
- Page 95 and 96: (Form-V)COMMENTS/ SUGGESTIONS OF CO
- Page 97 and 98: (Form-VII)Format of Curriculum Vita
- Page 99 and 100: (Form-IX)A. FIELD INVESTIGATION(1st
- Page 101 and 102: FORM FIN-1FINANCIAL PROPOSALS ForPa
- Page 103 and 104: LIST OF ADB MEMBER COUNTRIES1. AFG
- Page 105 and 106: Agreement & General Conditions of C
- Page 107 and 108: 7. Responsibility for accuracy of t
- Page 109 and 110: (a) The Consultants shall carry out
- Page 111 and 112: 1.2 Relation between the PartiesNot
- Page 113 and 114: 2.6 ModificationModification of the
- Page 115 and 116: (e)(f)if, as the result of Force Ma
- Page 117 and 118: or in the Discharge of their obliga
- Page 119 and 120: (b)If required to comply with the p
- Page 121 and 122: value. Such bank guarantee (i) to r
- Page 123 and 124: 7.4 ACTION FOR DEFICIENCY IN SERVIC
- Page 125 and 126: APPENDIX- IFORM OF BANK GUARANTEERe
Criterion / Consideration Priority Score Indicators ofSignificance2. Level of unemployment % PopulationPoverty• >75• 50-75• 25-50• 254321E. Environmental Sensitivity Projects will not include any roadsections going through a national parkor sanctuary. Projects will not involveany expansion of RoWs.F. Involuntary Resettlement Sections with involuntary resettlementwill be subject to strict implementationof the RPs approved by GOMP andacceptable to ADB. Prior review andapproval of ADB is required be<strong>for</strong>eawards of civil works contracts <strong>for</strong> suchProject roads.ADB-IV80