12.07.2015 Views

RFP for BHOPAL & Narmadapuram Division - Madhya Pradesh ...

RFP for BHOPAL & Narmadapuram Division - Madhya Pradesh ...

RFP for BHOPAL & Narmadapuram Division - Madhya Pradesh ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Handbook on Resettlement -A Guide to Good Practice, Handbook onIncorporating Social Dimensions and Handbook on Poverty and SocialAnalysis.D. Land Acquisition and Involuntary Resettlement4. It shall be ensured that:(i) technical design <strong>for</strong> the road rehabilitation works under the Project,does not require widening of the existing rights of way and each civilworks contract package is closely screened to exclude those roadsegments which may require widening of the existing right of way.(ii) involuntary resettlement is minimized and only those road segmentswith insignificant resettlement impact or no negative impact areselected;(iii) the relevant resettlement plans are updated and modified toincorporate changes, if any, that may be necessitated by the detailedengineering designs prepared <strong>for</strong> the Projects in accordance with therequirements specified in paragraph 3 here above.E. Environmental Concerns5. It shall be ensured that:(i)(ii)(iii)(iv)The Project is carried out, and all Project facilities are designed andmonitored in compliance with the existing environmental laws andregulations of India and the State Government, and the EnvironmentalAssessment Guidelines (2003) of ADB, as may be amended fromtime to time;All environmental mitigation measures identified in the lEEs and theEMMPs prepared <strong>for</strong> the Projects are incorporated in such Projects'design <strong>for</strong> carrying out during construction, operation andmaintenance of the Projects;Local communities and other stakeholders are duly consulted duringthe implementation of the Projects on such mitigation measures;The Projects do not. include road segments passing through nationalparks or sanctuaries, and the clearances required by the Forest Act(1991) and Environment Protection Act (1986) with respect tosegments passing through reserve <strong>for</strong>ests are obtained in a timelymanner prior to commencement of construction at such segment.ADB-IV76

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!