12.07.2015 Views

RFP for BHOPAL & Narmadapuram Division - Madhya Pradesh ...

RFP for BHOPAL & Narmadapuram Division - Madhya Pradesh ...

RFP for BHOPAL & Narmadapuram Division - Madhya Pradesh ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

estimation, environmental aspects, economic and commercial analyses andconclusions. The report shall include Executive Summary giving brief accountsof the findings of the study and recommendations.8.3.1.5 The Report shall also include maps, charts and diagrams showing locations anddetails of existing features and the essential features of improvement andupgrading.8.3.1.6 The Environmental Impact study report including Initial EnvironmentalExamination (IEE) and EMMP (Environmental Monitoring And ManagementPlan) <strong>for</strong> each project shall be submitted separately as a part of the main report.8.3.1.7 The basic data obtained from the field studies and investigations and input dataused <strong>for</strong> the preliminary design shall be submitted in a separate volume as anAppendix to Main Report.Volume - II, Design Report8.3.1.8 This volume shall contain design calculations, supported by computer printout ofcalculations wherever applicable. The Report shall clearly bring out the variousfeatures of design standards adopted <strong>for</strong> the study. The design report will be intwo parts. Part-I shall primarily deal wit the design of road features andpavement composition while Part-II shall deal with the design of bridges andcross-drainage structures. The design report shall include detailed analysis <strong>for</strong>recommendations with regard to the proposals <strong>for</strong> rehabilitation, wideningincluding shoulder composition and cross-sections, new bridges, cross drainagestructures, underpasses, overpasses, subways, reconstruction of existing bridges,service roads, road amenities in line with the description given above. The subsoilexploration report including the complete details of boring done, analysesand interpretation of data and the selection of design parameters shall beincluded as an Appendix to the Design Report.8.3.1.8 The detailed design <strong>for</strong> all features should be carried out as per the requirementsof the Design Standards <strong>for</strong> the project. However, there may be situationswherein it has not been possible to strictly adhere to the design standards due tothe existing site conditions, restrictions and other considerations. The reportshould clearly bring out the details of these aspect and the standards adopted.Volume - III, Materials Report8.3.1.9 The Materials Report shall contain details concerning the proposed borrowareas and quarries <strong>for</strong> construction materials and possible sources of water <strong>for</strong>construction purposes. The report shall include details on locations of borrowareas and quarries shown on maps and charts and also the estimated quantitieswith mass haul diagram including possible end use with leads involved, thedetails of sampling and testing carried out and results in the <strong>for</strong>m of importantindex values with possible end use thereof.ADB-IV68

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!