12.07.2015 Views

RFP for BHOPAL & Narmadapuram Division - Madhya Pradesh ...

RFP for BHOPAL & Narmadapuram Division - Madhya Pradesh ...

RFP for BHOPAL & Narmadapuram Division - Madhya Pradesh ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

(ii)(iii)(iv)(v)Civil works contractors complies with all applicable labor laws ofIndia and the State Government, and does not employ childlabour <strong>for</strong> construction and maintenance activities;Employment targets, as acceptable, are set <strong>for</strong> women in roadconstruction activities;Civil works contractors does not differentiate between wages ofmen and women workers <strong>for</strong> work of equal value; andAppropriate child-care facilities are provided at or around theconstruction campsites.4.10.2.6 The consultant shall assess and document base line conditionsrelevant to the project with the objective to establish the batch marks.4.10.3 Reporting Requirements of Environment Impact4.10.3.1 The consultant would prepare the stand-alone reports including theIEE and EMMP as per the requirement of the ADB/ MPRDC, asapplicable, with contents as per the following:(i)(ii)(iii)(iv)(v)(vi)(vii)Executive SummaryDescription of the ProjectEnvironmental setting of the projectIdentification and categorization of the potential impacts (duringpre-construction, construction and operation periods)Analysis of alternatives (this would include correlation amongstthe finally selected alternative alignment/routing and designswith the avoidance and environmental management solutions)The public consultation processTypical plan or specific designs <strong>for</strong> all additional environmentalitems as described in the scope of work(viii) Incorporating any other as per the suggestions of theADB/MPRDC, till the acceptance of the reports by the ADB/MPRDC, as applicable4.10.3.2 EMMP (Environment Monitoring and Management Plan) Reports<strong>for</strong> Each Contract Package based on uni<strong>for</strong>m methodology and processes.The consultant will also ensure that the EMMP has all the elements <strong>for</strong> itto be a legal document. The EMMP reports would include the following:(i)Brief description of the project, purpose of the EMMP,commitments on incorporating environmental considerations in thedesign, construction and operations phases of the project andinstitutional arrangements <strong>for</strong> implementing the EMP.(ii) A detailed EMMP <strong>for</strong> construction and operational phases withrecourse to the mitigation measures <strong>for</strong> all adverse impacts.(iii) Detailed plans <strong>for</strong> highway-side tree plantation (as part of thecompensatory af<strong>for</strong>estation component).(iv) Environmental enhancement measures would be incorporated.Enhancement measures would include items described in the scopeADB-IV60

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!