12.07.2015 Views

RFP for BHOPAL & Narmadapuram Division - Madhya Pradesh ...

RFP for BHOPAL & Narmadapuram Division - Madhya Pradesh ...

RFP for BHOPAL & Narmadapuram Division - Madhya Pradesh ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

4.9.6.9 Arboriculture and LandscapingThe Consultants shall work out appropriate plan <strong>for</strong> planting of trees(specifying type of plantation), horticulture, floriculture on the surplusland of the right-of-way with a view to beautify the highway and makingthe environment along the highway pleasing. The existing trees / plantsshall be retained to the extent possible.4.9.6.10 Bus Parking, Truck Laybyes, Weighing Station, Parking Areasand Rest AreasThe consultant shall suggest suitable sites <strong>for</strong> Bus Parking, TruckLaybyes weighing stations, parking areas and rest areas and preparesuitable separate designs in this regard. The common facilities likepetrol pump, first-aid medical facilities, police office, restaurant,vehicle parking etc. should be included in the general layout <strong>for</strong>planning.4.9.6.11 Miscellaneous WorksThe Consultants shall prepare detailed plan <strong>for</strong> the trafficmanagement and safety during the construction period.4.10 Environment and Social Impact StudyThe consultant shall under take the detailed environmental, social and poverty impactstudies in accordance with the standard set by the Government of India and ADBincluding Environmental Assessment Guidelines (2003) of including ADB, as may beamended from time to time.4.10.1 Environmental Impact4.10.1.1 The consultant should carry out the preliminary environmentalscreening to assess the direct and induced impacts due to the project and toclassify the project from environmental aspects (The project should becategorized as an A or B project in accordance to the ADB’sEnvironmental Assessment Guideline (2003) as well as classificationbased on the Govt. requirement <strong>for</strong> environmental assessment study.4.10.1.2 The consultant will carried out environmental assessment studybased on the requirement emerged from classifying the project. If it is “B”project, the initial environment examination (IEE) should be carried out inaccordance with ADB’s Environmental Assessment Guidelines (2003) asamended from time to time / Government of India Guidelines, asapplicable and if the IEE warrants that EIA need to be prepared., theconsultant has to prepare the EIA study. If the project is classified as anADB-IV54

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!