12.07.2015 Views

RFP for BHOPAL & Narmadapuram Division - Madhya Pradesh ...

RFP for BHOPAL & Narmadapuram Division - Madhya Pradesh ...

RFP for BHOPAL & Narmadapuram Division - Madhya Pradesh ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

(v) ROB <strong>for</strong> railway crossings as per the requirement and thestandards of the Indian Railways; and,(vi) Alignment plans, longitudinal sections and cross-sections@ 50m intervals;(vii) Designs <strong>for</strong> road furniture and road safety/traffic controlfeatures;(viii) Designs and drawings <strong>for</strong> service road/ (provided no landacquisition is involved) tree planting/fencing at locationswhere necessary / required;(ix) Drainage design showing location of turnouts, out fallingstructures, separate drawings sheet <strong>for</strong> each 5 km. stretch;(x) Rehabilitation and repair plan with <strong>for</strong> bridges andstructures design and drawings;(xi) Traffic amenities (Parking Areas, Weighing Station andRest Areas, etc.);(xii) Other safety features.4.9.6.1.2 Wherever feasible within the constraints of the available land,symmetrical widening of the existing carriageway shall be avoidedand the required widening shall be achieved by widening along oneside of the existing road.4.9.6.2 Design Standards4.9.6.2.1 The Consultants shall evolve Design Standards and materialspecifications <strong>for</strong> the Study primarily based on IRC publications,MORTH Circulars and relevant recommendations of theinternational standards (American, Australian, British, Canadian,Japanese).4.9.6.2.2 The Design Standards evolved <strong>for</strong> the project shall cover allaspects of detailed design including the design of geometricelements, pavement design, bridges and structures, traffic safetyand materials4.9.6.3 Geometric Design4.9.6.3.1 Based on the data collected from reconnaissance andtopographic surveys, the sections with geometric deficiencies, ifany, should be identified and suitable measures <strong>for</strong> improvementshould be suggested <strong>for</strong> implementation within the right of way.However as safety concern proposal <strong>for</strong> L.A., if any be submittedwithin two months from date of issue of work order.4.9.6.3.2 The detailed design <strong>for</strong> geometric elements shall cover, butnot be limited to the following major aspects:ADB-IV49

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!