12.07.2015 Views

RFP for BHOPAL & Narmadapuram Division - Madhya Pradesh ...

RFP for BHOPAL & Narmadapuram Division - Madhya Pradesh ...

RFP for BHOPAL & Narmadapuram Division - Madhya Pradesh ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

pessimistic and most likely traffic growth. The growth factors shall be workedout <strong>for</strong> five-yearly intervals.4.8.4 Traffic projections should be based on sound and proven <strong>for</strong>ecasting techniques.In case traffic demand estimated is to be made on the basis of a model, theapplication of the model in the similar situation with the validation of the resultsshould be established. The traffic projections should also bring out the possibleimpact of implementation of any competing facility in the near future. Thedemand estimates should also take into account the freight and passenger trafficalong the major corridors that may interconnect with the project. Impact of tollcharges on the traffic estimates should be estimated.4.8.5 The methodology <strong>for</strong> traffic demand estimates described in the precedingparagraphs is <strong>for</strong> normal traffic only. In addition to the estimates <strong>for</strong> normaltraffic, the Consultants shall also work out the estimates <strong>for</strong> generated, inducedand diverted traffic with sound and explicit assumptions, based on studies insimilar geographical areas in the past.4.8.6 The traffic <strong>for</strong>ecasts shall also be made <strong>for</strong> both diverted and generated traffic.The traffic <strong>for</strong>ecast shall also be made, taking into account the effect of toll, incase the toll collection is considered (Para 3.4)4.8.7 Overall traffic <strong>for</strong>ecast thus made shall <strong>for</strong>m the basis <strong>for</strong> the design of eachpavement type and other facilities/ancillary works.4.9 Engineering Surveys and Investigations4.9.1 Reconnaissance and Alignment4.9.1.1 The Consultants should make an in-depth study of the available landwidth (ROW), topographic maps, and other available relevant in<strong>for</strong>mationcollected by them concerning the existing alignment. Consultant has toarrange the required maps and the in<strong>for</strong>mation needed by him from thepotential sources. MPRDC shall provide introductory/support letters, ifrequired.4.9.1.2 The detailed ground reconnaissance may be taken up immediatelyafter the study of maps and other data. The primary tasks to beaccomplished during the reconnaissance surveys include:(i)(ii)(iii)Topographical features of the area;Typical physical features along the existing alignment within andoutside ROW i.e. land use pattern;Possible alignment alternatives, vis-à-vis, scheme <strong>for</strong> the wideningof the existing road;ADB-IV36

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!