(xiii) Accident statistics; and,(xiv) Vehicle loading behaviour (axle load spectrum), if available;(xv) Type and location of existing utility services (e.g. Fibre Optical Cable, O/Hand U/G Electric, Telephone line, Water mains, Sewer, Trees etc.)(xvi) Environmental setting and social baseline of the project.(xvii) Preparation of PPMS base parameter and submitting their values duringpreparation of DPR along with documentary evidence of their values.ADB-IV31
4.7 Traffic Survey4.7.1 Number and Location of Survey Stations4.7.1.1 The type of traffic surveys and the minimum number of surveystations shall normally be as under, unless otherwise specificallymentioned.Sl.NR. Description Number of SurveyStations per 100 km (orminimum numbers forshorter lengths)1. Classified Traffic Volume Count 3 (2)2. Origin-Destination and CommodityMovement CharacteristicsMinimum of 2 per 200km. (2)3. Axle Loading Characteristics 2(1)4. Intersection Volume Count All Major Intersection5. Speed-Delay Characteristics Project Road Section4.7.1.2 The number of survey locations indicated in the table above areindicative only. The Consultants shall, immediately upon award of thework, submit to MPRDC proposals regarding the total number as well asthe locations of the traffic survey stations as part of inception report. Eachdocument shall be duly approved/signed by concerned GM/DM ofMPRDC before submission. Suitable maps and charts should accompanythe proposals clearly indicating the rationale for selecting the location ofsurvey stations.4.7.1.3 The methodology of collection and analysis of data, number andlocation of traffic survey stations shall be finalised in consultation withCoordination Committee / MPRDC. Each document shall be dulyapproved/signed by concerned GM/DM of MPRDC before submission.4.7.2 Classified Traffic Volume Count Survey4.7.2.1 The classified traffic volume count surveys shall be carried out for 7days (continuous, direction-wise) at the selected survey stations. Thevehicle classification system as given in relevant IRC code may befollowed. However, the following generalised classification system issuggested in view of the requirements of traffic demand estimates andeconomic analysis:Motorised Traffic2-Wheeler3-WheelerPassenger CarUtility Vehicle (Jeep, Van etc.)Non-Motorised TrafficBi-CycleCycle-RickshawAnimal Drawn Vehicle (ADV)Hand CartOther Non-Motorised VehicleADB-IV32
- Page 1 and 2: MPRDCDPR - ADB -IVINVITATION FOR CO
- Page 3 and 4: MPRDCDPR - ADB -IVMadhya Pradesh Ro
- Page 5 and 6: MPRDCDPR - ADB -IVMADHYA PRADESH RO
- Page 7 and 8: MPRDCDPR - ADB -IVSection 3 - Techn
- Page 9 and 10: MPRDCDPR - ADB -IVConsultant should
- Page 11 and 12: MPRDCDPR - ADB -IVParticipation of
- Page 13 and 14: MPRDCDPR - ADB -IVType ofProposalCo
- Page 15 and 16: MPRDCDPR - ADB -IV(b)(c)(d)(e)is pr
- Page 17 and 18: MPRDCDPR - ADB -IVspecified in the
- Page 19 and 20: MPRDCDPR - ADB -IVSection - 3DATA S
- Page 21 and 22: MPRDCDPR - ADB -IVRATINGExcellent 1
- Page 23 and 24: NARRATIVE EVALUATION CRITERIAFOR FU
- Page 25 and 26: F. Counterpart Personnel and Facili
- Page 27 and 28: 2.3 The Detailed Project Report wou
- Page 29 and 30: 3.12 Deleted.3.13 In order to have
- Page 31: 4.3 The consultant shall plan the a
- Page 35 and 36: 4.7.3.5 The distribution of lead an
- Page 37 and 38: pessimistic and most likely traffic
- Page 39 and 40: upgrading costs. The detailed topog
- Page 41 and 42: 4.9.2.7 Details of utility Services
- Page 43 and 44: (ii)(iii)(iv)shoulder condition;emb
- Page 45 and 46: section testing shall involve carry
- Page 47 and 48: 4.9.4.2.3 For bridges and cross dra
- Page 49 and 50: 4.9.4.5.3 Environmental restriction
- Page 51 and 52: (i)(ii)(iii)(iv)(v)horizontal align
- Page 53 and 54: Government guidelines, use of flyas
- Page 55 and 56: 4.9.6.9 Arboriculture and Landscapi
- Page 57 and 58: 4.10.1.10 The consultant shall prep
- Page 59 and 60: feasibility and effectiveness of in
- Page 61 and 62: (ii)(iii)(iv)(v)Civil works contrac
- Page 63 and 64: 4.12 Economic Analysis4.12.1 The ro
- Page 65 and 66: 7. Project Team and Project Office
- Page 67 and 68: e presented as separate sections li
- Page 69 and 70: estimation, environmental aspects,
- Page 71 and 72: (ii)(iii)(iv)(v)Locations of median
- Page 73 and 74: that progress could be monitored by
- Page 75 and 76: A. Selection Criteria for ProjectsS
- Page 77 and 78: Handbook on Resettlement -A Guide t
- Page 79 and 80: TABLE SAF1: PROJECT RANKING CRITERI
- Page 81 and 82: Criterion / Consideration Priority
4.7 Traffic Survey4.7.1 Number and Location of Survey Stations4.7.1.1 The type of traffic surveys and the minimum number of surveystations shall normally be as under, unless otherwise specificallymentioned.Sl.NR. Description Number of SurveyStations per 100 km (orminimum numbers <strong>for</strong>shorter lengths)1. Classified Traffic Volume Count 3 (2)2. Origin-Destination and CommodityMovement CharacteristicsMinimum of 2 per 200km. (2)3. Axle Loading Characteristics 2(1)4. Intersection Volume Count All Major Intersection5. Speed-Delay Characteristics Project Road Section4.7.1.2 The number of survey locations indicated in the table above areindicative only. The Consultants shall, immediately upon award of thework, submit to MPRDC proposals regarding the total number as well asthe locations of the traffic survey stations as part of inception report. Eachdocument shall be duly approved/signed by concerned GM/DM ofMPRDC be<strong>for</strong>e submission. Suitable maps and charts should accompanythe proposals clearly indicating the rationale <strong>for</strong> selecting the location ofsurvey stations.4.7.1.3 The methodology of collection and analysis of data, number andlocation of traffic survey stations shall be finalised in consultation withCoordination Committee / MPRDC. Each document shall be dulyapproved/signed by concerned GM/DM of MPRDC be<strong>for</strong>e submission.4.7.2 Classified Traffic Volume Count Survey4.7.2.1 The classified traffic volume count surveys shall be carried out <strong>for</strong> 7days (continuous, direction-wise) at the selected survey stations. Thevehicle classification system as given in relevant IRC code may befollowed. However, the following generalised classification system issuggested in view of the requirements of traffic demand estimates andeconomic analysis:Motorised Traffic2-Wheeler3-WheelerPassenger CarUtility Vehicle (Jeep, Van etc.)Non-Motorised TrafficBi-CycleCycle-RickshawAnimal Drawn Vehicle (ADV)Hand CartOther Non-Motorised VehicleADB-IV32