12.07.2015 Views

RFP for BHOPAL & Narmadapuram Division - Madhya Pradesh ...

RFP for BHOPAL & Narmadapuram Division - Madhya Pradesh ...

RFP for BHOPAL & Narmadapuram Division - Madhya Pradesh ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Section - 5Preparation of Detailed Project Report <strong>for</strong> Rehabilitation, upgradation and strengtheningof Roads in <strong>Madhya</strong> <strong>Pradesh</strong> underADB assisted ADB PHASE-IV Roads1. GeneralTerms of Reference (TOR) <strong>for</strong> Preparation of Detailed Project Report1.1 Government of <strong>Madhya</strong> <strong>Pradesh</strong> is applying to ADB <strong>for</strong> loan <strong>for</strong> ADB Phase-IV <strong>for</strong>the improvement of about 3857.17 Kms of MDR network in <strong>Madhya</strong> <strong>Pradesh</strong> as perAnnexure "A".1.2 <strong>Madhya</strong> <strong>Pradesh</strong> Road Development Corporation has been entrusted theimplementation of ADB PHASE-IV. The improvement work consists ofrehabilitation, strengthening and / or widening of the existing roads and crossdrainage structures / bridges.1.3 The projects under the ADB PHASE-IV will be selected, prepared, and approved inaccordance with selection criteria and approval procedures under the loan. MPRDChas already identified 3857.17 Kms of roads as per Annexure "A" as projects <strong>for</strong>further evaluation in accordance with the selection criteria.1.4 MP Road Development Corporation (the Employer) invites proposals <strong>for</strong> preparation/upgradation of detailed project report including evaluation of projects, in accordancewith the projects selection criteria (Supplement I) <strong>for</strong> rehabilitation and upgradationof 3857.17 kms of roads identified by MPRDC, and eventually to achieve effectivelythe objective of improving connectivity of state road network. For this purpose thetotal road length of 3857.17 kms. have been divided into seven packages.1.5 The appointed consultants shall be expected to adhere to high level of qualitystandards and to the stipulated time schedule.2. Objective2.1 The main objective of the consultancy service is to establish the technical,economical, and financial viability of the projects with due consideration toenvironmental and social safeguards and prepare / update detailed project reports <strong>for</strong>rehabilitation and upgrading of roads as enumerated in Annexure A.2.2 The viability of the projects shall be established taking into account the requirementswith regard to rehabilitation & resettlement, upgrading and improvement based onhighway design, pavement design, provision of service roads wherever necessary,type of intersections, underpasses / flyovers / ROB’s, rehabilitation and widening ofexisting and/or construction of new bridges and structures, road safety features, utilityshifting, quantities of various items of works and cost estimates.ADB-IV25

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!