RFP for BHOPAL & Narmadapuram Division - Madhya Pradesh ...

RFP for BHOPAL & Narmadapuram Division - Madhya Pradesh ... RFP for BHOPAL & Narmadapuram Division - Madhya Pradesh ...

12.07.2015 Views

MPRDC DPR - ADB -IVName of Firm:Positiona. Sr. Highway Engineer CumTeam Leaderb. Highway Engineerc Pavement Specialistd Bridge EngineerE Traffic EngineerfMaterials cum GeoTechnical Engineerg Senior Survey Engineerh Transport EconomistJ Environment SpecialistKLResettlement andRehabilitation SpecialistSocial DevelopmentSpecialistPERSONNEL EVALUATION SHEET FOR FULL TECHNICAL PROPOSAL (QCBS)NAMEA B C DGeneral Qualifications Project-Related Overseas Full-TimeExperience Experience Permanent Staff20% 60% 15%(10% TL) 5%(10% TL)Rating Score Rating Score Rating Score Rating ScoreM Quantity Surveyor /Documentation ExpertRating: Excellent - 100% Very Good - 90% Good - 80% Average - 75% Non-complying - 0%Notes: *Applicable to both lead and associate firms.CONFIDENTIALTOTALSCORE(A+B+C+D)ADB-IV21

NARRATIVE EVALUATION CRITERIAFOR FULL TECHNICAL PROPOSAL (FTP)Annexure - 1I. QUALIFICATION OF PROPOSER (250 Points)A. Experience in Preparation of Detailed Project Reports (200 points)Criteria: Firm should have successfully prepared Detailed Project Report during last 5years for at least aggregate length of 600 KM of 2 laning/intermediate lane orequivalent highway project (SH/NH/Expressway etc.) for 75% of points. No weightagewill be given for experience of preparing feasibility report.Factors to consider: Each reference project included in the technical proposal withsingle assignment of minimum 100 KM length (One Unit) of 2 laning orintermediate lane/equivalent highway project (MDR/SH/NH/Expressway etc.) willonly be judged for calculating the aggregate length. Higher scores will be given to afirm, which has more experiences for projects with relevant nature.RatingExcellent 100% more than 10 unitVery Good 90% 10 UnitGood 80% 8 UnitAverage 75% 6 UnitNot complying 0%The satisfactory completion certificate issued by the Principal Employer should beattached in support of the experience.B. Experience in Similar Geographical Areas (50 points)Criteria: Extent of experience in India or similar geographical region like, Nepal,Bangladesh, Bhutan, Pakistan, Sri Lanka, Afghanistan, Myanmar, etc. with the criteriamentioned in Para "A" above will only be considered.II. APPROACH AND METHODOLOGY (50 Points)A. Understanding of Objectives (5 points)Criteria: General understanding of the project requirements; coverage of principalcomponents as requested in TOR; and site visit assessment.Factors to consider: The three following aspects will be considered:ADB-IV22

NARRATIVE EVALUATION CRITERIAFOR FULL TECHNICAL PROPOSAL (FTP)Annexure - 1I. QUALIFICATION OF PROPOSER (250 Points)A. Experience in Preparation of Detailed Project Reports (200 points)Criteria: Firm should have successfully prepared Detailed Project Report during last 5years <strong>for</strong> at least aggregate length of 600 KM of 2 laning/intermediate lane orequivalent highway project (SH/NH/Expressway etc.) <strong>for</strong> 75% of points. No weightagewill be given <strong>for</strong> experience of preparing feasibility report.Factors to consider: Each reference project included in the technical proposal withsingle assignment of minimum 100 KM length (One Unit) of 2 laning orintermediate lane/equivalent highway project (MDR/SH/NH/Expressway etc.) willonly be judged <strong>for</strong> calculating the aggregate length. Higher scores will be given to afirm, which has more experiences <strong>for</strong> projects with relevant nature.RatingExcellent 100% more than 10 unitVery Good 90% 10 UnitGood 80% 8 UnitAverage 75% 6 UnitNot complying 0%The satisfactory completion certificate issued by the Principal Employer should beattached in support of the experience.B. Experience in Similar Geographical Areas (50 points)Criteria: Extent of experience in India or similar geographical region like, Nepal,Bangladesh, Bhutan, Pakistan, Sri Lanka, Afghanistan, Myanmar, etc. with the criteriamentioned in Para "A" above will only be considered.II. APPROACH AND METHODOLOGY (50 Points)A. Understanding of Objectives (5 points)Criteria: General understanding of the project requirements; coverage of principalcomponents as requested in TOR; and site visit assessment.Factors to consider: The three following aspects will be considered:ADB-IV22

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!