- Page 1 and 2: MPRDCDPR - ADB -IVINVITATION FOR CO
- Page 3 and 4: MPRDCDPR - ADB -IVMadhya Pradesh Ro
- Page 5 and 6: MPRDCDPR - ADB -IVMADHYA PRADESH RO
- Page 7 and 8: MPRDCDPR - ADB -IVSection 3 - Techn
- Page 9 and 10: MPRDCDPR - ADB -IVConsultant should
- Page 11 and 12: MPRDCDPR - ADB -IVParticipation of
- Page 13 and 14: MPRDCDPR - ADB -IVType ofProposalCo
- Page 15 and 16: MPRDCDPR - ADB -IV(b)(c)(d)(e)is pr
- Page 17 and 18: MPRDCDPR - ADB -IVspecified in the
- Page 19: MPRDCDPR - ADB -IVSection - 3DATA S
- Page 23 and 24: NARRATIVE EVALUATION CRITERIAFOR FU
- Page 25 and 26: F. Counterpart Personnel and Facili
- Page 27 and 28: 2.3 The Detailed Project Report wou
- Page 29 and 30: 3.12 Deleted.3.13 In order to have
- Page 31 and 32: 4.3 The consultant shall plan the a
- Page 33 and 34: 4.7 Traffic Survey4.7.1 Number and
- Page 35 and 36: 4.7.3.5 The distribution of lead an
- Page 37 and 38: pessimistic and most likely traffic
- Page 39 and 40: upgrading costs. The detailed topog
- Page 41 and 42: 4.9.2.7 Details of utility Services
- Page 43 and 44: (ii)(iii)(iv)shoulder condition;emb
- Page 45 and 46: section testing shall involve carry
- Page 47 and 48: 4.9.4.2.3 For bridges and cross dra
- Page 49 and 50: 4.9.4.5.3 Environmental restriction
- Page 51 and 52: (i)(ii)(iii)(iv)(v)horizontal align
- Page 53 and 54: Government guidelines, use of flyas
- Page 55 and 56: 4.9.6.9 Arboriculture and Landscapi
- Page 57 and 58: 4.10.1.10 The consultant shall prep
- Page 59 and 60: feasibility and effectiveness of in
- Page 61 and 62: (ii)(iii)(iv)(v)Civil works contrac
- Page 63 and 64: 4.12 Economic Analysis4.12.1 The ro
- Page 65 and 66: 7. Project Team and Project Office
- Page 67 and 68: e presented as separate sections li
- Page 69 and 70: estimation, environmental aspects,
- Page 71 and 72:
(ii)(iii)(iv)(v)Locations of median
- Page 73 and 74:
that progress could be monitored by
- Page 75 and 76:
A. Selection Criteria for ProjectsS
- Page 77 and 78:
Handbook on Resettlement -A Guide t
- Page 79 and 80:
TABLE SAF1: PROJECT RANKING CRITERI
- Page 81 and 82:
Criterion / Consideration Priority
- Page 83 and 84:
A2 : Local AlignmentA3 : JunctionsA
- Page 85 and 86:
C3 : JunctionsC4 : Non-Motorised ro
- Page 87 and 88:
Schedule for Submission of Reports
- Page 89 and 90:
4. Bridge Engineeri) Educational Qu
- Page 91 and 92:
11. Social Development Specialisti)
- Page 93 and 94:
(Form-III)FIRM’S REFERENCESReleva
- Page 95 and 96:
(Form-V)COMMENTS/ SUGGESTIONS OF CO
- Page 97 and 98:
(Form-VII)Format of Curriculum Vita
- Page 99 and 100:
(Form-IX)A. FIELD INVESTIGATION(1st
- Page 101 and 102:
FORM FIN-1FINANCIAL PROPOSALS ForPa
- Page 103 and 104:
LIST OF ADB MEMBER COUNTRIES1. AFG
- Page 105 and 106:
Agreement & General Conditions of C
- Page 107 and 108:
7. Responsibility for accuracy of t
- Page 109 and 110:
(a) The Consultants shall carry out
- Page 111 and 112:
1.2 Relation between the PartiesNot
- Page 113 and 114:
2.6 ModificationModification of the
- Page 115 and 116:
(e)(f)if, as the result of Force Ma
- Page 117 and 118:
or in the Discharge of their obliga
- Page 119 and 120:
(b)If required to comply with the p
- Page 121 and 122:
value. Such bank guarantee (i) to r
- Page 123 and 124:
7.4 ACTION FOR DEFICIENCY IN SERVIC
- Page 125 and 126:
APPENDIX- IFORM OF BANK GUARANTEERe