- Page 1 and 2:
MPRDCDPR - ADB -IVINVITATION FOR CO
- Page 3 and 4:
MPRDCDPR - ADB -IVMadhya Pradesh Ro
- Page 5 and 6:
MPRDCDPR - ADB -IVMADHYA PRADESH RO
- Page 7 and 8:
MPRDCDPR - ADB -IVSection 3 - Techn
- Page 9 and 10:
MPRDCDPR - ADB -IVConsultant should
- Page 11 and 12:
MPRDCDPR - ADB -IVParticipation of
- Page 13 and 14:
MPRDCDPR - ADB -IVType ofProposalCo
- Page 15 and 16:
MPRDCDPR - ADB -IV(b)(c)(d)(e)is pr
- Page 17 and 18:
MPRDCDPR - ADB -IVspecified in the
- Page 19 and 20:
MPRDCDPR - ADB -IVSection - 3DATA S
- Page 21 and 22:
MPRDCDPR - ADB -IVRATINGExcellent 1
- Page 23 and 24:
NARRATIVE EVALUATION CRITERIAFOR FU
- Page 25 and 26:
F. Counterpart Personnel and Facili
- Page 27 and 28:
2.3 The Detailed Project Report wou
- Page 29 and 30:
3.12 Deleted.3.13 In order to have
- Page 31 and 32:
4.3 The consultant shall plan the a
- Page 33 and 34:
4.7 Traffic Survey4.7.1 Number and
- Page 35 and 36:
4.7.3.5 The distribution of lead an
- Page 37 and 38:
pessimistic and most likely traffic
- Page 39 and 40:
upgrading costs. The detailed topog
- Page 41 and 42:
4.9.2.7 Details of utility Services
- Page 43 and 44:
(ii)(iii)(iv)shoulder condition;emb
- Page 45 and 46:
section testing shall involve carry
- Page 47 and 48:
4.9.4.2.3 For bridges and cross dra
- Page 49 and 50:
4.9.4.5.3 Environmental restriction
- Page 51 and 52:
(i)(ii)(iii)(iv)(v)horizontal align
- Page 53 and 54:
Government guidelines, use of flyas
- Page 55 and 56:
4.9.6.9 Arboriculture and Landscapi
- Page 57 and 58:
4.10.1.10 The consultant shall prep
- Page 59 and 60:
feasibility and effectiveness of in
- Page 61 and 62:
(ii)(iii)(iv)(v)Civil works contrac
- Page 63 and 64:
4.12 Economic Analysis4.12.1 The ro
- Page 65 and 66:
7. Project Team and Project Office
- Page 67 and 68:
e presented as separate sections li
- Page 69 and 70:
estimation, environmental aspects,
- Page 71 and 72:
(ii)(iii)(iv)(v)Locations of median
- Page 73 and 74:
that progress could be monitored by
- Page 75 and 76: A. Selection Criteria for ProjectsS
- Page 77 and 78: Handbook on Resettlement -A Guide t
- Page 79 and 80: TABLE SAF1: PROJECT RANKING CRITERI
- Page 81 and 82: Criterion / Consideration Priority
- Page 83 and 84: A2 : Local AlignmentA3 : JunctionsA
- Page 85 and 86: C3 : JunctionsC4 : Non-Motorised ro
- Page 87 and 88: Schedule for Submission of Reports
- Page 89 and 90: 4. Bridge Engineeri) Educational Qu
- Page 91 and 92: 11. Social Development Specialisti)
- Page 93 and 94: (Form-III)FIRM’S REFERENCESReleva
- Page 95 and 96: (Form-V)COMMENTS/ SUGGESTIONS OF CO
- Page 97 and 98: (Form-VII)Format of Curriculum Vita
- Page 99 and 100: (Form-IX)A. FIELD INVESTIGATION(1st
- Page 101 and 102: FORM FIN-1FINANCIAL PROPOSALS ForPa
- Page 103 and 104: LIST OF ADB MEMBER COUNTRIES1. AFG
- Page 105 and 106: Agreement & General Conditions of C
- Page 107 and 108: 7. Responsibility for accuracy of t
- Page 109 and 110: (a) The Consultants shall carry out
- Page 111 and 112: 1.2 Relation between the PartiesNot
- Page 113 and 114: 2.6 ModificationModification of the
- Page 115 and 116: (e)(f)if, as the result of Force Ma
- Page 117 and 118: or in the Discharge of their obliga
- Page 119 and 120: (b)If required to comply with the p
- Page 121 and 122: value. Such bank guarantee (i) to r
- Page 123 and 124: 7.4 ACTION FOR DEFICIENCY IN SERVIC
- Page 125: APPENDIX- IFORM OF BANK GUARANTEERe