GSC Sentinel-2 PDGS STBD - emits - ESA

GSC Sentinel-2 PDGS STBD - emits - ESA GSC Sentinel-2 PDGS STBD - emits - ESA

emits.esa.int
from emits.esa.int More from this publisher
12.07.2015 Views

GSC Sentinel-2 PDGS STBDIssue 1 Revision 2 (draft) - 25.07.2010GMES-GSEG-EOPG-TN-09-0031page 17 of 60Processing StepLevel-0 Viewing ModelInitialisationPreliminary QuicklookProcessingPreliminary Cloud MaskProcessingPreliminary QuicklookCompressionLevel-1 Viewing ModelInitialisationAssociated GPP reference(IAS and applicablephase/functions as relevant)InitLocInv 0,58InitLocInvCloudInvJP2KCompressionEstimatedTime (h)w/o noparallelisation0,37InitLocProd 0,1Decompression MRCPBG 5,1Level-1A RadiometricProcessingLevel-1B RadiometricProcessingRadioS2 (up to Level-1A)RadioS2 (From Level-1A to1B)CommentsLast step of theLevel-0processingconsolidationLevel-1A Compression JP2KCompression 9,6 Last step of theLevel-1AprocessingCommon Geometry GridComputation for Image-GRIRegistrationRespampling on CommonGeometry Grid for Image-GRI RegistrationTie Points Collection forImage-GRI RegistrationTie Points Filtering forImage-GRI RegistrationSpatiotriangulation forImage-GRI RegistrationGeoS2 (Phases 1-6)GeoS2 (Phases 7-8)GeoS2 (Phases 9-10)GeoS2 (Phases 9-10)GeoS2 (Phase 11)10,710,0ESA UNCLASSIFIED – For Official Use© ESAThe copyright of this document is the property of ESA. It is supplied in confidence and shall not be reproduced, copied orcommunicated to any third party without written permission from ESA.

GSC Sentinel-2 PDGS STBDIssue 1 Revision 2 (draft) - 25.07.2010GMES-GSEG-EOPG-TN-09-0031page 18 of 60Processing StepCommon Geometry GridComputation for VNIR-SWIR RegistrationRespampling on CommonGeometry Grid for VNIR-SWIR RegistrationTie Points Collection forVNIR-SWIR RegistrationTie Points Filtering forVNIR-SWIR RegistrationSpatiotriangulation forVNIR-SWIR RegistrationAssociated GPP reference(IAS and applicablephase/functions as relevant)GeoS2 (Phases 1-6)GeoS2 (Phases 7-8)GeoS2 (Phases 9-10)GeoS2 (Phases 9-10)GeoS2 (Phase 11)EstimatedTime (h)w/o noparallelisationTBDTBDTBDTBDCommentsLevel-1B Compression JP2KCompression 9,6 Last step of theLevel-1BprocessingLevel-1C Tiles AssociationLevel-1C Resampling GridComputationResampling on Level-1CGeometryMasks ComputationResampleS2 (ModuleTilingS2)ResampleS2 (Phases 1-7)ResampleS2 (Phase 8)MaskS2Level-1C Compression JP2KCompression 9,6 Last step of theLevel-1CprocessingTBD25,121,4Table 3: Benchmarked bulk processing times3.2.2.3 Overall processing times by product levelHere after the summary of the benchmarked processing times for the different productlevels. These values are obtained summing all the processing times associated to theelementary processing steps implemented to generate a product of Level-1A, 1B or 1C. Inthe last row of the table the estimated time of a production up to Level-1C with intermediaryproducts (1A and 1B) compressed in JP2K and delivered; the time necessary for theJPEG2000 compression is then considered three times.ESA UNCLASSIFIED – For Official Use© ESAThe copyright of this document is the property of ESA. It is supplied in confidence and shall not be reproduced, copied orcommunicated to any third party without written permission from ESA.

<strong>GSC</strong> <strong>Sentinel</strong>-2 <strong>PDGS</strong> <strong>STBD</strong>Issue 1 Revision 2 (draft) - 25.07.2010GMES-GSEG-EOPG-TN-09-0031page 18 of 60Processing StepCommon Geometry GridComputation for VNIR-SWIR RegistrationRespampling on CommonGeometry Grid for VNIR-SWIR RegistrationTie Points Collection forVNIR-SWIR RegistrationTie Points Filtering forVNIR-SWIR RegistrationSpatiotriangulation forVNIR-SWIR RegistrationAssociated GPP reference(IAS and applicablephase/functions as relevant)GeoS2 (Phases 1-6)GeoS2 (Phases 7-8)GeoS2 (Phases 9-10)GeoS2 (Phases 9-10)GeoS2 (Phase 11)EstimatedTime (h)w/o noparallelisationTBDTBDTBDTBDCommentsLevel-1B Compression JP2KCompression 9,6 Last step of theLevel-1BprocessingLevel-1C Tiles AssociationLevel-1C Resampling GridComputationResampling on Level-1CGeometryMasks ComputationResampleS2 (ModuleTilingS2)ResampleS2 (Phases 1-7)ResampleS2 (Phase 8)MaskS2Level-1C Compression JP2KCompression 9,6 Last step of theLevel-1CprocessingTBD25,121,4Table 3: Benchmarked bulk processing times3.2.2.3 Overall processing times by product levelHere after the summary of the benchmarked processing times for the different productlevels. These values are obtained summing all the processing times associated to theelementary processing steps implemented to generate a product of Level-1A, 1B or 1C. Inthe last row of the table the estimated time of a production up to Level-1C with intermediaryproducts (1A and 1B) compressed in JP2K and delivered; the time necessary for theJPEG2000 compression is then considered three times.<strong>ESA</strong> UNCLASSIFIED – For Official Use© <strong>ESA</strong>The copyright of this document is the property of <strong>ESA</strong>. It is supplied in confidence and shall not be reproduced, copied orcommunicated to any third party without written permission from <strong>ESA</strong>.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!