FOG-412ChapterSHOULDERS(B000)SubjectBituminous Edging, Unpaved Shoulders(B540)DESCRIPTIONSCHEDULINGGrading, shaping, and adding the necessary bituminous mix to raise theshoulder grade to match the roadway surface (Section Required)Schedule this activity during the warm months.RECOMMENDEDPERSONNEL Highway Superintendent (1)Highway Equipment Operator (9)Traffic Control (2)RECOMMENDEDEQUIPMENT Pickup truck (1)Dump truck (3)Loader (1)Grader (1)Roller (1)Distributor (1)Broom (1)Grader/Spreader (1)Tractor to pull broom (1)RECOMMENDEDNote: Distance may require additional trucks.MATERIALS Liquid asphalt (92 gallons)Bituminous mix (hot or cold)(100 tons)Chip (as necessary)ENVIRONMENTALIMPACTS Precondition equipment before loading bituminous material. Do not use diesel fuel. Return tool-cleaning solvents to the lot. Follow procedures in the Environmental Handbook (2.1.1, “CleaningAsphalt Tools and Equipment”) for cleaning at the end of the job.10/11 Page 1 of 2

SHOULDERS (B000)Bituminous Edging, Unpaved Shoulders (B540)FOG-412PERFORMANCEVALUESFUNCTION Hours Per Unit 0.960 Daily Expectation 100 Accomplishment UnitTonFE01RECOMMENDEDPROCEDURE1. Discuss with crew the requirements of the job.2. Place traffic-control devices as necessary3. Trench area adjacent to roadway surface for edging.4. Prime area that has been prepared.5. Place bituminous mix.6. Edge 18 inches wide. Smooth material to match grade of existingsurface and to meet shoulder grade 18 inches from edge ofpavement.7. Compact material, using a roller.8. Remove traffic-control devices.Note: Determine accomplishment before leaving job site.10/11 Page 2 of 2

FOG-412ChapterSHOULDERS(B000)SubjectBituminous Edging, Unpaved Shoulders(B540)DESCRIPTIONSCHEDULINGGrading, shaping, and adding the necessary bituminous mix to raise theshoulder grade to match the roadway surface (Section Required)Schedule this activity during the warm months.RECOMMENDEDPERSONNEL Highway Superintendent (1)Highway Equipment Operator (9)Traffic Control (2)RECOMMENDEDEQUIPMENT Pickup truck (1)Dump truck (3)Loader (1)Grader (1)Roller (1)Distributor (1)Broom (1)Grader/Spreader (1)Tractor to pull broom (1)RECOMMENDEDNote: Distance may require additional trucks.MATERIALS Liquid asphalt (92 gallons)Bituminous mix (hot or cold)(100 tons)Chip (as necessary)ENVIRONMENTALIMPACTS Precondition equipment before loading bituminous material. Do not use diesel fuel. Return tool-cleaning solvents to the lot. Follow procedures in the Environmental Handbook (2.1.1, “CleaningAsphalt Tools and Equipment”) for cleaning at the end of the job.10/11 Page 1 of 2