FOG-412ChapterSHOULDERS(B000)SubjectBituminous Edging, Unpaved Shoulders(B540)DESCRIPTIONSCHEDULINGGrading, shaping, and adding the necessary bituminous mix to raise theshoulder grade to match the roadway surface (Section Required)Schedule this activity during the warm months.RECOMMENDEDPERSONNEL Highway Superintendent (1)Highway Equipment Operator (9)Traffic Control (2)RECOMMENDEDEQUIPMENT Pickup truck (1)Dump truck (3)Loader (1)Grader (1)Roller (1)Distributor (1)Broom (1)Grader/Spreader (1)Tractor to pull broom (1)RECOMMENDEDNote: Distance may require additional trucks.MATERIALS Liquid asphalt (92 gallons)Bituminous mix (hot or cold)(100 tons)Chip (as necessary)ENVIRONMENTALIMPACTS Precondition equipment before loading bituminous material. Do not use diesel fuel. Return tool-cleaning solvents to the lot. Follow procedures in the Environmental Handbook (2.1.1, “CleaningAsphalt Tools and Equipment”) for cleaning at the end of the job.10/11 Page 1 of 2
SHOULDERS (B000)Bituminous Edging, Unpaved Shoulders (B540)FOG-412PERFORMANCEVALUESFUNCTION Hours Per Unit 0.960 Daily Expectation 100 Accomplishment UnitTonFE01RECOMMENDEDPROCEDURE1. Discuss with crew the requirements of the job.2. Place traffic-control devices as necessary3. Trench area adjacent to roadway surface for edging.4. Prime area that has been prepared.5. Place bituminous mix.6. Edge 18 inches wide. Smooth material to match grade of existingsurface and to meet shoulder grade 18 inches from edge ofpavement.7. Compact material, using a roller.8. Remove traffic-control devices.Note: Determine accomplishment before leaving job site.10/11 Page 2 of 2
- Page 24 and 25: FOG-302ChapterSURFACE(A000)SubjectP
- Page 26 and 27: FOG-303ChapterSURFACE(A000)SubjectA
- Page 28 and 29: FOG-304ChapterSURFACE(A000)SubjectP
- Page 30 and 31: FOG-305ChapterSURFACE(A000)SubjectS
- Page 32 and 33: FOG-306ChapterSURFACE(A000)SubjectJ
- Page 34 and 35: FOG-307ChapterSURFACE(A000)SubjectJ
- Page 36 and 37: FOG-308ChapterSURFACE(A000)SubjectM
- Page 38 and 39: SURFACE (A000)Routine Traffic-Bound
- Page 40 and 41: SURFACE (A000)Patching with Traffic
- Page 42 and 43: FOG-312ChapterSURFACE(A000)SubjectV
- Page 44 and 45: FOG-313ChapterSURFACE(A000)SubjectM
- Page 46 and 47: FOG-314ChapterSURFACE(A000)SubjectS
- Page 48 and 49: FOG-315ChapterSURFACE(A000)SubjectM
- Page 50 and 51: FOG-317ChapterSURFACE(A000)SubjectB
- Page 52 and 53: FOG-318ChapterSURFACE(A000)SubjectM
- Page 54 and 55: FOG-401ChapterSHOULDERS(B000)Subjec
- Page 56 and 57: FOG-402ChapterSHOULDERS(B000)Subjec
- Page 58 and 59: FOG-403ChapterSHOULDERS(B000)Subjec
- Page 60 and 61: FOG-404ChapterSHOULDERS(B000)Subjec
- Page 62 and 63: FOG-405ChapterSHOULDERS(B000)Subjec
- Page 64 and 65: FOG-406ChapterSHOULDERS(B000)Subjec
- Page 66 and 67: FOG-407ChapterSHOULDERS(B000)Subjec
- Page 68 and 69: FOG-409ChapterSHOULDERS(B000)Subjec
- Page 70 and 71: FOG-410ChapterSHOULDERS(B000)Subjec
- Page 72 and 73: FOG-411ChapterSHOULDERS(B000)Subjec
- Page 76 and 77: FOG-413ChapterSHOULDERS(B000)Subjec
- Page 78 and 79: ROADSIDE GENERAL (C000)Repair to Ro
- Page 80 and 81: ROADSIDE GENERAL (C000)Repair to La
- Page 82 and 83: ROADSIDE GENERAL (C000)Rest Area At
- Page 84 and 85: FOG-505ChapterROADSIDE GENERAL(C000
- Page 86 and 87: ROADSIDE GENERAL (C000)Litter Clean
- Page 88 and 89: ROADSIDE GENERAL (C000)Litter Clean
- Page 90 and 91: ROADSIDE GENERAL (C000)Dead Animal
- Page 92 and 93: FOG-510ChapterROADSIDE GENERAL(C000
- Page 94 and 95: ROADSIDE GENERAL (C000)Energy-Absor
- Page 96 and 97: ROADSIDE GENERAL (C000)Fence Repair
- Page 98 and 99: ROADSIDE GENERAL (C000)Repair or In
- Page 100 and 101: ROADSIDE GENERAL (C000)Repair or In
- Page 102 and 103: FOG-516ChapterROADSIDE GENERAL(C000
- Page 104 and 105: FOG-518ChapterROADSIDE GENERAL(C000
- Page 106 and 107: ROADSIDE AGRONOMY (E000)Brush & Tre
- Page 108 and 109: ROADSIDE AGRONOMY (E000)Mechanical
- Page 110 and 111: FOG-604ChapterROADSIDE AGRONOMY(E00
- Page 112 and 113: FOG-605ChapterROADSIDE AGRONOMY(E00
- Page 114 and 115: FOG-606ChapterROADSIDE AGRONOMY(E00
- Page 116 and 117: FOG-607ChapterROADSIDE AGRONOMY(E00
- Page 118 and 119: FOG-608ChapterROADSIDE AGRONOMY(E00
- Page 120 and 121: FOG-609ChapterROADSIDE AGRONOMY(E00
- Page 122 and 123: FOG-610ChapterROADSIDE AGRONOMY(E00
FOG-412ChapterSHOULDERS(B000)SubjectBituminous Edging, Unpaved Shoulders(B540)DESCRIPTIONSCHEDULINGGrading, shaping, and adding the necessary bituminous mix to raise theshoulder grade to match the roadway surface (Section Required)Schedule this activity during the warm months.RECOMMENDEDPERSONNEL Highway Superintendent (1)Highway Equipment Operator (9)Traffic Control (2)RECOMMENDEDEQUIPMENT Pickup truck (1)Dump truck (3)Loader (1)Grader (1)Roller (1)Distributor (1)Broom (1)Grader/Spreader (1)Tractor to pull broom (1)RECOMMENDEDNote: Distance may require additional trucks.MATERIALS Liquid asphalt (92 gallons)Bituminous mix (hot or cold)(100 tons)Chip (as necessary)ENVIRONMENTALIMPACTS Precondition equipment before loading bituminous material. Do not use diesel fuel. Return tool-cleaning solvents to the lot. Follow procedures in the Environmental Handbook (2.1.1, “CleaningAsphalt Tools and Equipment”) for cleaning at the end of the job.10/11 Page 1 of 2