FOG-313ChapterSURFACE(A000)SubjectMud Jacking(A440)DESCRIPTIONSCHEDULINGPumping materials such as soil cement slurry into voids under concretepavement to raise the pavement to a desired elevation or to fill voidsunder the pavement (Section Required)As requiredRECOMMENDEDPERSONNEL Highway Superintendent (1)Highway Equipment Operator (7)RECOMMENDEDEQUIPMENT Mud-jack machine (1)Dump truck (2)Compressor (1)Jackhammer (2)Water truck (1)Crew cab (1)Core drill (optional) (1)RECOMMENDEDMATERIALSCementLimestone dustWaterENVIRONMENTALIMPACTSN/APERFORMANCEVALUESFUNCTION Hours Per Unit 12.800 Daily Expectation 100 Accomplishment UnitSquare YardFE0110/11 Page 1 of 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!