FOG-312ChapterSURFACE(A000)SubjectVendor-Aided Patching(A150)DESCRIPTIONAny patching in which a vendor, along with state forces, participates in aportion of the work (equipment, labor, etc.)This activity covers cost of all state personnel when using FE01maintenance money. (Section Required)SCHEDULINGAs requiredRECOMMENDEDPERSONNELN/ARECOMMENDEDEQUIPMENTN/ARECOMMENDEDMATERIALSN/AENVIRONMENTALIMPACTS Precondition equipment before loading bituminous material. Do not use diesel fuel. Return tool-cleaning solvents to the lot. Follow procedures in the Environmental Handbook (2.1.1, “CleaningAsphalt Tools and Equipment”) for cleaning at the end of the job.PERFORMANCEVALUESFUNCTION Hours Per Unit Daily Expectation Accomplishment UnitFE01N/AN/ATon10/11 Page 1 of 2

SURFACE (A000)Vendor-Aided Patching (A150)FOG-312RECOMMENDEDPROCEDURE1. Discuss with crew the requirements of the job.2. Place traffic-control devices as necessary.3. Clean surface, if required, prior to application of tack coat to surface.4. Apply tack coat of heated liquid asphalt to existing surface, makingsure entire area is covered.5. Apply bituminous mix with paver or grader in layers no more thantwo inches or less than one inch in depth. Square ends.6. Roll for proper compaction after each layer.7. Check for proper crown or cross slope before leaving project. Correctany deficiencies.8. Remove traffic-control devices.Special Note: Determine accomplishment before leaving job site.10/11 Page 2 of 2

SURFACE (A000)Vendor-Aided Patching (A150)FOG-312RECOMMENDEDPROCEDURE1. Discuss with crew the requirements of the job.2. Place traffic-control devices as necessary.3. Clean surface, if required, prior to application of tack coat to surface.4. Apply tack coat of heated liquid asphalt to existing surface, makingsure entire area is covered.5. Apply bituminous mix with paver or grader in layers no more thantwo inches or less than one inch in depth. Square ends.6. Roll for proper compaction after each layer.7. Check for proper crown or cross slope before leaving project. Correctany deficiencies.8. Remove traffic-control devices.Special Note: Determine accomplishment before leaving job site.10/11 Page 2 of 2