12.07.2015 Views

Field Operations Guide - Kentucky Transportation Cabinet

Field Operations Guide - Kentucky Transportation Cabinet

Field Operations Guide - Kentucky Transportation Cabinet

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

FOG-1504ChapterTRAFFIC(T000)SubjectTraffic Signal Modification(T440)DESCRIPTIONModifying existing traffic signal installations, which include improvingsignal head arrangements and configurations or providing additionalsignal phasing, which requires sophisticated new controllers or detectionThis activity includes any improvements to signal installations not due tosignal malfunctions or breakdowns. Exchanging controller of the samekind due to failure does not apply. (Section Required)SCHEDULINGSchedule modification of signal installation as the changes to traffic flowsand operations dictate the need for additional signal phasing or features.RECOMMENDEDPERSONNEL Highway Signal Installer/Repairer (1)Necessary Safety PersonnelRECOMMENDEDEQUIPMENT Bucket or ladder truck (1)Concrete saw (1)RECOMMENDEDMATERIALSSignals and controllersHardwareENVIRONMENTALIMPACTSNonePERFORMANCEVALUESFUNCTION Hours Per Unit Daily Expectation Accomplishment UnitFE04N/AN/AHour10/11 Page 1 of 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!