FOG-1501ChapterTRAFFIC(T000)SubjectTraffic Signal Installation(T400)DESCRIPTIONSCHEDULINGPreparing signal controllers for specific demands by intersection;installing poles, controller cabinet, detection devices, if needed; andwiring, spanning, and hooking up service (Section Required)Schedule as warrants are justified and engineering judgment dictates aneed for traffic signal control.RECOMMENDEDPERSONNEL Highway Signal Installer/Repairer (1)Highway Signal Crew Leader (1)Engineer (1)Light Equipment Operator (1)Necessary Safety PersonnelRECOMMENDEDEQUIPMENT Bucket or ladder truck (1)Line truck (1)Concrete sawsFlatbed (1)Crew cab (1)Trenching machine (1)Levelator (1)RECOMMENDEDMATERIALSSignals and controllersHardwareENVIRONMENTALIMPACTSNonePERFORMANCEVALUES Hours Per Unit Daily Expectation Accomplishment UnitN/AN/AHour10/11 Page 1 of 2

TRAFFIC (T000)Traffic Signal Installation (T400)FOG-1501FUNCTIONFE04RECOMMENDEDPROCEDURE1. Prepare controller wiring in shop to meet specific needs ofintersection demands.2. Place safety-control devices.3. Set poles and anchors for spanning.4. Install span wires.5. Install controller cabinet and hand-signal head.6. Install detectors for actuated signals.7. Complete wiring from signal indications to controllers.8. Complete hook-up to electrical service.9. Check out signal operation for efficient timing and correct operationof traffic signals.10. Remove traffic-control devices.10/11 Page 2 of 2

TRAFFIC (T000)Traffic Signal Installation (T400)FOG-1501FUNCTIONFE04RECOMMENDEDPROCEDURE1. Prepare controller wiring in shop to meet specific needs ofintersection demands.2. Place safety-control devices.3. Set poles and anchors for spanning.4. Install span wires.5. Install controller cabinet and hand-signal head.6. Install detectors for actuated signals.7. Complete wiring from signal indications to controllers.8. Complete hook-up to electrical service.9. Check out signal operation for efficient timing and correct operationof traffic signals.10. Remove traffic-control devices.10/11 Page 2 of 2