FOG-301ChapterSURFACE(A000)SubjectPothole Patching(A010)DESCRIPTIONSCHEDULINGHand-patching roadway surfaces, including bridge decks, with bituminousmaterial, using hand tools to correct abrupt depressions, edge failures,and other surface deformities (Section Required)Schedule repairs of surface failures year-round. Unless the failurepresents a dangerous condition to motorists, allow the surface area todry before repairing it.RECOMMENDEDPERSONNEL Highway Equipment Operator (5)RECOMMENDEDEQUIPMENT Dump truck (1)Pickup truck (1)Truck-Mounted Attenuator (optional) (1)Distributor (optional) (1)RECOMMENDEDMATERIALS Bituminous mix (7 tons)Liquid asphalt (optional)(14 gallons)ENVIRONMENTALIMPACTS Precondition equipment before loading. Do not use diesel fuel at the job site. Return tool-cleaning solvents to the lot. Follow procedures in the Environmental Handbook (2.1.1, “CleaningAsphalt Tools and Equipment”) for cleaning at the end of the job.PERFORMANCEVALUES Hours Per Unit 5.714 Daily Expectation 7 Accomplishment UnitTon10/11 Page 1 of 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!