Field Operations Guide - Kentucky Transportation Cabinet
Field Operations Guide - Kentucky Transportation Cabinet Field Operations Guide - Kentucky Transportation Cabinet
EXTRAORDINARY (M000)Emergency Repair of Rock Falls & Removal of Debris (M010)FOG-1101RECOMMENDEDPROCEDURE1. Place traffic-control devices as necessary.2. Pick up rock fall, earth, or debris from ditch, shoulder, or roadwaysurface.3. Pick up traffic-control devices.Note: If loading equipment is not required or available, use anonstandard crew. Frequently, a rock pickup patrol, using two men inone truck, performs this operation.Special Note: Determine accomplishment before leaving job site.Properly dispose of all waste.10/11 Page 2 of 2
FOG-1102ChapterEXTRAORDINARY(M000)SubjectEmergency Repair of Landslides &Sinkholes & Removal of Debris(M020)DESCRIPTIONPerforming emergency repair of fills and roadway damaged by slips orsettlementsInclude contractor cost as a direct cost in this activity. (Section Required)SCHEDULINGPerform only as higher authority directs.RECOMMENDEDPERSONNELAs requiredRECOMMENDEDEQUIPMENTAs requiredRECOMMENDEDMATERIALSPiling (timber, sheet, railroad rail)Rip rapGabionsCribbingOther material as neededENVIRONMENTALIMPACTS CORPS of Engineers may require a permit to work around streams. Perform all work in accordance with the Environmental Handbook. Seed and protect all bare soil areas. For work that involvesdisturbance of soil with an area of more than 1 acre, file a KPDES,KYR10 permit, BMP Plan, and Notice of Intent filed with the KentuckyDivision of Water.PERFORMANCEVALUES Hours Per Unit Daily Expectation Accomplishment UnitN/AN/AHour10/11 Page 1 of 2
- Page 156 and 157: FOG-809ChapterBRIDGE(H000)SubjectCo
- Page 158 and 159: FOG-810ChapterBRIDGE(H000)SubjectEr
- Page 160 and 161: FOG-812ChapterBRIDGE(H000)SubjectRe
- Page 162 and 163: FOG-813ChapterBRIDGE(H000)SubjectFe
- Page 164 and 165: FOG-815ChapterBRIDGE(H000)SubjectMi
- Page 166 and 167: FOG-901ChapterROADWAY DRAINAGE(J000
- Page 168 and 169: FOG-902ChapterROADWAY DRAINAGE(J000
- Page 170 and 171: FOG-903ChapterROADWAY DRAINAGE(J000
- Page 172 and 173: FOG-904ChapterROADWAY DRAINAGE(J000
- Page 174 and 175: FOG-905ChapterROADWAY DRAINAGE(J000
- Page 176 and 177: FOG-906ChapterROADWAY DRAINAGE(J000
- Page 178 and 179: ROADWAY DRAINAGE (J000)Ditching Usi
- Page 180 and 181: ROADWAY DRAINAGE (J000)Ditching Usi
- Page 182 and 183: ROADWAY DRAINAGE (J000)Paved & Rock
- Page 184 and 185: ROADWAY DRAINAGE (J000)Cleaning Dra
- Page 186 and 187: FOG-912ChapterROADWAY DRAINAGE(J000
- Page 188 and 189: SNOW & ICE (K000)Plowing (K010)RECO
- Page 190 and 191: SNOW & ICE (K000)Spreading Salts &
- Page 192 and 193: SNOW & ICE (K000)Plowing & Spreadin
- Page 194 and 195: SNOW & ICE (K000)Anti-Icing (K040)R
- Page 196 and 197: FOG-1006ChapterSNOW & ICE(K000)Subj
- Page 198 and 199: FOG-1008ChapterSNOW & ICE(K000)Subj
- Page 200 and 201: FOG-1009ChapterSNOW & ICE(K000)Subj
- Page 202 and 203: SNOW & ICE (K000)Stockpiling & Load
- Page 204 and 205: SNOW & ICE (K000)Miscellaneous Snow
- Page 208 and 209: EXTRAORDINARY (M000)Emergency Repai
- Page 210 and 211: EXTRAORDINARY (M000)Emergency Relie
- Page 212 and 213: EXTRAORDINARY (M000)—Emergency Wo
- Page 214 and 215: FOG-1106ChapterEXTRAORDINARY(M000)S
- Page 216 and 217: FOG-1201ChapterSERVICE & OVERHEAD(N
- Page 218 and 219: FOG-1203ChapterSERVICE & OVERHEAD(N
- Page 220 and 221: FOG-1205ChapterSERVICE & OVERHEAD(N
- Page 222 and 223: FOG-1207ChapterSERVICE & OVERHEAD(N
- Page 224 and 225: FOG-1209ChapterSERVICE & OVERHEAD(N
- Page 226 and 227: FOG-1211ChapterSERVICE & OVERHEAD(N
- Page 228 and 229: FOG-1213ChapterSERVICE & OVERHEAD(N
- Page 230 and 231: FOG-1215ChapterSERVICE & OVERHEAD(N
- Page 232 and 233: FOG-1217ChapterSERVICE & OVERHEAD(N
- Page 234 and 235: FOG-1301ChapterINSPECTION(P000)Subj
- Page 236 and 237: INSPECTION (P000)Maintenance Rating
- Page 238 and 239: FOG-1304ChapterINSPECTION(P000)Subj
- Page 240 and 241: SIGNINGS & MARKINGS (T000)Painting
- Page 242 and 243: SIGNINGS & MARKINGS (T000)Painting
- Page 244 and 245: SIGNINGS & MARKINGS (T000)Painting
- Page 246 and 247: SIGNINGS & MARKINGS (T000)Hand-Plac
- Page 248 and 249: SIGNINGS & MARKINGS (T000)Pavement
- Page 250 and 251: FOG-1407ChapterSIGNINGS & MARKINGS(
- Page 252 and 253: FOG-1408ChapterSIGNINGS & MARKINGS(
- Page 254 and 255: FOG-1409ChapterSIGNINGS & MARKINGS(
EXTRAORDINARY (M000)Emergency Repair of Rock Falls & Removal of Debris (M010)FOG-1101RECOMMENDEDPROCEDURE1. Place traffic-control devices as necessary.2. Pick up rock fall, earth, or debris from ditch, shoulder, or roadwaysurface.3. Pick up traffic-control devices.Note: If loading equipment is not required or available, use anonstandard crew. Frequently, a rock pickup patrol, using two men inone truck, performs this operation.Special Note: Determine accomplishment before leaving job site.Properly dispose of all waste.10/11 Page 2 of 2