Field Operations Guide - Kentucky Transportation Cabinet
Field Operations Guide - Kentucky Transportation Cabinet Field Operations Guide - Kentucky Transportation Cabinet
ROADWAY DRAINAGE (J000)Cleaning Drainage Channels (J320)FOG-910FUNCTIONFE01RECOMMENDEDPROCEDURE1. Discuss job requirements with crew.2. Place traffic-control devices as necessary.3. Remove unwanted debris and material from ditch or channel.4. Dispose of unwanted debris and material.5. Remove traffic-control devices.Note: For work on private property, obtain a TC 71-14 form, Consent andRelease signed by the property owner before beginning work.10/11 Page 2 of 2
FOG-911ChapterROADWAY DRAINAGE(J000)SubjectPump Station Repair & Maintenance(J350)DESCRIPTIONSCHEDULING(Section Required)As requiredRECOMMENDEDPERSONNELAs requiredRECOMMENDEDEQUIPMENTAs requiredRECOMMENDEDMATERIALSAs requiredENVIRONMENTALIMPACTSNonePERFORMANCEVALUESFUNCTION Hours Per Unit Daily Expectation Accomplishment UnitFE01N/AN/AHourRECOMMENDEDPROCEDUREAs required10/11 Page 1 of 1
- Page 134 and 135: FOG-703ChapterMOWING(F000)SubjectHa
- Page 136 and 137: FOG-705ChapterMOWING(F000)SubjectTy
- Page 138 and 139: FOG-706ChapterMOWING(F000)SubjectTy
- Page 140 and 141: FOG-707ChapterMOWING(F000)SubjectCo
- Page 142 and 143: FOG-801ChapterBRIDGE(H000)SubjectBr
- Page 144 and 145: BRIDGE (H000)Cleaning Bridge Decks
- Page 146 and 147: BRIDGE (H000)Bridge Joint Sealing (
- Page 148 and 149: FOG-805ChapterBRIDGE(H000)SubjectRe
- Page 150 and 151: FOG-806ChapterBRIDGE(H000)SubjectMa
- Page 152 and 153: FOG-807ChapterBRIDGE(H000)SubjectRe
- Page 154 and 155: FOG-808ChapterBRIDGE(H000)SubjectPa
- Page 156 and 157: FOG-809ChapterBRIDGE(H000)SubjectCo
- Page 158 and 159: FOG-810ChapterBRIDGE(H000)SubjectEr
- Page 160 and 161: FOG-812ChapterBRIDGE(H000)SubjectRe
- Page 162 and 163: FOG-813ChapterBRIDGE(H000)SubjectFe
- Page 164 and 165: FOG-815ChapterBRIDGE(H000)SubjectMi
- Page 166 and 167: FOG-901ChapterROADWAY DRAINAGE(J000
- Page 168 and 169: FOG-902ChapterROADWAY DRAINAGE(J000
- Page 170 and 171: FOG-903ChapterROADWAY DRAINAGE(J000
- Page 172 and 173: FOG-904ChapterROADWAY DRAINAGE(J000
- Page 174 and 175: FOG-905ChapterROADWAY DRAINAGE(J000
- Page 176 and 177: FOG-906ChapterROADWAY DRAINAGE(J000
- Page 178 and 179: ROADWAY DRAINAGE (J000)Ditching Usi
- Page 180 and 181: ROADWAY DRAINAGE (J000)Ditching Usi
- Page 182 and 183: ROADWAY DRAINAGE (J000)Paved & Rock
- Page 186 and 187: FOG-912ChapterROADWAY DRAINAGE(J000
- Page 188 and 189: SNOW & ICE (K000)Plowing (K010)RECO
- Page 190 and 191: SNOW & ICE (K000)Spreading Salts &
- Page 192 and 193: SNOW & ICE (K000)Plowing & Spreadin
- Page 194 and 195: SNOW & ICE (K000)Anti-Icing (K040)R
- Page 196 and 197: FOG-1006ChapterSNOW & ICE(K000)Subj
- Page 198 and 199: FOG-1008ChapterSNOW & ICE(K000)Subj
- Page 200 and 201: FOG-1009ChapterSNOW & ICE(K000)Subj
- Page 202 and 203: SNOW & ICE (K000)Stockpiling & Load
- Page 204 and 205: SNOW & ICE (K000)Miscellaneous Snow
- Page 206 and 207: EXTRAORDINARY (M000)Emergency Repai
- Page 208 and 209: EXTRAORDINARY (M000)Emergency Repai
- Page 210 and 211: EXTRAORDINARY (M000)Emergency Relie
- Page 212 and 213: EXTRAORDINARY (M000)—Emergency Wo
- Page 214 and 215: FOG-1106ChapterEXTRAORDINARY(M000)S
- Page 216 and 217: FOG-1201ChapterSERVICE & OVERHEAD(N
- Page 218 and 219: FOG-1203ChapterSERVICE & OVERHEAD(N
- Page 220 and 221: FOG-1205ChapterSERVICE & OVERHEAD(N
- Page 222 and 223: FOG-1207ChapterSERVICE & OVERHEAD(N
- Page 224 and 225: FOG-1209ChapterSERVICE & OVERHEAD(N
- Page 226 and 227: FOG-1211ChapterSERVICE & OVERHEAD(N
- Page 228 and 229: FOG-1213ChapterSERVICE & OVERHEAD(N
- Page 230 and 231: FOG-1215ChapterSERVICE & OVERHEAD(N
- Page 232 and 233: FOG-1217ChapterSERVICE & OVERHEAD(N
ROADWAY DRAINAGE (J000)Cleaning Drainage Channels (J320)FOG-910FUNCTIONFE01RECOMMENDEDPROCEDURE1. Discuss job requirements with crew.2. Place traffic-control devices as necessary.3. Remove unwanted debris and material from ditch or channel.4. Dispose of unwanted debris and material.5. Remove traffic-control devices.Note: For work on private property, obtain a TC 71-14 form, Consent andRelease signed by the property owner before beginning work.10/11 Page 2 of 2