Field Operations Guide - Kentucky Transportation Cabinet
Field Operations Guide - Kentucky Transportation Cabinet Field Operations Guide - Kentucky Transportation Cabinet
FOG-905ChapterROADWAY DRAINAGE(J000)SubjectSlope Protection, Using Rip Rap, Rock,Concrete, Reclaimed Materials, Gabions,Etc. (J110)DESCRIPTIONPlacing and maintaining ditch checks, slope protection on fill areas, inletand outlet ends of drainage structures, and other areas where scouringaction may occurCharge slope control using vegetative methods to Activity E210. Chargeany maintenance work around a bridge or structure with a "B" or bridgenumber to H320. (Section Required)SCHEDULINGPerform this activity throughout the year as required, with emphasisduring periods of minor maintenance requirements.RECOMMENDEDPERSONNEL Highway Equipment Operator (6)RECOMMENDEDEQUIPMENT Dump truck (2)Pickup or crew-cab truck (1)Note: Add boom equipment if required.RECOMMENDEDMATERIALS Rip rap (50 tons)Ready mix concreteGabionsENVIRONMENTALIMPACTSRefer to the Environmental Handbook (Sections 2.3.8 through 2.3.15) forworking in streams.PERFORMANCEVALUES Hours Per Unit 0.960 Daily Expectation 50 Accomplishment UnitTon10/11 Page 1 of 2
ROADWAY DRAINAGE (J000)—Slope Protection UsingRip Rap, Rock, Concrete, Reclaimed Materials, Gabions, Etc. (J110)FOG-905FUNCTIONFE01RECOMMENDEDPROCEDURE1. Place traffic-control devices as necessary.2. Prepare site for placement of slope protection.3. Place slope protection.4. Remove traffic-control devices.Special Note: Determine accomplishment before leaving job site.10/11 Page 2 of 2
- Page 124 and 125: FOG-611ChapterROADSIDE AGRONOMY(E00
- Page 126 and 127: FOG-612ChapterROADSIDE AGRONOMY(E00
- Page 128 and 129: ROADSIDE AGRONOMY (E000)Mechanical
- Page 130 and 131: FOG-615ChapterROADSIDE AGRONOMY(E00
- Page 132 and 133: MOWING (F000)Slope Mowing (F050)REC
- Page 134 and 135: FOG-703ChapterMOWING(F000)SubjectHa
- Page 136 and 137: FOG-705ChapterMOWING(F000)SubjectTy
- Page 138 and 139: FOG-706ChapterMOWING(F000)SubjectTy
- Page 140 and 141: FOG-707ChapterMOWING(F000)SubjectCo
- Page 142 and 143: FOG-801ChapterBRIDGE(H000)SubjectBr
- Page 144 and 145: BRIDGE (H000)Cleaning Bridge Decks
- Page 146 and 147: BRIDGE (H000)Bridge Joint Sealing (
- Page 148 and 149: FOG-805ChapterBRIDGE(H000)SubjectRe
- Page 150 and 151: FOG-806ChapterBRIDGE(H000)SubjectMa
- Page 152 and 153: FOG-807ChapterBRIDGE(H000)SubjectRe
- Page 154 and 155: FOG-808ChapterBRIDGE(H000)SubjectPa
- Page 156 and 157: FOG-809ChapterBRIDGE(H000)SubjectCo
- Page 158 and 159: FOG-810ChapterBRIDGE(H000)SubjectEr
- Page 160 and 161: FOG-812ChapterBRIDGE(H000)SubjectRe
- Page 162 and 163: FOG-813ChapterBRIDGE(H000)SubjectFe
- Page 164 and 165: FOG-815ChapterBRIDGE(H000)SubjectMi
- Page 166 and 167: FOG-901ChapterROADWAY DRAINAGE(J000
- Page 168 and 169: FOG-902ChapterROADWAY DRAINAGE(J000
- Page 170 and 171: FOG-903ChapterROADWAY DRAINAGE(J000
- Page 172 and 173: FOG-904ChapterROADWAY DRAINAGE(J000
- Page 176 and 177: FOG-906ChapterROADWAY DRAINAGE(J000
- Page 178 and 179: ROADWAY DRAINAGE (J000)Ditching Usi
- Page 180 and 181: ROADWAY DRAINAGE (J000)Ditching Usi
- Page 182 and 183: ROADWAY DRAINAGE (J000)Paved & Rock
- Page 184 and 185: ROADWAY DRAINAGE (J000)Cleaning Dra
- Page 186 and 187: FOG-912ChapterROADWAY DRAINAGE(J000
- Page 188 and 189: SNOW & ICE (K000)Plowing (K010)RECO
- Page 190 and 191: SNOW & ICE (K000)Spreading Salts &
- Page 192 and 193: SNOW & ICE (K000)Plowing & Spreadin
- Page 194 and 195: SNOW & ICE (K000)Anti-Icing (K040)R
- Page 196 and 197: FOG-1006ChapterSNOW & ICE(K000)Subj
- Page 198 and 199: FOG-1008ChapterSNOW & ICE(K000)Subj
- Page 200 and 201: FOG-1009ChapterSNOW & ICE(K000)Subj
- Page 202 and 203: SNOW & ICE (K000)Stockpiling & Load
- Page 204 and 205: SNOW & ICE (K000)Miscellaneous Snow
- Page 206 and 207: EXTRAORDINARY (M000)Emergency Repai
- Page 208 and 209: EXTRAORDINARY (M000)Emergency Repai
- Page 210 and 211: EXTRAORDINARY (M000)Emergency Relie
- Page 212 and 213: EXTRAORDINARY (M000)—Emergency Wo
- Page 214 and 215: FOG-1106ChapterEXTRAORDINARY(M000)S
- Page 216 and 217: FOG-1201ChapterSERVICE & OVERHEAD(N
- Page 218 and 219: FOG-1203ChapterSERVICE & OVERHEAD(N
- Page 220 and 221: FOG-1205ChapterSERVICE & OVERHEAD(N
- Page 222 and 223: FOG-1207ChapterSERVICE & OVERHEAD(N
FOG-905ChapterROADWAY DRAINAGE(J000)SubjectSlope Protection, Using Rip Rap, Rock,Concrete, Reclaimed Materials, Gabions,Etc. (J110)DESCRIPTIONPlacing and maintaining ditch checks, slope protection on fill areas, inletand outlet ends of drainage structures, and other areas where scouringaction may occurCharge slope control using vegetative methods to Activity E210. Chargeany maintenance work around a bridge or structure with a "B" or bridgenumber to H320. (Section Required)SCHEDULINGPerform this activity throughout the year as required, with emphasisduring periods of minor maintenance requirements.RECOMMENDEDPERSONNEL Highway Equipment Operator (6)RECOMMENDEDEQUIPMENT Dump truck (2)Pickup or crew-cab truck (1)Note: Add boom equipment if required.RECOMMENDEDMATERIALS Rip rap (50 tons)Ready mix concreteGabionsENVIRONMENTALIMPACTSRefer to the Environmental Handbook (Sections 2.3.8 through 2.3.15) forworking in streams.PERFORMANCEVALUES Hours Per Unit 0.960 Daily Expectation 50 Accomplishment UnitTon10/11 Page 1 of 2