12.07.2015 Views

Field Operations Guide - Kentucky Transportation Cabinet

Field Operations Guide - Kentucky Transportation Cabinet

Field Operations Guide - Kentucky Transportation Cabinet

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

FOG-904ChapterROADWAY DRAINAGE(J000)SubjectConstructing & Repairing Private Entrances(J070)DESCRIPTIONConstructing private entrances under the authority of a permit and repairof existing private entrancesIf entrance pipe is 36 inches or greater, check with a maintenanceengineer before repairing. Charge in-place cleaning to J010 or J020.(Section Required)SCHEDULINGAs requiredRECOMMENDEDPERSONNEL Highway Equipment Operator (5)Traffic Control (1)RECOMMENDEDEQUIPMENT Dump truck (2)Backhoe or grade (1)Hand toolsRECOMMENDEDMATERIALS Aggregate (6 tons)ENVIRONMENTALIMPACTSRefer to the Environmental Handbook for working in streams.PERFORMANCEVALUESFUNCTION Hours Per Unit 24.000 Daily Expectation 2 Accomplishment UnitEachFE0110/11 Page 1 of 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!