FOG-903ChapterROADWAY DRAINAGE(J000)SubjectRepairing Cross Drains(J030)DESCRIPTIONRepairing pipes and culverts, including full or partial replacement ofstructuresCharge in-place cleaning to J010 or J020. Charge any maintenancestructure that does not have a bridge number to this activity, JO30.(Section Required)SCHEDULINGPerform this activity throughout the year as required, with emphasisduring periods of minor maintenance requirements. Do not chargeentrance pipe construction or maintenance to this activity.RECOMMENDEDPERSONNEL Highway Superintendent (1)Highway Equipment Operator (3)Traffic Control (2)RECOMMENDEDEQUIPMENT Dump trucks (single-axle) (2)Pickup truck (1)Compressor (1)Gradall, drott, bantam, crane,front-end loader, or backhoe (1)Myers sewer (optional)Note: Activity may require pavement breaker, spade, jackhammer, airwrench, or other accessories.RECOMMENDEDMATERIALSReady-mix concreteReinforced concrete pipeBCCM or aluminum pipeRip rapOther materials as needed10/11 Page 1 of 2

ROADWAY DRAINAGE (J000)Repairing Cross Drains (J030)FOG-903ENVIRONMENTALIMPACTSRefer to the Environmental Handbook (Section 2.3.7, “Sediment Removalfrom Structures”) for working in streams.PERFORMANCEVALUESFUNCTION Hours Per Unit 24.000 Daily Expectation 2 Accomplishment UnitEachFE01RECOMMENDEDPROCEDURE1. Discuss with crew the requirements of the job.2. Place traffic-control devices.3. Remove damaged portion of structure or pipe.4. Repair or replace damaged portion of structure or pipe.5. Remove undesirable debris from job site.6. Remove traffic-control devices.Special Note: Determine accomplishment before leaving job site.10/11 Page 2 of 2

ROADWAY DRAINAGE (J000)Repairing Cross Drains (J030)FOG-903ENVIRONMENTALIMPACTSRefer to the Environmental Handbook (Section 2.3.7, “Sediment Removalfrom Structures”) for working in streams.PERFORMANCEVALUESFUNCTION Hours Per Unit 24.000 Daily Expectation 2 Accomplishment UnitEachFE01RECOMMENDEDPROCEDURE1. Discuss with crew the requirements of the job.2. Place traffic-control devices.3. Remove damaged portion of structure or pipe.4. Repair or replace damaged portion of structure or pipe.5. Remove undesirable debris from job site.6. Remove traffic-control devices.Special Note: Determine accomplishment before leaving job site.10/11 Page 2 of 2