FOG-812ChapterBRIDGE(H000)SubjectRepairing Steel Bridge Members(H710)DESCRIPTIONSCHEDULINGRepairing and painting steel bridge members, including rockers, bearingdevices, and expansion dams (Section Required)Schedule painting as weather conditions permit.RECOMMENDEDPERSONNELVaries by jobRECOMMENDEDEQUIPMENTVaries by jobNote: Scaffolding may be required for areas not accessible from theground or substructure.RECOMMENDEDMATERIALSAs requiredENVIRONMENTALIMPACTSNonePERFORMANCEVALUESFUNCTION Hours Per Unit Daily Expectation Accomplishment UnitFE01: DistrictFE02: Central OfficeFD04: Six-Year PlanCB01: Rural Secondary "Emergency"CB06: Rural Secondary "Regular"N/AN/AHour10/11 Page 1 of 2
BRIDGE (H000)Repairing Steel Bridge Members (H710)FOG-812RECOMMENDEDPROCEDURE1. Place traffic-control devices as necessary.2. Rig bridge for painting as required.3. Clean bridge to bare metal.4. Prime bridge.5. Place finish coat of paint.6. Remove rigging as required.7. Remove traffic-control devices.Note: Recommended procedure varies in accordance with jobrequirements. When rockers and bearing devices of more than onestructure in an immediate area require cleaning and painting, arrange anassembly-line operation.10/11 Page 2 of 2
- Page 110 and 111: FOG-604ChapterROADSIDE AGRONOMY(E00
- Page 112 and 113: FOG-605ChapterROADSIDE AGRONOMY(E00
- Page 114 and 115: FOG-606ChapterROADSIDE AGRONOMY(E00
- Page 116 and 117: FOG-607ChapterROADSIDE AGRONOMY(E00
- Page 118 and 119: FOG-608ChapterROADSIDE AGRONOMY(E00
- Page 120 and 121: FOG-609ChapterROADSIDE AGRONOMY(E00
- Page 122 and 123: FOG-610ChapterROADSIDE AGRONOMY(E00
- Page 124 and 125: FOG-611ChapterROADSIDE AGRONOMY(E00
- Page 126 and 127: FOG-612ChapterROADSIDE AGRONOMY(E00
- Page 128 and 129: ROADSIDE AGRONOMY (E000)Mechanical
- Page 130 and 131: FOG-615ChapterROADSIDE AGRONOMY(E00
- Page 132 and 133: MOWING (F000)Slope Mowing (F050)REC
- Page 134 and 135: FOG-703ChapterMOWING(F000)SubjectHa
- Page 136 and 137: FOG-705ChapterMOWING(F000)SubjectTy
- Page 138 and 139: FOG-706ChapterMOWING(F000)SubjectTy
- Page 140 and 141: FOG-707ChapterMOWING(F000)SubjectCo
- Page 142 and 143: FOG-801ChapterBRIDGE(H000)SubjectBr
- Page 144 and 145: BRIDGE (H000)Cleaning Bridge Decks
- Page 146 and 147: BRIDGE (H000)Bridge Joint Sealing (
- Page 148 and 149: FOG-805ChapterBRIDGE(H000)SubjectRe
- Page 150 and 151: FOG-806ChapterBRIDGE(H000)SubjectMa
- Page 152 and 153: FOG-807ChapterBRIDGE(H000)SubjectRe
- Page 154 and 155: FOG-808ChapterBRIDGE(H000)SubjectPa
- Page 156 and 157: FOG-809ChapterBRIDGE(H000)SubjectCo
- Page 158 and 159: FOG-810ChapterBRIDGE(H000)SubjectEr
- Page 162 and 163: FOG-813ChapterBRIDGE(H000)SubjectFe
- Page 164 and 165: FOG-815ChapterBRIDGE(H000)SubjectMi
- Page 166 and 167: FOG-901ChapterROADWAY DRAINAGE(J000
- Page 168 and 169: FOG-902ChapterROADWAY DRAINAGE(J000
- Page 170 and 171: FOG-903ChapterROADWAY DRAINAGE(J000
- Page 172 and 173: FOG-904ChapterROADWAY DRAINAGE(J000
- Page 174 and 175: FOG-905ChapterROADWAY DRAINAGE(J000
- Page 176 and 177: FOG-906ChapterROADWAY DRAINAGE(J000
- Page 178 and 179: ROADWAY DRAINAGE (J000)Ditching Usi
- Page 180 and 181: ROADWAY DRAINAGE (J000)Ditching Usi
- Page 182 and 183: ROADWAY DRAINAGE (J000)Paved & Rock
- Page 184 and 185: ROADWAY DRAINAGE (J000)Cleaning Dra
- Page 186 and 187: FOG-912ChapterROADWAY DRAINAGE(J000
- Page 188 and 189: SNOW & ICE (K000)Plowing (K010)RECO
- Page 190 and 191: SNOW & ICE (K000)Spreading Salts &
- Page 192 and 193: SNOW & ICE (K000)Plowing & Spreadin
- Page 194 and 195: SNOW & ICE (K000)Anti-Icing (K040)R
- Page 196 and 197: FOG-1006ChapterSNOW & ICE(K000)Subj
- Page 198 and 199: FOG-1008ChapterSNOW & ICE(K000)Subj
- Page 200 and 201: FOG-1009ChapterSNOW & ICE(K000)Subj
- Page 202 and 203: SNOW & ICE (K000)Stockpiling & Load
- Page 204 and 205: SNOW & ICE (K000)Miscellaneous Snow
- Page 206 and 207: EXTRAORDINARY (M000)Emergency Repai
- Page 208 and 209: EXTRAORDINARY (M000)Emergency Repai
BRIDGE (H000)Repairing Steel Bridge Members (H710)FOG-812RECOMMENDEDPROCEDURE1. Place traffic-control devices as necessary.2. Rig bridge for painting as required.3. Clean bridge to bare metal.4. Prime bridge.5. Place finish coat of paint.6. Remove rigging as required.7. Remove traffic-control devices.Note: Recommended procedure varies in accordance with jobrequirements. When rockers and bearing devices of more than onestructure in an immediate area require cleaning and painting, arrange anassembly-line operation.10/11 Page 2 of 2