12.07.2015 Views

Field Operations Guide - Kentucky Transportation Cabinet

Field Operations Guide - Kentucky Transportation Cabinet

Field Operations Guide - Kentucky Transportation Cabinet

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

INTRODUCTIONReportingFOG-104ACCOUNT STRIPOPTIONAL FIELDS(CONT.) Task Order—Used in place of Job in eMARS Template ID—Sometimes used when work is performed on a projectthat has had a Template ID set up (users right-click in the field to clickon “Use Template ID” function in OMS, which in turn populates theaccount strip fields with the appropriate information associated withthat project)ACTIVITIES FORCONSTRUCTIONForce account projects are charged to activities listed below:4000 Construction Engineering4010 Roadside Parks and Picnic Grounds—State Forces4020 Shoulders—State Forces4030 Erosion Control—State Forces4040 Surface- State Forces4050 Guardrail and Safety Devices—State Forces4060 Weight Stations and Loadometers—State Forces4070 Construction General—State Forces4090 Bridge Construction—State Forces4100 Traffic Enforcement4300 Construction—Part in Right-of-Way Phase4310 Construction—Part in Design Phase4320 Construction—Part in Utility Phase4500 Construction Engineering—Consult4580 Construction Contracts—Consult4610 City Contracts—(Pay Local Government)4630 Contract Suit Claims7000 Traffic Signs and Devices—State Forces7010 Construction General—State Forces7020 Pavement Markings by Contractor7030 Signing Plans7040 Signal Plans7050 Lighting Plans7060 Contract Supervision—Traffic Personnel7070 Pavement Markings—State ForcesACCOMPLISHMENTREPORTINGAccomplishments are reported in the Daily Log of OMS and in the payrollsystem (KHRIS). For details, see FOG-202.10/11 Page 3 of 3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!