Field Operations Guide - Kentucky Transportation Cabinet
Field Operations Guide - Kentucky Transportation Cabinet Field Operations Guide - Kentucky Transportation Cabinet
FOG-806ChapterBRIDGE(H000)SubjectMaintenance of Bridge Drainage Channels(H320)DESCRIPTIONRemoving or clearing debris, such as logs, brush, silt, and trash, from thedrainage channel under a bridge; controlling erosion around thesubstructure of a bridgeCheck with a bridge engineer or maintenance engineer for conformanceto environmental requirements. (Section Required)SCHEDULINGAs requiredRECOMMENDEDPERSONNELAs requiredRECOMMENDEDEQUIPMENTAs requiredRECOMMENDEDMATERIALSGabionsRip rapENVIRONMENTALIMPACTS Refer to the Environmental Handbook (Sections 2.3.5, 2.3.6, and 2.3.7)for working in and around streams.PERFORMANCEVALUESFUNCTION Hours Per Unit Daily Expectation Accomplishment UnitFE01: DistrictFE02: Central OfficeFD04: Six-Year PlanCB01: Rural Secondary "Emergency"CB06: Rural Secondary "Regular"N/AN/AHour10/11 Page 1 of 2
BRIDGE (H000)Maintenance of Bridge Drainage Channels (H320)FOG-806RECOMMENDEDPROCEDURE1. Discuss with crew the requirements of the job.2. Place traffic-control devices as necessary.3. Remove and dispose of unwanted debris and material from ditch orchannel.4. Remove traffic-control devices.Note: To perform work on private property, obtain the property owner’ssignature on a TC 71-14 form, Consent and Release before beginning thework.10/11 Page 2 of 2
- Page 100 and 101: ROADSIDE GENERAL (C000)Repair or In
- Page 102 and 103: FOG-516ChapterROADSIDE GENERAL(C000
- Page 104 and 105: FOG-518ChapterROADSIDE GENERAL(C000
- Page 106 and 107: ROADSIDE AGRONOMY (E000)Brush & Tre
- Page 108 and 109: ROADSIDE AGRONOMY (E000)Mechanical
- Page 110 and 111: FOG-604ChapterROADSIDE AGRONOMY(E00
- Page 112 and 113: FOG-605ChapterROADSIDE AGRONOMY(E00
- Page 114 and 115: FOG-606ChapterROADSIDE AGRONOMY(E00
- Page 116 and 117: FOG-607ChapterROADSIDE AGRONOMY(E00
- Page 118 and 119: FOG-608ChapterROADSIDE AGRONOMY(E00
- Page 120 and 121: FOG-609ChapterROADSIDE AGRONOMY(E00
- Page 122 and 123: FOG-610ChapterROADSIDE AGRONOMY(E00
- Page 124 and 125: FOG-611ChapterROADSIDE AGRONOMY(E00
- Page 126 and 127: FOG-612ChapterROADSIDE AGRONOMY(E00
- Page 128 and 129: ROADSIDE AGRONOMY (E000)Mechanical
- Page 130 and 131: FOG-615ChapterROADSIDE AGRONOMY(E00
- Page 132 and 133: MOWING (F000)Slope Mowing (F050)REC
- Page 134 and 135: FOG-703ChapterMOWING(F000)SubjectHa
- Page 136 and 137: FOG-705ChapterMOWING(F000)SubjectTy
- Page 138 and 139: FOG-706ChapterMOWING(F000)SubjectTy
- Page 140 and 141: FOG-707ChapterMOWING(F000)SubjectCo
- Page 142 and 143: FOG-801ChapterBRIDGE(H000)SubjectBr
- Page 144 and 145: BRIDGE (H000)Cleaning Bridge Decks
- Page 146 and 147: BRIDGE (H000)Bridge Joint Sealing (
- Page 148 and 149: FOG-805ChapterBRIDGE(H000)SubjectRe
- Page 152 and 153: FOG-807ChapterBRIDGE(H000)SubjectRe
- Page 154 and 155: FOG-808ChapterBRIDGE(H000)SubjectPa
- Page 156 and 157: FOG-809ChapterBRIDGE(H000)SubjectCo
- Page 158 and 159: FOG-810ChapterBRIDGE(H000)SubjectEr
- Page 160 and 161: FOG-812ChapterBRIDGE(H000)SubjectRe
- Page 162 and 163: FOG-813ChapterBRIDGE(H000)SubjectFe
- Page 164 and 165: FOG-815ChapterBRIDGE(H000)SubjectMi
- Page 166 and 167: FOG-901ChapterROADWAY DRAINAGE(J000
- Page 168 and 169: FOG-902ChapterROADWAY DRAINAGE(J000
- Page 170 and 171: FOG-903ChapterROADWAY DRAINAGE(J000
- Page 172 and 173: FOG-904ChapterROADWAY DRAINAGE(J000
- Page 174 and 175: FOG-905ChapterROADWAY DRAINAGE(J000
- Page 176 and 177: FOG-906ChapterROADWAY DRAINAGE(J000
- Page 178 and 179: ROADWAY DRAINAGE (J000)Ditching Usi
- Page 180 and 181: ROADWAY DRAINAGE (J000)Ditching Usi
- Page 182 and 183: ROADWAY DRAINAGE (J000)Paved & Rock
- Page 184 and 185: ROADWAY DRAINAGE (J000)Cleaning Dra
- Page 186 and 187: FOG-912ChapterROADWAY DRAINAGE(J000
- Page 188 and 189: SNOW & ICE (K000)Plowing (K010)RECO
- Page 190 and 191: SNOW & ICE (K000)Spreading Salts &
- Page 192 and 193: SNOW & ICE (K000)Plowing & Spreadin
- Page 194 and 195: SNOW & ICE (K000)Anti-Icing (K040)R
- Page 196 and 197: FOG-1006ChapterSNOW & ICE(K000)Subj
- Page 198 and 199: FOG-1008ChapterSNOW & ICE(K000)Subj
FOG-806ChapterBRIDGE(H000)SubjectMaintenance of Bridge Drainage Channels(H320)DESCRIPTIONRemoving or clearing debris, such as logs, brush, silt, and trash, from thedrainage channel under a bridge; controlling erosion around thesubstructure of a bridgeCheck with a bridge engineer or maintenance engineer for conformanceto environmental requirements. (Section Required)SCHEDULINGAs requiredRECOMMENDEDPERSONNELAs requiredRECOMMENDEDEQUIPMENTAs requiredRECOMMENDEDMATERIALSGabionsRip rapENVIRONMENTALIMPACTS Refer to the Environmental Handbook (Sections 2.3.5, 2.3.6, and 2.3.7)for working in and around streams.PERFORMANCEVALUESFUNCTION Hours Per Unit Daily Expectation Accomplishment UnitFE01: DistrictFE02: Central OfficeFD04: Six-Year PlanCB01: Rural Secondary "Emergency"CB06: Rural Secondary "Regular"N/AN/AHour10/11 Page 1 of 2