Field Operations Guide - Kentucky Transportation Cabinet
Field Operations Guide - Kentucky Transportation Cabinet Field Operations Guide - Kentucky Transportation Cabinet
FOG-703ChapterMOWING(F000)SubjectHand Trimming & Lawn-Type Mowing(F090)DESCRIPTIONSCHEDULINGRECOMMENDEDPERSONNELRECOMMENDEDEQUIPMENTRECOMMENDEDMATERIALSENVIRONMENTALIMPACTSHand trimming and small power-mower cutting and trimming areasinaccessible to or unsafe for tractor mowers (Section Required)Schedule area for cutting and trimming with machine mowing in order topresent a completely mowed appearance.As requiredAs requiredN/ARefer to the Environmental Handbook.PERFORMANCEVALUESFUNCTION Hours Per Unit Daily Expectation Accomplishment UnitFE01N/AN/AHourRECOMMENDEDPROCEDURE1. Prepare equipment at yard or job site.2. Place traffic-control devices as necessary.3. Mow and trim area.4. Clean up, load, and dispose of excess cuttings and trimmings.5. Remove traffic-control devices.10/11 Page 1 of 1
FOG-704ChapterMOWING(F000)SubjectContract Mowing on RoadwayEmbankment Dams(F150)DESCRIPTIONSCHEDULINGMowing roadway embankment dams, as well as picking up litter, undercontract (Section Required)As requiredRECOMMENDEDPERSONNELAs requiredRECOMMENDEDEQUIPMENTAs requiredRECOMMENDEDMATERIALSN/AENVIRONMENTALIMPACTSAs requiredPERFORMANCEVALUESFUNCTION Hours Per Unit Daily Expectation Accomplishment UnitFE01N/AN/AHoursRECOMMENDEDPROCEDUREAs required10/11 Page 1 of 1
- Page 84 and 85: FOG-505ChapterROADSIDE GENERAL(C000
- Page 86 and 87: ROADSIDE GENERAL (C000)Litter Clean
- Page 88 and 89: ROADSIDE GENERAL (C000)Litter Clean
- Page 90 and 91: ROADSIDE GENERAL (C000)Dead Animal
- Page 92 and 93: FOG-510ChapterROADSIDE GENERAL(C000
- Page 94 and 95: ROADSIDE GENERAL (C000)Energy-Absor
- Page 96 and 97: ROADSIDE GENERAL (C000)Fence Repair
- Page 98 and 99: ROADSIDE GENERAL (C000)Repair or In
- Page 100 and 101: ROADSIDE GENERAL (C000)Repair or In
- Page 102 and 103: FOG-516ChapterROADSIDE GENERAL(C000
- Page 104 and 105: FOG-518ChapterROADSIDE GENERAL(C000
- Page 106 and 107: ROADSIDE AGRONOMY (E000)Brush & Tre
- Page 108 and 109: ROADSIDE AGRONOMY (E000)Mechanical
- Page 110 and 111: FOG-604ChapterROADSIDE AGRONOMY(E00
- Page 112 and 113: FOG-605ChapterROADSIDE AGRONOMY(E00
- Page 114 and 115: FOG-606ChapterROADSIDE AGRONOMY(E00
- Page 116 and 117: FOG-607ChapterROADSIDE AGRONOMY(E00
- Page 118 and 119: FOG-608ChapterROADSIDE AGRONOMY(E00
- Page 120 and 121: FOG-609ChapterROADSIDE AGRONOMY(E00
- Page 122 and 123: FOG-610ChapterROADSIDE AGRONOMY(E00
- Page 124 and 125: FOG-611ChapterROADSIDE AGRONOMY(E00
- Page 126 and 127: FOG-612ChapterROADSIDE AGRONOMY(E00
- Page 128 and 129: ROADSIDE AGRONOMY (E000)Mechanical
- Page 130 and 131: FOG-615ChapterROADSIDE AGRONOMY(E00
- Page 132 and 133: MOWING (F000)Slope Mowing (F050)REC
- Page 136 and 137: FOG-705ChapterMOWING(F000)SubjectTy
- Page 138 and 139: FOG-706ChapterMOWING(F000)SubjectTy
- Page 140 and 141: FOG-707ChapterMOWING(F000)SubjectCo
- Page 142 and 143: FOG-801ChapterBRIDGE(H000)SubjectBr
- Page 144 and 145: BRIDGE (H000)Cleaning Bridge Decks
- Page 146 and 147: BRIDGE (H000)Bridge Joint Sealing (
- Page 148 and 149: FOG-805ChapterBRIDGE(H000)SubjectRe
- Page 150 and 151: FOG-806ChapterBRIDGE(H000)SubjectMa
- Page 152 and 153: FOG-807ChapterBRIDGE(H000)SubjectRe
- Page 154 and 155: FOG-808ChapterBRIDGE(H000)SubjectPa
- Page 156 and 157: FOG-809ChapterBRIDGE(H000)SubjectCo
- Page 158 and 159: FOG-810ChapterBRIDGE(H000)SubjectEr
- Page 160 and 161: FOG-812ChapterBRIDGE(H000)SubjectRe
- Page 162 and 163: FOG-813ChapterBRIDGE(H000)SubjectFe
- Page 164 and 165: FOG-815ChapterBRIDGE(H000)SubjectMi
- Page 166 and 167: FOG-901ChapterROADWAY DRAINAGE(J000
- Page 168 and 169: FOG-902ChapterROADWAY DRAINAGE(J000
- Page 170 and 171: FOG-903ChapterROADWAY DRAINAGE(J000
- Page 172 and 173: FOG-904ChapterROADWAY DRAINAGE(J000
- Page 174 and 175: FOG-905ChapterROADWAY DRAINAGE(J000
- Page 176 and 177: FOG-906ChapterROADWAY DRAINAGE(J000
- Page 178 and 179: ROADWAY DRAINAGE (J000)Ditching Usi
- Page 180 and 181: ROADWAY DRAINAGE (J000)Ditching Usi
- Page 182 and 183: ROADWAY DRAINAGE (J000)Paved & Rock
FOG-703ChapterMOWING(F000)SubjectHand Trimming & Lawn-Type Mowing(F090)DESCRIPTIONSCHEDULINGRECOMMENDEDPERSONNELRECOMMENDEDEQUIPMENTRECOMMENDEDMATERIALSENVIRONMENTALIMPACTSHand trimming and small power-mower cutting and trimming areasinaccessible to or unsafe for tractor mowers (Section Required)Schedule area for cutting and trimming with machine mowing in order topresent a completely mowed appearance.As requiredAs requiredN/ARefer to the Environmental Handbook.PERFORMANCEVALUESFUNCTION Hours Per Unit Daily Expectation Accomplishment UnitFE01N/AN/AHourRECOMMENDEDPROCEDURE1. Prepare equipment at yard or job site.2. Place traffic-control devices as necessary.3. Mow and trim area.4. Clean up, load, and dispose of excess cuttings and trimmings.5. Remove traffic-control devices.10/11 Page 1 of 1