ROADSIDE GENERAL (C000)Repair or Installation of Guardrail End Treatment (C330)FOG-514FUNCTIONFE01RECOMMENDEDPROCEDURE1. Discuss with crew the requirements of the job.2. Place traffic-control devices as necessary. Use amber lights whenavailable.3. Station flagger as required.4. Remove parts damaged beyond repair.5. Realign loose parts and recompact earth.6. Be sure to align, using engineering methods if required.7. Install new posts, guardrail, and hardware.8. Clean up debris. Salvage reusable items.9. Remove traffic-control devices.Note: Prior to mobilizing crew, determine the amount and type of endtreatments required. Schedule installation of concrete if needed.Special Note: Determine accomplishment before leaving job site.10/11 Page 2 of 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!