TIN SHUI WAI / YUEN LONGDEVELOPMENT PROGRAMME1993 EDITIONNorth West New Territories Development OfficeTERRITORY DEVELOPMENT DEPARTMENTHONG KONG


UNIVERSITY OF HONG KONGLIBRARYHong Kong Collectiongift fromHong Kong. Territory Development Department.


PREFACEThis <strong>development</strong> <strong>programme</strong> provides a framework for<strong>development</strong> within Tin Shui Wai and Yuen Long Districts. Part ofits function is to complement that portion of the Territory publichousing <strong>development</strong> <strong>programme</strong> for the Districts by ensuring thatessential infrastructure and local facilities are provided in phasewith increasing population. Development Programmes are for planningpurposes only and whilst programming information reflects thebudgetary position at the time of preparation, achievement of<strong>development</strong> targets is dependent on the actual provision ofresources each year. The programming of most recreational, culturaland amenity projects is subject to selection by the RegionalCouncil. Information contained herein is derived from the December1992 Regional Council Capital Works Programme 1992/93 - 1996/97.The Planning Department has contributed Parts 4 and 5 ofthis Development Programme based on the land formation and servicingschedule in Part 6. Their assistance is gratefully acknowledged.March 1993


4*^ IS rf=i -/"V ^B fslTO ttl to 77 3> IM!DEVELOPMENT OFFICEBOUNDARYUrban Area Development Office5 ft ft S elTsuen Wan Development OfficeDistrict Board Boundary(Outside Urban Area)NENTNVVNTifi PI ffi JK SiTuen Mun Development Officelit i? m ± ft m ANorth East New TerritoriesDevelopment OfficeM i? as 4k *B s ssNorth West New TerritoriesDevelopment OfficeRural TownshipCountry ParkSENTSr W S i^ ffi M SSouth East New TerritoriesDevelopment OfficeTAI POName of New TownSWNTSouth West New TerritoriesDevelopment OfficePlan No TDD-1C m m m ttDate 1/90 aTerritory DevelopmentDepartment


NORTH WEST NEW TERRITORIES DEVELOPMENTOFFICETIN SHUI WAI/YUEN LONG DEVELOPMENT PROGRAMME1993 EDITIONCONTENTSPAGECOLOURPART 1EXPLANATORY NOTES1.01WHITEPART 2FORECAST OF EXPENDITURE - SUMMARY2.01YELLOWPART 3EXPENDITURE BLOCK DIAGRAMS3.01YELLOWPART 4ESTIMATES OF POPULATION AND LIVING QUARTERS4.01BLUEPART 5SERVICED LAND AVAILABILITY5.01YELLOW5A(1) - SERVICED LAND AVAILABILITY - SUMMARY (GROSS)5.06YELLOW5A(2) - SERVICED LAND AVAILABILITY - SUMMARY (NET)5.10YELLOWPART 6BAR CHARTS6.01BLUEKEY TO PART 66.80WHITEAPPENDICESI INDEX OF PROJECTS ARRANGED BY YEAR OF COMMENCEMENT I.01 YELLOWII INDEX OF PROJECTS ARRANGED BY WORK TYPE 11.01 WHITEIII LOCATION PLANS III.01 WHITE


NORTH WEST NEW TERRITORIES DEVELOPMENT OFFICETIN SHUI WAI/YUEN LONG DEVELOPMENT PROGRAMME1993 EDITIONFART 1 - EXPLANATORY NOTESCONTENTSPAGE1. INTRODUCTION 1.022. BACKGROUND 1.043. PREVIOUS PROGRAMMES 1.054. 1993 PROGRAMME 1.055. OVERALL DEVELOPMENT PROGRESS 1.066. DESCRIPTION OF PACKAGES 1.087. YUEN LONG NEW TOWN DEVELOPMENT 1.088. TIN SHUI WAI DEVELOPMENT 1,159. NORTH WESTERN NEW TERRITORIES DEVELOPMENT 1.201.01


NORTH VEST NEW TERRITORIES DEVELOPMENT OFFICETIN SHUI WAI/YUEN LONG DEVELOPMENT PROGRAMME1993 EDITIONPART 1 - EXPLANATORY NOTES1. INTRODUCTION1.1 The process of <strong>development</strong> commences with planning and engineeringstudies from which <strong>development</strong> plans and <strong>programme</strong>s are prepared. Theimplementation of the plans starts with the acquisition and clearance of landfollowed by site formation and the provision of essential engineering services.Land then becomes available for the building of public and private housing,factories, commercial undertakings and community facilities. Insofar as this<strong>programme</strong> relates to the <strong>development</strong> of new towns and rural townships, the aimis to provide, as far as is practicable, a balanced <strong>development</strong> of public andprivate housing, job opportunities and community facilities both at the end ofeach stage of <strong>development</strong> and on completion of the total <strong>programme</strong>.1.2 This document sets out the <strong>programme</strong> of work now planned for the nextten years to achieve this objective and forecasts the financial resourcesrequired over the next 5 years. It includes all items of work currentlyanticipated as being necessary to complete the <strong>development</strong> as now planned,1.3 The Yuen Long District in the north-western part of the New Territoriescovers an area of approximately 14,430 hectares and had a population of 225,278persons as recorded in the Hong Kong 1991 Census- Development plans are providedfor urban <strong>development</strong> at Yuen Long New Town as well as at Tin Shui Wai, where anew town is being constructed on a reclaimed site. The 488 hectare site at TinShui Wai was purchased by Government from Mightycity Company Ltd* in July 1982*1.4 Upon full <strong>development</strong>, Yuen Long New Town is expected to cover an areaof approximately 520 hectares and will have a design population about 220,000,This compares with the present estimated population of 119,000* Since thecommencement of works for the new town in 1977, approximately 360 hectares ofland have been formed and serviced to provide sites for residential andcommercial <strong>development</strong>, open space, schools and other community facilities aswell as roads and footpaths*1.02


1.5 The Tin Shui Wai <strong>development</strong> includes an initial <strong>development</strong> area inthe south for a population of 149,000 persons split roughly between private andpublic housing; the remaining area of about 240 hectares in the north will beretained by the Government as a land bank. All the layout plans in the initial<strong>development</strong> area have been approved and implementation works are in hand.Private housing in Town Lots 1 and 2 have already been completed and buildingworks in Town Lots 3, 5, 6 and 7 are under construction- Public housing in TinYiu Estate has also been completed with first population intake in April 1992.Two phases of public housing in Tin Shui Estate have just been completed and theremaining two phases will be completed within this year. All infrastructurecontracts required for the initial <strong>development</strong> have been either completed orawarded. The cost of site formation and infrastructure is about $4,490 millionand for community facilities about $1,500 million, of which about $582 millionwould be funded by the Regional Council.1.6 Following completion of the further studies detailing the Base Strategyof the North Western New Territories Development Investigation, additional<strong>development</strong> has been proposed in the Yuen Long-Tuen Hun Corridor and at selectedlocations elsewhere in the rural hinterland. These proposals were endorsed inprinciple by L.D.P.C. in February 1984 for the purpose of further planning workaimed at implementation. Detailed plans have been prepared and approved byD.P.C., for Hung Shui Kiu, Ping Shan and Kam Tin and the necessary items toimplement the plans are included in the N.W.N.T. section of this <strong>programme</strong>.1.7 The total expenditure on engineering works and community facilitieswhich has already been incurred since construction began in July 1977 to March1992 amounts to some $ 6,870 million in the Yuen Long District. The total costof <strong>development</strong> in the Yuen Long District excluding public housing built by theHousing Department and land acquisition is currently estimated at $31,950million.1.8 Government is directly involved in the <strong>development</strong> through numerouscomponent items in the Public Works Programme for buildings, engineering (civil,environmental and highways) and waterworks. Public housing estates are fundedand constructed by the Housing Authority with the exception of a limited numberto be built by the Housing Society. Building items in the Public Works Programmeand Regional Council's <strong>development</strong> <strong>programme</strong> provide the various communityfacilities in accordance with the Hong Kong Planning Standards and Guidelines*1.9 This <strong>programme</strong> has been derived by grouping works into a series of"packages" which, as far as is practicable, include all those works required toproduce, on completion of the package, a balanced <strong>development</strong> of housing,industry and community facilities. In certain instances, it has not beenpossible to achieve this concept in a particular package but it remains a primaryobjective to provide a balance, in relation to population build-up, on an overalltown basis by ensuring that, the various types of facilities are developedconcurrently.1*10 The programming of all works and the progression of projects throughthe Public Works Programme procedures are co-ordinated by the Development Officeto ensure that, whenever possible and having regard to various constraints, thegoal of balanced <strong>development</strong> is achieved.1.03


1.11 The plans showing the general pattern of <strong>development</strong> planning andpackage areas are included at the back of the <strong>programme</strong>.1.12 An index of projects is also included together with an index to showprojects arranged by the years in which they are <strong>programme</strong>d to commence,2. BACKGROUND2.1 In 1972, the Executive Council gave its approval to the adoption of theTen-Year Housing Target Programme, which included proposals for the expansion ofmarket towns and rural townships. As a part of Government's strategy to promote<strong>development</strong> outside the exis<strong>tin</strong>g urban areas of Hong Kong and Kowloon as well asthe new towns of Tsuen Wan, Tuen Mun and Sha Tin, the market towns of Tai Po,Fanling and Sheung Shui were combined in April 1978 to form a separate new townunder the control of a new Development Office, with Yuen Long and the ruraltownships including Tai 0, Mui Wo, Cheung Chau, Peng Chau, Sham Tseng, Sha TauKok, Sai Kung Town and Tui Min Hoi Area remaining the responsibility of the NewTerritories Development Branch. In September 1978, New Territories DevelopmentProgress Committee approved a change in designation from Yuen Long Market Townto Yuen Long New Town. In June 1980 responsibility for Sham Tseng <strong>development</strong>was transferred to Tsuen Wan Development Office. In April 1981 Sai Kung wastransferred to Junk Bay Development Office, and similarly in August 1981 Sha TauKok <strong>development</strong> to Tai Po and Fanling Development Office. In July 1981, planningresponsibility for the areas outside Yuen Long New Town and the rural townshipsforming the balance of the Yuen Long District, was handed over to the Branch.2.2 In April 1986, upon the formation of the Territory DevelopmentDepartment, which combined the former NTDD with the Urban Area DevelopmentOrganisation, the New Territories Development Branch ceased to exist. Theresponsibilities for Yuen Long, Tin Shui Wai and North West New Territories<strong>development</strong>s were taken over by the NT/North West Development Office (Yuen Long)and those for the Islands district by NT/South Development Office. In July 1988,the NT/North West Development Office (Yuen Long) was upgraded to an independent<strong>development</strong> office under a Project Manager and designated as the Tin ShuiWai/Yuen Long Development Office. In February 1990, the Tin Shui Wai/Yuen LongDevelopment Office was renamed to North West New Territories Development Office.2.3 As from 1st April 1988 detailed layout plans and engineering works ofSan King Tsuen, Chung Uk Tsuen, Sun Fung Wai and Lam Tei i.e. the areas of theTuen Mun - Yuen Long Corridor within the Tuen Mun administration district havebeen handed over to the Tuen Mun Development Office.2.4 Although historically Yuen Long town and the rural townships haveplayed a significant role in the life of the New Territories and have acted asnatural focal points for <strong>development</strong> of the area, their rate of growth in recentyears has been overshadowed by the rapid build up in population of the new townsof Tsuen Wan, Sha Tin and Tuen Mun. With the drawing up of further <strong>development</strong>plans including the North Western New Territories Development Strategy, the scopeand pace of <strong>development</strong> in Yuen Long New Town and its surroundings will greatlyincrease.1,04


2.5 In order to provide Government with the information necessary to makedecisions on how best to proceed with <strong>development</strong> within the North Western NewTerritories subregion and how the subregion might best contribute to the overallgrowth potential of the territory, the New Territories Development Departmentappointed New Territories Development Consultants in September 1980 to undertakea multi-disciplinary study of the subregion. The report on that investigationwas produced in August 1981 and recommended a Preferred Strategy with two maincomponents :-(i)(ii)a base strategy which provided the necessary infrastructure for theexis<strong>tin</strong>g and likely natural growth population in the subregionindependent of any strategic decision rela<strong>tin</strong>g to major growth anda strategyfor malor growth which proposed the <strong>development</strong> of a majorfocus of urban <strong>development</strong> in the subregion.Subsequent consideration of the report by L.D.P.C endorsed the principlescontained in the Base Strategy and further studies were then approved to detailthe components of that strategy. These further studies were completed inNovember 1983 and endorsed in principle by L.D.P.C. in February 1984.3. PREVIOUS PROGRAMMES3.1 The first <strong>development</strong> <strong>programme</strong> for the new towns and rural townshipswas prepared in August 1974. These were based, firstly, on the total fundsanticipated as being available in the four years 1974/75 to 1977/78 for allNTDD's <strong>programme</strong>s plus urban housing and, secondly, on the Housing Authority's10-year housing <strong>programme</strong>.3.2 Further editions of the <strong>programme</strong>s were published annually, eachcovering a 10-year period and each up-dated to take account of progress alreadymade and the anticipated availability of Government resources. Since the 1989edition, this <strong>programme</strong> has been produced to a slightly different timetable toprevious editions to reflect the position at the previous year's Annual Reviewby the Public Works Sub-Committee as well as the Regional Council's Capital WorksProgramme. No 1990 edition has been produced*4. 1993 PROGRAMME4.1 The format of this <strong>programme</strong> remains generally the same as that for the1992 edition. It has been up-dated in the light of :-(i) progress on works in hand and on works by others affec<strong>tin</strong>g the<strong>development</strong> area;(ii)(iii)(iv)(v)progress on resolving land acquisition and clearance <strong>programme</strong>s;progress on engineering and landscape studies;private <strong>development</strong> activities; andchanges in expenditure priorities and the predicted availability offinancial resources in the 5-year period (1992/93 - 1996/97) under theResource Allocation System.1.05


4.2 The Regional Council (RC) became fully autonomous with effect from 1April 1988. They have established their own 5-year Capital Works Programme andprovide funds for their projects. These RC projects are shown in the 1993Development Programmes to give a full picture of <strong>development</strong>s, but are no<strong>tin</strong>dicated as being funded under Head 707 (New Towns and Public Housing other thanHousing Authority), except those which Government has already accepted commitmentto provide funds. Although TDD no <strong>long</strong>er has executive duties in proposing thetiming of the RC projects, there remains close liaison between RC and TDD.4.3 This <strong>programme</strong> takes account of the present Public Works Programmeprocedures which categorise projects based on their status within the ResourceAllocation System (RAS) as follows;Category C : Projects which are accepted in principle to enable clientdepartments to plan their requirements.Category B : Projects which are earmarked resources in the late RAS exercise, orwhich have been chosen for a start in a previous Public WorksSub-Committee (PWSC) Annual Review but are not yet in Category A.Category A : Projects which are ready in all respects for tenders to be invitedand for construction works to proceed (save for projects directlyinjected in Category A), and which have approved project estimates.Category D : Projects estimated to cost up to the prevailing financial ceilingfor Category D projects (which is currently set at $10 million) onwhich work may proceed and expenditure may be incurred, subject tothe availability of funds in the block votes provided for thepurpose.4.4 Information provided in this <strong>programme</strong> is related to one of thefollowing base dates :-(i) The forecast of works expenditure is based on March 1992 prices,unless more recent tender rates are known.(ii) The forecasts of population growth and land production relate to 31March of each year.(iii)Public Works Programme details with regard to item number, categoryand title have been updated to accord with the latest information asfar as possible.5- OVERALL DEVELOPMENT PROGRESS5*1 Yuen LongThe overall progress of works in 1992 was good. The pedestrian/cyclebridge from Long Ping Estate to Yeung Uk was completed in February 1992*Environmental improvement works for the Yuen Long nullahs were completed inJanuary 1993. Improvements to the water quality in the upper nullahs have beenconsequently noted and the offensive smell experienced in the past abated. Thedetailed designs of Kau Hui and footbridge systems at Yuen Long LRT terminus andOn Ning Road are in progress and their construction works are scheduled to star<strong>tin</strong> early 1994.1.06


The provision of community facilities for Yuen Long are sufficient forits present population, however, sites are reserved for the future needs.5.2 Tin Shui WaiThe first phase of the flood protection works which comprised the floodwater pumping stations to the low lying villages of Sheung Cheung Wai and Ha MeiSan Tsuen was substantially complete in early 1992. Detailed planning and designfor the remaining flood protection works for these two villages are in progress.Three contracts for engineering infrastructure have been substantiallycompleted in 1992, and three other contracts are in progress. Roads serving thefirst two public housing estates (Tin Yiu and Tin Shui Estates) and the firstfour private <strong>development</strong> lots have been opened. LRT service commenced in January1993. The improvement to Hung Tin Road and its extension to join the Yuen Long -Tuen Mun Eastern Corridor commenced in October 1992 and is scheduled to becompleted by July 1995.People moved into the first phase of Tin Yiu Estate in April 1992whilst occupation of the rest of the estate and Tin Shui Estate will occur fromearly 1993 onwards. As regards the private housing lots, the first occupationof which started in June 1992 and the second and third <strong>development</strong> lots willfollow in 1993.A sub-divisional fire station and ambulance depot, a divisional policestation, an urban clinic, a RSD vehicle depot, five primary schools, fivesecondary schools, an area centre and a social centre have already beencompleted. There are two social centres, two primary schools, one secondaryschool, one pre-vocational school and a mildly handicapped children school undervarious construction stages.Regional Council projects in Tin Shui Wai consist of a sports ground,an indoor recreation centre and a swimming pool complex and their constructionworks have commenced on site for completion in late 1993. The first stage of thedistrict park is nearing completion under an entrustment agreement. Open spaceshave been completed in Areas 3A and 9, providing the first active arid passiverecreational facilities for residents of Tin Shui Wai.Work will soon commence on the construction of an open space in Area34. In early 1994, work is scheduled to start on the construction of activerecreation facilities in the district park.Landscape works to roadside and riverside amenity areas con<strong>tin</strong>ue toprogress for the 'greening 1 of the town.5.3 North West New TerritoriesConstruction work for stage I of the <strong>development</strong> for acommercial/residential area at Hung Shui Kiu, south of Castle Peak Road, in theTuen Mun - Yuen Long Corridor has been completed. Stage II of this <strong>development</strong> fnorth of Castle Peak Road, is <strong>programme</strong>d to commence in early 1995. Constructionwork for Ping Shan <strong>development</strong>, Stage I to provide community facilities and avillage expansion area commenced in January 1992. Works are progressingsatisfactorily and are expected to be completed in late 1993.1.07


The North West New Territories sewerage scheme win serve an ultimatepopulation of 600,000 people in Tin Shui Wai, Tuen Mun - Yuen Long Corridor andnew <strong>development</strong> areas in Yuen Long New Town. The sewerage scheme comprisestrunk sewers in Tin Shui Wai, a sewage pumping station at Ha Tsuen with risingmains, a sewage treatment plant at San Wai, an effluent tunnel under Castle Peakand an effluent outfall offshore at Lung Kwu Sheung Tan. These works have beensubstantially completed and the whole scheme was commissioned in February 1993.The main storm water drainage channels for Tin Shui Wai hinterland werecompleted in June 1992. The design of main storm water drainage channels forYuen Long and Kam Tin Stage I, Phases 1 and 2 has been completed. Works forPhase 1 is scheduled to start within 1993. Detailed design for drainage channelsat Ngau Tarn Mei and San Tin has also started. Construction works are expectedto commence in late 1994 and 1995 respectively. The North West New TerritoriesVillage Flood Protection Study has been completed and an implementation <strong>programme</strong>is being formulated.6. DESCRIPTION OF PACKAGES6.1 Brief notes on individual packages, outlining progress to date andintended future action, are given below.6.2 Package 1In the 1974 Programme, Package 1 relates to work on which there was acontractual commitment as at 1*8.74. For the sake of consistency, the samepackage numbering has been retained.6.3 Package 2Package 2 in each <strong>development</strong> area relates to engineering studies. Theprevious studies listed in respect of Lau Fau Shan and Tan K<strong>wai</strong> Tsuen have beensuperseded by proposed <strong>development</strong> contained in the NWNT Base Strategy Studies.6.4 The following brief notes describe the implementation of <strong>development</strong>proposals in :-(i)(ii)(ill)Yuen Long New Town,Tin Shui Wai Development, andNorth Western New Territories Development.7. YUEN LONG NEW TOWN DEVELOPMENT7.1 Package 3Estimated Cost$307.0 MPlanning Areas HPart), 2(Part), 3(Part), 6 (Part)11 (Part).Engineering Works1.08Site formation works for Shui Pin WaiEstate and other community facilitiessites have been completed*


Public HousingCommunity FacilitiesPrivate DevelopmentServiced Land Availability7.2 Package 4Estimated CostPlanning AreasEngineering WorksPublic HousingCommunity FacilitiesServiced Land AvailabilityApproximately 4.0 ha of land wasformed under this package for Shui PinWai Estate* The estate was completedin March 1981.Community Facilities include a primaryschool, cooked food stalls, refusecollection points, public toilets andopen space for active and passiverecreational facilities.Approximately 4.0 ha of land has beenformed and serviced for private C/R<strong>development</strong>. Most of the sites havebeen developed or sold or will bedeveloped shortly.In addition to the land provided forpublic housing and private <strong>development</strong>approximately 7.5 ha has been providedfor G/IC uses including a swimmingpool complex, a primary school site, asecondary school site, a bus terminus,local open space and a site for anindoor recreation centre.$155.2 M4(Part), 5(Part), 9{Part), 10(Part).Site formation works including there<strong>development</strong> of sections of theoriginal Yuen Long Town have beencompleted.NilCommunities Facilities include the HopYick market, cooked food centres, YuenLong Town Square and open space forpassive and active recreationfacilities. The Hop Yick Market,Government Office Building and YuenLong Town Square have been completed.Of the 6 ha of land provided forprivate <strong>development</strong> almost all has nowbeen developed for private residentialuse*In addition to the land provided forprivate <strong>development</strong> small areas ofindustrial and G/IC uses have beenformed and serviced, together withalmost 1.5 ha of open space. Roadsand pedestrianways account for theremaining 5 to 6 ha of land providedin this package.1.09


7.3 Package 5Estimated CostPlanning AreasEngineering WorksPublic HousingCommunity FacilitiesPrivate DevelopmentServiced Land Availability$208.5 Ml(Part), 4(Part), 9(Part), 10(Part),ll(Part)Works are substantially completed toform and service an area of some 17,5ha primarily for private residential<strong>development</strong>. Engineering works werecompleted in two phases from December1981 to 1983 and October 1983 to1984/85.NilCommunity Facilities include oneprimary school, a clinic and openspace for active and passiverecreational facilities.This package provides the extension ofthe town a<strong>long</strong> its south westernborder together with land for theexpansion of Tai Kiu Village, Mostprivate lots have been sold.The major land provision has beenalmost 4.5 ha for private residential<strong>development</strong>, and approximately 5*0 hafor G/IC uses. Almost 8 ha of landhas been utilised for roads andpedestrianways.7.4 Package 6Estimated CostPlanning AreasEngineering WorksPublic HousingCommunity Facilities$734.2 M3(Part), 6(Part).Works have been carried out in twophases to form and service sites forG/IC uses in Phase I which wascompleted in 1983/84 and privateresidential <strong>development</strong> and the YuenLong Town Park in Phase II whichcommenced in 83/84 and was completedin 86/87,Nil.Community Facilities include a civiccentre, an indoor recreation centre, a1.10


primary school/ 2 secondary schools, atown park and local open space.Construction of the primary school,the second secondary school and thetownpark has been completed.Private DevelopmentServiced Land AvailabilityAlmost 8 ha of land for privateresidential <strong>development</strong> is to beprovided in this package which coversmost of the south western corner ofthe town. Most of the land would bereserved for low to medium densityresidential <strong>development</strong>. To date fewsites have been completed and sold-Approximately 7.5 ha is provided inthis package for the Yuen Long TownPark. Construction work for the parkcommenced in late 1988 and wascompleted in January 1991. The parkprovides extensive areas of woodlandand pathways for passive recreationtogether with one 5-a-side and one7-a-side football pitches, one gateball court, an ornamental lake andother water features. A pagoda formsa landmark at the summit of the hilland offers panoramic views of YuenLong Town and the surrounding areas.7.5 Package 7 - Tung Tau Industrial AreaEstimated CostPlanning AreasEngineering WorksPublic HousingCommunity FacilitiesPrivate Development$76.7 MCompleted works for this packageinvolved the formation and servicingof an area of former fish ponds for asmall industrial estate. Twovehicular bridges for access over thenullah were constructed together witha pedestrian/cycle bridge.NilCommunity facilities include cookedfood centres, public toilets, refusecollection points and local open spacefor industrial workers.Some of the lots for industrial useare sold and the rest are <strong>programme</strong>dfor sale in the next few years. Thevacant lots are currently beingutilised for a range of short termuses.1.11


Serviced Land AvailabilityAlmost 7.5 ha of land is provided inthis package for industrial and godovnuses.7*6 Package 8 - Long Finer EstateEstimated CostPlanning AreasEngineering WorksPublic HousingCommunity FacilitiesPrivate DevelopmentServiced Land Availability$809.3 MThis entire package comprisedformation and servicing of landnecessary for the Lonq Piiuf PublicHousing Estate. Land war* formed fromformer fish ponds together with newaccess roads. Works are completed.Long Ping Estate has been completed inMay 1989,The estate included J primary and 2secondary schools, and local openspace. The estate is now linked tocentral Yuen Long town by an elevatedpedestrian/cycle bridge.A small area of land is provided forthe further expansion ol Young tlkTsuen Village.Of the total area ol approximately17.5 ha, some U ha is usect for theLong Ping Est ate with t tie roma i ridercomprising G/1C facilities, VTD androads and pedestrian ways.7-7 Package 9 - Yuen Long East Extension AreaEstimated CostPlanning AreasEngineering Works$505.2 M12, 15 andImprovement,Yuen Long NullahThe Yuen Long east extension areaincludes the CDA sites to the east ofYuen Long LET Terminus and thenortheast of the 'Yuen Long Mullah.The ^engineering works under thispackage will comprise formation andservicing of land necessary for theCDA sites and other proposed G/ICsites, and necessary roads anddrainage works. The package alsoincludes the construction of a1.12


footbridge crossing Castle Peak Roadconnec<strong>tin</strong>g to Yuen Long LRT Terminus.In addition, this package has beenextended to cover the construction ofa pedestrian/cycle bridge from LongPing to Yeung Uk and the environmentalimprovement to Yuen Long Nullahs whichare substantially completed.Public HousingCommunity FacilitiesPrivate DevelopmentServiced Land AvailabilityNilMajor G/IC facilities will include acombined produce wholesale market, anindoor recreation centre, a primaryschool, a district games complex andopen space projects.Development of the CDA sites dependson the initiatives of the privatesector.The land provided for thecomprehensive <strong>development</strong> area isabout 8 ha.7.8 Package 10 - Yuen Long Kau Hui DevelopmentEstimated Cost :Planning AreasEngineering WorksPublic HousingCommunity FacilitiesPrivate DevelopmentServiced Land Availability$112.6 M16These works make provision for theservicing and improvement of theexis<strong>tin</strong>g villages to the north of LRTTerminus site, known collectively asKau Hui. The works compriseprincipally infrastructure provisionand drainage works.NilCommunity Facilities include a primaryschool, a secondary school and localopen spaces.Land is provided for the <strong>development</strong>of village expansion areas to meet therequirements arising from the SmallHouse Policy and for genelal ligh<strong>tin</strong>dustries and godowns.The land provided for the village type<strong>development</strong> is approximately 8.18 ha.1.13


7.9 PC iqe 11 - Yuen Long Town South EasterajtotensionEstimated Cost :Planning AreasEngineering WorksPublic HousingCommunity FacilitiesPrivate DevelopmentServiced Land Availability$453.5 M14These works provide for theconsolidation and future extension ofthe new town up to the alignment ofthe Southern Bypass. Developmentproposals are still at a draft; stagebut works will include new andimproved roads, sewerage and drainageworks for exis<strong>tin</strong>g and new <strong>development</strong>areas*NilCommunity Facilities include a primaryschool, a secondary school, aneighbourhood communi t:y centre, ashelter workshop, local and districtopen spaces.Development of the private landdepends on initiatives of the privatesector.The land provided for residential(Group B) <strong>development</strong> is 21.3 ha.7.10 Package 12 - Yuen Long Town South Western ExtensionEstimated CostPlanning AreasEngineering WorksPublic HousingCommunity Facilities1.14$390,4 M13These works provide for theconsolidation and future extension ofthe new town up to the alignment ofthe Southern Bypass* Developmentproposals are still at a draft stagebut works will include new andimproved road, sewerage and drainageworks for exis<strong>tin</strong>g arid new <strong>development</strong>areas.The <strong>development</strong> of a public housingestate and a home ownership schemehave been proposed in Planning Area13.Community Facilities include a primaryschool, a secondary school, aneighbourhood community centre, anindoor recreation centre and localopen spaces.


Private DevelopmentServiced Land AvailabilityA home ownership scheme is proposed inPlanning Area 13 a<strong>long</strong>side with thepublic housing estate* Remainder ofthe extension area as proposed for lowto medium density <strong>development</strong> andvillage <strong>development</strong>.The site designated for public housingand the home ownership scheme is about12.35 ha, while the site for privateresidential (Group B) <strong>development</strong> isabout 6*8 ha.8* TIN SHUI WAI DEVELOPMENT8.1 Package 1 - Master Development PlanIn December 1982 Consultants were commissioned to prepare a MasterDevelopment Plan (MDP) for the <strong>development</strong> zone and edge areas- TheMDP was approved by the Development Progress Committee in September1983 and formed the basis of further detailed planning and design. AnOutline Development Plan (ODP) was prepared on this basis. The ODP rhaving been updated to incorporate the subsequent changes in planningproposals, was approved by the Development Progress Committee on 9March 1989 and adopted by the Secretary for Lands and Works on 24 July1989.8.2 Package 2 - Design and InvestigationEstimated Cost :$130.8 MLand formation design was completed and Contract No. NTDB 33/85commenced in November 1987. Design of Phases I, II and III floodprotection works for the peripheral areas was also completed. ThePreliminary Report for the Engineering Infrastructure underconsultancy agreement CE5/86 was submitted in May 1988. The detaileddesign for the first four infrastructure contracts for packages 4 & 5and the further contracts for package 6 works have been completed. Areport on the review of town centre and transport terminus layout toimprove access and services was completed in 1992.8.3 Package 3 - Preliminary Engineering Works, Land Formation& Main Drainage , tEstimated CostPlanning Areas$1,788.9 MNot applicableEngineering Works Part I of this package provides forthe construction of certainpreliminary engineering works prior tocommencement of the main siteformation works. These engineeringworks comprise the construction of the1.15


Tai River Diversion Culvert and HungTin road (South Western Access Road)and the formation of a works area forthe main land formation contract.These works are complete. Theremaining portion consis<strong>tin</strong>g of thedualling of the South West Access Roadto complete the Tin Shui Wai WestAccess to Castle Peak Road togetherwith a grade separated junction atHung Shui Kin commenced in October1.992 and is scheduled to ho completedin July 1995. Interim improvements toJunction Mn39 havo completed. Part IIof this package provides for the landformation, using marine t i l l , andmain drainage within the Tf>Wlantlholding. Also i ncl udoci arevillage flood protection works at IiOUk Tsuon and Kiu Tan Wai (Phase 1);Sheung Cheung Wai and Ha Moi I»an Tsuon(Phases III £ IV) toqothor withimprovement works to the Hunq .Shui KiuRiver (Phase II). Works for Phases I,II and III are complete.Public HousingCommunity FacilitiesPrivate DevelopmentNilNil,4 Package 4Estimated Cost:Planning AreasEngineering Works$4,137.5 M1-3, 3A, 3B, 4-5, 8-11, 13, 1,4(Fart),21, 26, 34, 35.This package includes the* necessaryinfrastructure to serve the two publichousing estates in Areas f> and 16 andthe first two private housing estatesin Tin Shui Wai. The roads to beconstructed include Road 1)1, LI, L2,L3, L9 and 15, 3 structures areprovided facilita<strong>tin</strong>g access to thetown from the surrounding areas andgrade-separated pedestrian movementwithin the town. These works alsoprovide for infrastructure to theprivate <strong>development</strong> &ites in Areas 8 &11 (TSWTL 1 & 2), G/IC sites in Areas3B, 4, 26 and part of 14 and1.16


ultimately to Areas 1, 3 and 13.Formation of the Light Rail Transitsystem reserve is also included andcompleted. Two infrastructure contractscommenced in 1989 and are nowsubstantially completed.Public HousingCommunity FacilitiesPrivate Development8.5 Package 5Estimated CostPlanning AreasOne public housing estate. Tin YiuEstate for approximately 37000 peopleincluding a Home Ownership Scheme forapproximately 5200 people is includedin this package- Construction isnearing completion and people startedmoving in from April 1992 onwards.Tin Yiu Estate will include threeprimary and two secondary schools,together with an area community centreand a mini-soccer pitch. Area 13 isalso planned to be developed as apublic housing estate to accommodate apopulation of about 14,000 persons.The estate is scheduled to becompleted in 1997/98.Community Facilities included in thispackage, including those in the TinYiu Estate, consist of a subdivisionalfire station and ambulancedepot, a divisional police station,four primary and four secondaryschools, a prevocational school, aspecial school, an area centre, achildren and youth centre and an urbanclinic. An indoor recreation centreand several open spaces are alsoincluded. In planning Area 3A,construction work has been completedon an open space providing active andpassive recreational facilities. Anopen space in Area 9 has beenconstructed by the private developerunder an entrustment agreement.Rl type <strong>development</strong> for about 3,500flats in Area 8 (TSWTL 1) was thefirst private housing estate to beoccupied in Tin Shui Wai star<strong>tin</strong>g inmid 1992. Area 11 (TSWTL 2) will alsobe Rl <strong>development</strong> for about 1,800flats completed in early 1993,$3,469.7 M12, 14 (Part), 15, 16, 17, 19,22(Part), 23, 24, 30, 32, 33.1.17


Engineering WorksPublic HousingCommunity FacilitiesThis package includes thr necessaryinfrastructure to serve the secondpublic housing estate in Area 16, thetown centre (part) in Area 21 (TSWTL4)and private housing estates in Area 19(TSWTL 3) and Area 24 (TSWTI, 7).Roads to be constructed include RoadPI, D2(part) L4, L6, I//, Ii8, roads inAreas 14 and 1 ?> and inf rast rueture inprivate housinq and commercial i tesin Areas 19, 23 and 24. Thestructures in thir> package includebridges over the main drainagechannels and r>ubwayr. under the LRTreserve and road rarriacfeway. Theformation of the LRT reserve andterminus together with theconstruction of a transport terminusis included in thh; package. Twoinfrastructure con! rarts commenced inJuly 1990, with the third contractcommenced in September I9 ( )2.The second estate, Tin Shuj Instate,will house approxiniat e.I y 29000 personsin rental aceommodat ion andapproximately 1400 in Home OwnershipScheme accommodation. The estate willbe completed in tour phar»or*. Intakeof population will beqin in early1993. The HOS component wi.ll runparallel with Phase IV <strong>development</strong>.The estate includes two primaryschools, two secondary schools, aneighbourhood community centre and anindoor recreation centre,Community facilities included in thispackage are four primary and foursecondary schools, a children andyouth centre and a neighbourhoodcommunity centre. A sports ground,two indoor recreation centres and aleisure pool complex are alsoincluded* There are a] so Governmentdepots and open spaces. Two primaryand two secondary schools have beencompleted and are in operation. Thefirst phase of the District Park hasbeen entrusted to a private developerand will comprise 6*6 ha of passiverecreational area in a landscapeset<strong>tin</strong>g. Work started on site in late1991 with a view to completion in mid1993,1.18


Private DevelopmentPrivate Rl housing is contained in twoplanning areas : Area 19 (TSWTL 3) isexpected to contain approximately 1550living quarters with piling workcommencing in 1991 and flats availablefrom 1993/94 onwards and, PlanningArea 24 (TSWTL 7) which would provideabout 4100 living quarters with flatsbecoming available from 1993/94onwards. Piling work was completedand building work commenced inNovember 1992. Planning Area 23(TSWTL 4(S)) provides for C/R<strong>development</strong>. The design is beingreviewed by the private developer.,6 Package 6Estimated CostPlanning AreasEngineering WorksCommunity FacilitiesPrivate Development$1,093.1 M20, 22(Part), 25, 25A, 25B, 27, 28, 29and 33A.This package completes the works inthe Initial Development Zone andprovides infrastructure to serve thelast two private housing sites inAreas 27 £ 28 (TSWTL 5 and 6) , theremaining C/R <strong>development</strong> in Area 20(TSWTL 4 part) and district square inArea 29- The roads constructed underthis package are Road P2, D2(Part)L4(Part) and L10, Construction ofthis infrastructure commenced in late1991. Infrastructure within theprivate housing sites is alsoincluded.The community facilities include oneprimary and two secondary school, acultural centre, area communitycentre, district park and square andopen spaces.Private housing is contained in twoplanning areas. Areas 27 (TSWTL 5)and 28 (TSWTL 6) being Rl type<strong>development</strong> are expected to contain3000 and 2300 living quartersrespectively. Work for the formercommenced in 1992 and flats beingavailable from 1994/95 onwards,whereas work for the latter willcommence in 1993 for completion in1.19


1995/96, Planninq Area 20 (TKWT1,4(N))will be C/R typ f * <strong>development</strong>. Thedesiqn is boinq reviewed by theprivate developer.9 . NORTH WESTERN NEW TERRITORIlS^Jjj^9.1 IntroductionThese items provide for the progressive implementation of a series ofinfrastructural improvements designed to accommodate the expectedpopulation growth in the North Western New Terr i tor i


9,3 Package 2 - Major HighwaysThe major highways projects are as follows:-(a)(b)(c)(d)(e)(f)A new trunk road from Tuen Mun to Yuen Long with an interchange tolink with new access roads to Tin Shui Wai.A Southern Bypass to Yuen Long New Town to link the above item tothe New Territories Circular Road at Au Tau.A bypass for trunk traffic to the north of Kam Tin.Eastern and Western access roads to Tin Shui Wai.Substantial improvements to exis<strong>tin</strong>g roads.Road link between the North West New Territories and West Kowloon(Route 3) - country park section.9-4 Package 3 - Civil Engineering - MiscellaneousThese items provide for :~(i)(ii)The necessary waterworks at Tan K<strong>wai</strong> Tsuen.A stormwater drainage system, including main drainage channels,for the Tin Shui Wai hinterland, Yuen Long and Kam Tin.9,5 Package 4 - Rural DevelopmentThese items provide for :-(i)The further <strong>development</strong> of rural centres at Kam Tin, Lau Fau Shanand a local centre at San Tin.(ii) Phased upgrading schemes for exis<strong>tin</strong>g villages in the ruralhinterland* Improvements will be made to access, sewagetreatment, waste disposal, water supply and will allow for theplanned expansion of villages to accommodate future plannedexpansion village housing requirements.(iii) The necessary additional community facilities for the ruralhinterland*9*6 Package 5-Rural Planning Improvement Strategy (RPIS)The RPIS is a comprehensive rural <strong>development</strong> strategy with one aimamongst others to cover and string together various rural improvementworks including the exis<strong>tin</strong>g Urban Fringe Improvement Programme and theRPIS Implementation Programme. Improvement works such as villageimprovement and <strong>development</strong> scheme, provision of sewers and sewagetreatment plants and reconstruction of village access roads are itemized1.21


and included in each year's RPIS Implementation Programme. The firstimplementation <strong>programme</strong> was introduced in 1990. The 92/93Implementation Programme comprising nine new projects was endorsed by the<strong>yuen</strong> Long District Board on 27 August 1992 and there are currently threeimplementation <strong>programme</strong>s in hand covering a total of twenty-threeprojects. Up to now, three projects have been completed and threeprojects were under construction. There are another five projects in thefinal stage of tender document preparation while the other projects areeither under the land resumption process or actively under planning.9-7 Package 6 - Sewerage SchemesA sewerage scheme to service <strong>development</strong> in the Yuen Long - Tuen MunCorridor, Tin Shui Wai, additional growth around Yuen Long New Town andlimited areas of the rural hinterland. These schemes include trunkmains, pumping stations, a major sewage treatment plant, an effluenttunnel and an outfall.9.8 Package 7 - Flood Mitigation SchemesThese items provide flood protection measures for Tin Shui WaiHinterland, Yuen Long, Kam Tin and Ngau Tarn Mei.9.9 Progress of N.W.N.T. Projects9-9.1 Tin Shui Wai East Access & LongPingEstateLinkEstimated Cost :$119 MThe Tin Shui Wai East Access is one of the main road connections to TinShui Wai new town and the major route for utility services supply tothe town. Works are substantially completed in 1992.9.9.2 Tin Shui Wai West AccessEstimated Cost :$220 MThe Tin Shui Wai West Access is one of the major roads connec<strong>tin</strong>g TinShui Wai to Yuen Long-Tuen Mun Eastern Corridor road* Constructionwork commenced in October 1992 and is scheduled to be completed in July1995.9.9.3 Tuen Mun - Yuen Long Corridor Engineering Works ForCommercial/Residential Area At Hung Shui Kiu» : , Estimated Cost : $142 MStage I of the site formation for the commercial/residential<strong>development</strong> which lies to the south of Castle Peak Road has beencompleted while Stage II, north of Castle Peak Road is BOW beingdesigned and will be implemented during the period 1995 to 1997.1*22


9.9.4 Ping Shan DevelopmentEstimated Cost :$198 MStage I, comprising engineering works for Tong Fong Tsuen villageextension pilot scheme and an all weather sports pitch, commenced irJanuary 1992 and will be completed in late 1993. Planning work of theremaining stage is in hand.9.9.5 Main Drainage channels for Tin Shui Wai HinterlandEstimated Cost :$135 MMain drainage channels in Fui Sha Wai, Tai To Tsuen, Hung Shui Kiu, TinSam, Sik Kong Wai and Tseung Kong Wai were completed in phases fromMarch 92 to August 92.9.9.6 Main Drainage Channels for Yuen Long and Kam TinEstimated Cost :$1,625 MDesign works for Stage 1, Phases 1 and 2 were completed.works for Phase I is scheduled to commence within 1993.whole project are expected to be completed in 1998/99.ConstructionWorks for the9.9.7 Village FloodProtection WorksEstimated Cost :$442 MThe NWNT village flood protection study was completed in early 1990.About 200 villages have been examined and out of these about 40 areexpected to require some form of flood protection and drainageimprovement works either taken individually or in groups. Constructionof flood protection works for Sha Po, Pok Wai and Mei Po are expectedto commence in early 1995.9.9.8 Trunk Sewers, Sewage Pumping Stations and Rising MainsEstimated Cost :$389 MThese form part of the sewage collection, treatment and disposal schemein NWNT to serve some 600,000 people/ ultimately, in Yuen Long NewTown, Tin Shui Wai New Town and the Tuen Mun - Yuen Long Corridor.Construction of trunk sewers by DSD, in stages, has already commenced.A pumping station at Ha Tsuen, and rising mains to a sewage treatmentplant at San Wai, were completed in February 1993, catering for therequirements of Tin Shui Wai New Town and the Tuen Mun - Yuen LongCorridor in early 1993.1.23-


9.9.9 Sewage Treatment Plant, Eifl.uent...TM^el_andJ^^luent OutfallEstimated Cost :$916 MConstruction of the effluent tunnel under the Castle Peak firing range,sewage treatment plant at San Wai and the effluent outfall offshore atLung Kwu Sheung Tan were completed in February 1993,1.24


NORTH WEST NEW TERRITORIES DEVELOPMENT OFFICETIN SHUI WAI/YUEN LONG DEVELOPMENT PROGRAMME1993 EDITION 7PART 2 - FORECAST OF EXPENDITURE - SUMMARYCONTENTSPAGE1. YUEN LONG NEW TOWN 2. 22. TIN SHUI WAI DEVELOPMENT 2. 33. NORTH WESTERN NEW TERRITORIES 2. 44. COMPOSITE 2. 52. 1


WORK TYPECURRENT ____ ^.._..,........,-^.-:- - EXPENDITURE ($M)ESTIMATED EKP.UP TO LATER &COST ($M) 31/3/1992 1992/1993 1993/1994 1994/1995 1995/1996 1996/1997WORKS ON HEAD 707Village HousingCivil Engineering1513. IB579 .3645 .7222.8880.47108.24142.59533.92Civil Engineering Sub-totalHighwaysWaterworks1513. 18220. 67579 .36164 .8245 ,722 .5122.882.3280.4720.18108.2416.60142.5914.24533.92Total Engineering WorksCommunity FacilitiesWorks on Head 7071733. 85805. 832539. 68744 .18458 ,671202 .8548 .235 .7754 .0025.200.8726.07100.659.22109.87124.8419,30144.14156.83156,83533.92312.00845.92WORKS ON OTHERS (with funds not controlled by TDD)Civil Engineering Sub-total - - , „ . - «- - -Highways _ _ ~ _ - - - -Waterworks _ „ - _ - - - -Total Engineering WorksCommunity FacilitiesRC ProjectsPublic HousingWorks on others300.50294.79619.481214.7737.5026*13619.48683.1140.001.13 0.70 4.621.13 0.70 44.62100.0033.98133.98110.0067.64177.6413.00160.59Development Programme Total 3754.45 1885 .96 55.13 26.77 154.49 278.12 334.47 1019.51173.59Yuen LongForecast of Expenditure - SummaryPart 2Pag© 2.2


WORK TYPECURRENT ._____^^^EXPENDITURE ($N)ESTIMATED EXP.UP TO &COST ($M) 31/3/1992 1992/1993 1993/1994 1994/1995 1995/1996 1996/1997 CONTINGENCIESWORKS ON HEAD 707Village HousingCivil Engineering3377 .312040 .71345.49277.45191.31316.73196 .728.90Civil EngineeringHighwaysWaterworksSub-total3377 ,31868 .4565 .702040 .7118 .5523 .77345.4921 .675.00277 .459.652.60191.3156.153.48316.73113 .1716.22196 .72221 .2614 .638.90428.00Total Engineering WorksCommunity Facilities4311 .46903 .402083 .03300 ,38372.16120.02289.7092.29250.94146.82446.1242.80432 .6126 .10436.90174.99Works on Head 7075214.862383 .41492.18381 .99397.76488.92458 .71611 .89Civil EngineeringHighwaysWaterworksSub-total110 .0031 .8035 .08ON(with funds not controlled by TDD)_--:21 .48 7.35 3.281 .7710.001.2010. 00—110.0011.80—Total Engineering WorksCommunity FacilitiesRC ProjectsPublic Housing176 ,8817 .50582 .40.9621 .4830 — .472451 .937.35-137. 881030.303.288.0090.70251.801 .778.5060.48175.4711 .201.0079.33252.8510. 0076.—03238. 35121 .80-107,51288.26Works on others5465 .742503 .881175.53353.78246.22344.38324. 38517 .57Development ProgrammeTotal10680 .604887 .291667.71735.77643.98833.30783. 091129.46Tin Shui WaiForecast of Expenditure - SummaryPart 2Page 2.3


WORK TYPECURRENTESTIMATED EXP .UP TOCOST ($M) 31/3/1992 1992/1993EXPENDITURE ($M)1993/1994 1994/1995 1995/1996 1996/1997.__LATER &WORKS ON HEAD 707Village HousingCivil Engineering6593.23775.21358.45127.19331.09575.64761.943663.71Civil Engineering Sub- totalHighwaysWaterworks6593.23426.88775.2192.29358.4522.71127.1962.30331*0981.30575.6492.50761.9471.383663.714.40Total Engineering WorksCommunity Facilities7020.11872.50867.5086.24381.163.77189.493.51412.3913.04668.146.54833.3210.203668.11749.20Works on Head 7077892.61953.74384.93193.00425.43674.68843.524417.31Civil Engineering Sub-totalHighwaysWaterworksTotal Engineering WorksCommunity FacilitiesRC ProjectsPublic HousingWorks on othersWORKS ON OTHERS (with funds not controlled by TDD)830 .5512366 .421309 .1314506 .10420— .7014926—.80419 .421418 .20373 .092210 .71-0 .OB2210—.79241. 00166. 1175. 75482. 86—-_4 82 . 86145.68162.77148.08456.53— 10. 00—466.5323.45270.90137.85432.20— 37.31—469.511.00191.77115.82308.59— 93.23—401.82_»2220.17189.542409.71 _85.81—2495.52— 7936.50269.008205.50194.27 —**••8399.77Development Programme Total 22819 .41 3164 .53 867. 79 659.53 894.94 1076.50 3339.04 12817 .08North West NTForecast of Expenditure - SummaryPart 2Page 2.4


WORK TYPECURRENTESTIMATEDCOST ($M)EXPENDITURE L$MAEXP.UP TO31/3/1992 1992/1993 1993/1994 1994/1995 1995/1996 1996/1997LATER &CONTINGENCIESWORKS ON 707Village HousingCivil Engineering11483.723395. 28749 .66427.52602.871000.611101 . 254206.53Civil Engineering Sub-totalHighwaysWaterworks11483.721516.0065.703395. 28275. 6823. 77749 .6646 .895 .00427.5274.272,60602.87157.633.481000.61222.2716.221101 . 25306. 8814. 634206.53432.40Total Engineering WorksCommunity Facilities13065.422581 .733694. 71845. 29801 ,55129 .56504.3996.67763.98169.081239.1068.641422. 7636. 304638,931236,19Works on Head 70715647 .154540. 00931 .11601 .06933.061307,741459. 065875,12ON(with funds not controlled by TDD)Civil Engineering Sub-totalHighwaysWaterworks940.5512398.221344,21419 .421418 .20394 .57241 ,00166.1183.10145.68162 ,77151.3623 ,45270 .90139 ,621.00201.77117 . 022230 .17189 ,54110,007948.30269.00Total Engineering WorksCommunity FacilitiesRC ProjectsPublic Housing14682,983 IB. 001297.895308.442232 .1937 .5056 .683071 .41490.21139.011030.30459,818.00101 .40251 ,80433 .9748 ,50102 .41175 .47319.79101 ,00206 .54252 . 852419 .71110 .00229 .48238 ,358327 .3013.00462.37288.26Works on others21607.315397 .781659.52821 ,01760 .35880. 182997 ,549090.93Development Programme Total 37254.46 9937,78 2590.63 1422.07 1693,41 2167. 4456,60 14966,05CompositeForecast of Expenditure - SummaryPart 22.5


NORTH WEST NEW TERRITORIES DEVELOPMENT OFFICETIN SHUI WAI/YUEN LONG DEVELOPMENT PROGRAMME1993 EDITIONPART 3 - EXPENDITURE BLOCK DIAGRAMSCONTENTSPAGE1. BLOCK DIAGRAM - YUEN LONG NEW TOWN 3.22. BLOCK DIAGRAM - TIN SHUI WAI DEVELOPMENT 3.33. BLOCK DIAGRAM - NORTH WESTERN NEW TERRITORIES 3.44. BLOCK DIAGRAM - COMPOSITE 3.53.1


160 -140 -120 -100 -co= 80 -60 -40 -0 -I--£3I92/93IYuen Long (Head 70?)iTA11II\\\\\\\\\\\\!^//^>\:•:$?.•:193/94 94/ '95 95/96Year7^\\\\\V^//f^X1i96/97Ei Village Housing •Q Civil Engineering •11 Highways •^ Community Facilities I[T] Waterworks InBBHBBBBBBBBPartsPage 3.2


PROJECTED EXPENDITURE ON MAJOR ITEMS BY YEAR400LI Villagefv'l Civil300LJ>] CommunityIcg200100092/93 93/94 94/95YearTin Shui Wai (Head 707)r "'95/96 96/97Part3Page 3.3


1,000c800600 -CivilHighwaysCommunityWaterworks40020092/93 93/94 94/95YearNorth West NT (Head 70?)95/96 96/97PartsPaoe 3.4


1,2001,000800l]co600X400200X0/l^Li«,92/93 93/94Composite (Head ?07)T94/95Year95/96 96/97Parts3.5


NORTH,, WEST NE¥ TERRITORIES DEVELOPMENT OFFICETIN SHUI WAI/YUEN LONG DEVELOPMENT PROGRAMME1993 EDITIONPART 4 : ESTIMATES OF POPULATION MBLIVTNG QUARTERSCONTENTS4A (1) POPULATION ESTIMATES - SUMMARY BY HOUSING TYPE 4.084A (2) LIVING QUARTER ESTIMATES - SUMMARY BY HOUSING TYPE 4.114B (1) POPULATION ESTIMATES - SUMMARY BY PLANNING AREA 4.144B (2) LIVING QUARTER ESTIMATES - SUMMARY BY PLANNING AREA 4.344.01


Til SHPI ULIfTJSb LCIG 31S93 EDITION4 : OF POPULATION AND41414B41(11(2)(1){2}- BY- BY--BYBYGeneral Motes and PefiaitioBs1.0 of Methodology and Sources1.1 Ttiese estimates of population and living quarters are a synthesis offorecasts prepared by this and other Government Departments. The varioussources of forecasts are:Public Sector;PopulationLiving Quarters -Housing Authority using a cohort survivalmethodology; base population is the authorisedpopulation adjusted to a de facto basis.base data is from the Census &Statistics Department (C&SD) Living Quarterframe.Private Sector:Population- forecasts of new flats are from the PublicHousing Development Programme as at 31.3.92 withnecessary adjustments made.derived from a flat supply methodology whichutilises persons per occupied flat (PPOFs)derived from the 1991 Census result, vacancyrates (for new stock built in last 12 months)from the records of the Ra<strong>tin</strong>g 4 ValuationDepartment (MVD) and (for old stock) 1991General Household Survey (GHS) (1st Quarter)result and domestic use rates from the 1991 GHS(1st Quarter) result. Future trend of the ratesof change of the PPOFS were obtained from theWorking Group on Population Distribution4.02


Living Quarters - data on the number of lining quarters at 31.3,92are from the Living Quarter Frame.Forecasts of clearances are from the ClearanceProgramme. Forecasts of new living quarterscompleted in the first two years, 1992/93 and1993/94, are from the RiVD. Forecasts forsubsequent years are based on the status of eachsite. For example, for a new flat to beavailable for first occupation in 1994/95,consent to commence work on the building musthave been issued on or before 31,3.92, Forfirst occupation in 1995/96, the site must ha¥ebeen sold by 31*3»S2 f and for first occupation in1996/97 the site roust have been made available(see Part 5) by 31.3.92. It is assumed that sonew temporary private living quarters will bebuilt, and in respect of institutional populationthe current population was provided by C&SB andfuture establishments are assumed to comeOB-streaii in accordance with Part 6 of this<strong>programme</strong>.1.2 Users will appreciate that the certainty of bringing flats oil-streamas anticipated decreases the further one moves from base-elate. Theforecasts for the first 5 fears are closely monitored aid refinedthroughout the year in order to determine iiore precisely, for exaaiple, theprogramming of coiftiaunity facilities. The <strong>long</strong>er-term forecasts., althoughsomewhat tentative, provide an indication of the likely magnitude ofpopulation build-up implied by the land formation projects included inPart 5 of this Development Programme, plus <strong>development</strong> oa infill sites*The figures Included in "later 8 in Part 41(2} (Total Living Quarters)indicate the likely magnitude of scale of possible changes to the totalliving quarters stock after 2001/02 resul<strong>tin</strong>g from the implementation ofprojects included in Part 6 of this Programe, plus developaent OB infillsites. "Later 1 includes, for example, the completion of flats on. laad tobe made available in say 1997/98, or the clearance of temporary LQs tonake way for a project shown in Part 6 as star<strong>tin</strong>g after 2001/02* Thefigures in 'later 1 in Part 41(1} indicate the effect of the take-up offlats to be completed but not occupied before the end of 2001/02 plusflats to be completed after 2001/02 on land either shown to be madeavailable in Part 5 of this Programme, or on infill sites*1.3 Users should be aware that the bottom-up approach to populationforecas<strong>tin</strong>g, such as that used herein, will usually produce forecastswhich in sum exceed the territorial forecasts* But in view of the myriadof entrepreneurial decisions, site-specific problems, procedural andcontract problems which affect each site, it is difficult to identify withcertainty which projects in this Development Programme will not form landon~schedule, which sites will not be sold, on which sites developers willdelay completion, and how or when the flats built will be occupied. Suchsite-specific information, where available, is taken into account in themonitoring of the short-term forecasts.4,03


1.4 Users are advised, therefore, to seek the advice of the ProjectManager of each <strong>development</strong> office at an early stage in planning projects.2*0 lousing TJF^S2.1 The meaning of each type of housing covered in Part 4A(1) and Part41(2) is largely covered in the definitions of planned uses on pages andof this <strong>programme</strong>. Only the temporary living quarters are not coveredtherein. Private temporary living quarters includes squatters, backlaneand rooftop structures, and other temporary housing such as huts,contractors mat sheds and nissen huts, and simple stone structures due forclearance under Part 6 of the <strong>programme</strong>. Public Sector temporary housingincludes Housing Authority Temporary Housing Areas and Cottage Areas.2.2 The forecasts included in Part 4 B(l) and Part 4 B{2) show populationand living quarters build up for each planning area by planned uses andhousing types as indicated in the codes in the first and second columnof the tables. The meanings of the housing type/planned use codes areindicated below:Type of Housing / Planned UseIndustrial:WorkshopIndustry type AIndustry type BIndustry type CCoBHBercial;CodeIfIAIB1CCommercial {incl* Hotel}c•--- Hotel (single bed) CHI—- Hotel (double beds) CH2Residential: . / , ;Comprehensive Development AreaTown CentreCommercial / ResidentialResidential 1Residential 2Residential 3Residential 4Village Old lousingVillage ExtensionVillage ResiteGovernment Non Departmental Quarters on CRGovernment NOB Departmental Quarters on RlGovernment Non Departmental Quarters on R2CRCD^QCRR1R2R3R4voVEVRGRCRGR1GR24.04


Government Non Departmental Quarters 01 R3Housing Authority Rental EstatesHOS/PSPSHousing Society EstatesGovernment community:Government CommunityAmbulance StationCombined Ambulance Station / Fire StationCarPark(all types)Civic Centre/Cultural Complex ACivic Centre / Cultural Complex BChurchCooked Food Centre (stand alone)Clinic / Health CentrePolyclinicSpecialist ClinicDistrict Community CentreArea Community CentreNeighbourhood Community CentreChildren CentreYouth CentreHome for the AgedCrematorium / Columbarium / Cemetery /Funeral ParlourEducation: Primary SchoolEducation: Secondary SchoolEducation: TertiaryEducation: Special School / Other Ed FacilityDivisional Fire StationSub-divisional Fire StationHospitalIndoor Recreation Centre AIndoor Recreation Centre BIndoor Recreation Centre CLibraryMagistracyMarketMultiple Use Government CommunityDistrict Police StationDivisional Police StationSub-divisional Police StationRegional Police HeadquartersNT Police Traffic HQPost OfficeMonastery, Religious HousePublic ToiletRefuse Collection PointSports ComplexSwimming Pool ComplexStadiumTransport TerminusOther Government CommunityGR3RSiOSiSGCGCAMGCAFGCPKGCCAGCCBGCCHGCCFGCCLGCCPGCCSGCC1GCC2GCC3GCC4GCC5GCC6GCCMGCEPGCESGCETGCEOGCFDGCFSGCHGCIAGCIBGCICGCLIGCMAGCMKGCMUGCP1GCP2GCP3GCP4GCP5GCPOGCMNGCPTGCRPGCSCGCSPGCSTGCTTGCOU


Institutions/Departmental Quarters:Departmental Quarters not elsewhere class 1 fdPenal InstitutionTraining InstitutionResidential Institutions n.e.c.Military InstitutionsOther InstitutionsGIDQGIPIGITIGIRIGIMIGIOUOther Government Uses:DepotFerry pierOfficesPlant NurseryOther Uses including:Service ReservoirsSewage Treatment WorksPumping stationsQpea Space:District Open SpaceDistrict Open Space (non intensive)Urban Fringe ParkLocal Open SpaceAmenity AreaGreen BeltCountryside Conservation AreaLandscape Protection AreaAgricultural LaidOther Specified Uses:Cargo Handling AreaContainer Port AreaContainer FacilitiesBus / PLB DepotMTR/KCR/L1T StationMTR/KCR/LRT DepotMTR Ventilation BuildingPetrol Filling StationElectricity SubstationTelephone ExchangeSlaughter HouseOther Specified UsesFerry PierLai Chi Kok AmusementMonastery BeltUndetermined Uses:Roads;Ei'S rY ,* Dlstril »rt°r Roads & ReservesKCR/MTR/LRT and ReservesLocal RoadGODPGOFPGOOFGOPIGOOUDODONDOFPLOAAGBCCALPAALOCHAOCPAOOCFOBUSOSTNODEPOVNTOPFSOESSOTEXOSHOOSUOFPOLCKOMBUMRTRLR4.06


Temporary Uses:Temporary Industrial AreaTemporary Bousing Area, Cottage AreaTemporary forks AreaOther Temporary UseSquatter Housing / FactoriesBack Lane StructureRoof Top StructureOther Temporary HousingTIATEATWATOUSQTBLSTSRTTOH3.0 Rural Yuen Long District Population3.1 The area covered by Rural Yuea Long District includes the area withinthe Yuen Long District boundary but excludes Tin Shui Wai and Yuen Longlew Town (Please refer to location plan in appendix Ml). According to the1991 Census result, the population in the Rural Yuen Long District was113,120 persons.4.07


E s t i m a t e s o f: P o p 1 1 1 a t i o fio n at End of: Mar chHouoing Type199219931994199519961997199H1999200020012002l.atnrCominerc i a I ResidentialResidential 1Residential 2Residential 3Residential 4Village HousingInstitutional Quartern £ OthersTemporary28106166960001872715885743290871714400017733159453952936617260000176031563480530242177070001728915503706307941743800017619152629993098217806483001826515142952340401835230170019446149128973877819106643500202171487288442526188799092002155014762848'1185218577903?,(102221614572808'1143918393894200236991447277715050107720033050-1732Private Housing SUBTOTAL708607095370597704947037672002792438890796371959429669713850oODHousing Authority EstateHOS/PSPSHousing SocietyTemporary Housing Area479B1004314752700786466890044745865004094504900377442600033838656003023786000280369990026036067143670238351671491602150000Public Housing SUBTOTAL48412483134713646274454264459838958381403725950672502980TOTAL HOUSING11927211926611773311676811580211660011820112704713363014661414699513850POPULATION SUMMARY BY HOUSING TYPES Yuen LongNote:Figures in the Later column are a crude estimate of the increase or decreasein population in the LQs shown in the Later column of Table 4A{2)Please see Definitions on page 4.02


Estimates of Population as at End of; MarchHousing Type1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 LaterCommercial Residential 0 0 0 0Residential 1 7278 22000 28432 67451Residential 2 0 0 0 0Residential 3 0 0 0 0Residential 4 0 0 0 0Village Housing 0 0 0 0Institutional Quarters & Others 0 0 0 0Temporary 0 0 0 00 0 0 0 0 0 067451 67451 67451 67451 67451 67451 67451000000 000000 000000 000000 000000 000000 000000Private Housing SUBTOTAL7278 22000 28432 67451 6745.1 67451 67451 67451 67451 67451 67451Housing Authority EstateHOS/PSPSHousing SocietyTemporary Housing Area0 23417 52138 51631 51136 50614 618020 2140 15653 15941 15909 15852 157910 0 0 ... 0 0 0 00 0 0 0 0 0 061119 6041415724 156310 00 0597101551200589671538800Public Housing SUBTOTAL0 25557 67791 67572 67045 66466 77593 76843 76045 75222 74355TOTAL HOUSING7278 47557 96223 135023 134496 133917 145044 144^94 143496 142673 141806POPULATION SUMMARY BY HOUSING TYPES Tin Ohui WaiFigures in the La tor column are a crude estimate of tho increase or decreasein population in the LQo nhown in the Later column of: Table 4A(2)P1 o a s e n e e D v t" i n i (i o n n o n p a g e 4 . 0 2


Housing Type199219931994Estimates of Population as at End of March•1995 1996 1997 1998 1999 200020012002LaterCommercial ResidentialResidential 1Residential 2Residential 3Residential 4Village HousingInstitutional Quarters & OthersTemporary96805301024011752362810B1210053212880117213628102152205171472011497360760217390511166001157836071521816050015520111833605806187904942031011295359490219680486274201204335947832357056436800124143594640272706753966013156359446735940781452701336035942824305077349303601438835942375548022488540706730557-6-4231Private Housing SUBTOTAL227442321522970230002121720960223812401425350269032935249743Housing Authority EstateHOS/PSPSHousing SocietyTemporary Housing Area000716000000000000000000000000000001200000012000000120000001200000000Public Housing SUBTOTAL716000120001200012000120000TOTAL HOUSING 23460 23215 22970 23000 21217 20960 22381 36014 37350 38903 41352 49743POPULATION SUMMARY BY HOUSING TYPES Yuen Long - Tuen Mun CorridorNote:Figures in the Later column are a crude estimate of the increase or decreasein population in the LQs shown in the Later column of: Table 4A(2)Please see Definitions on page 4,02


Estimates of Living Quarters asat End of MarchHousing Type19921993199419951996199719981999200020012002LaterCommercial ResidentialResidential 1Residential 2Residential 3Residential 4Village HousingInstitutional Quarters & OthersTemporary1183266170007345715244311854719500069457152281130697315000775671520921322673150007350715163313226731500079097151353139670309793007905715134719057830939030088077 IS13471905783094001008807715134719057830940010098987151347190578309400100989871513471905783 0 940010010991715134769504797005500-839Private Housing SUBTOTAL28952289903094730239305183303642138422364332743327444205211Housing Author! t y E a t a t, eHOS/PSPSHousing SocietyTemporary Housing Arc* a1412500212914125008021412500485141250048514125004851412500485106180048510618004851061800485106.185000048510618500004850000Public: Hoii.'itncj SUBTOTAL162541492714610146101461014610111031 1.1.011110 3161031 6 10 I0TOTAL HOI JST NO45206439174555744849451 :>H4764653241533395443059430605IM5;mLIVING QUARTERSSUMMARY BY HOUSING TYPESFiguroH infer Vo Total Living Quartor Stock including vacant LQn and donmntie LOr* uitod wholly for non


.^B of Living Quarter;; an at; End of MatchHousing Type19921993199419951996199719981 9 r J 9200020012002LaterComma re ia 1 Res iden rialResidential 1Residential 2Residential 3Residential 4Village Housing•Institutional Quarters & OthersTemporary01736000000052480000000678400000001609600000001609600000001609600000001609600000001609600()00001609600000001609600000001 609600000000000000Private Housing SUBTOTAL17365248678416096160961609616096160961609616096160960Housing Authority EstateHOS/PSPSHousing SocietyTemporary Housing Area1632 10593 14416 14416 14416 14416 17816 17816 17816 17816 17816 00 1824 4934 4934 4934 4934 4934 4934 4934 4934 4934 00 0 0 0 0 0 0 0 0 0 0 00 0 0 0 0 0 0 0 0 0 0 0Public Housing SUBTOTAL 1632 12417 19350 19350 19350 19350 22750 22750 22750 22750 22750TOTAL HOUSING 3368 17665 26134 35446 35446 35446 38846 38846 38846 38846 38846LIVING QUARTERS SUMMARY BY HOUSING TYPES Tin Shui WaiMote:Figures refer to Total Living Quarter Stock including vacant LQs and domestic LQs used wholly for non domestic purposesFigures in the Later column represent the magnitude of scale of possible changes in the number of LQs after 2002Please see Definitions on page 4.02


Housing TypeCommercial ResidentialResidential 1Residential 2Residential 3Residential 4Village HousingInstitutional Quartern & OthereTemporaryPrivate Housing SUBTOTALHousing Authority RotateHOS/PSPSHousing SocietyTemporary Housing Area1992547019651904381362332493290001272199370701966110435236233059533000019948390196763047233603210100910000Estimates of Living Quarters as19958390196755046223603053982500001996839019666904797360253693970t)0019979840196156204664359217399380000199139840196156205240359215310494at End of March1999 20001575 15750 03.18 3381955 19550 05188 5751359 3592096 204111511 120190 00(}003315000331502001270303382507056983591984135890033150200227030338250751566293591984150350033150Later272209473689223710739-6-1970183580000Public Housing SUBTOTAL 1272 3315 3315TOT All HOUSING 10601 10091 10494 15314 16004 18350 18358LIVING QUARTERSSUMMARY BY HOUSING TYPESMote: Figures refer to Total Living Quarter Htock including vacant LQ.n and domestic LQs unod wholly for non domestic purponeFigures in the Later column represent the Magnitude of ncalo of posr.iblo changer, in t UP number of LQn alter 2002Please BOO Dofinitionfl cm page 4.02PART 4A(2)


New Town,-Yuen LongPART 4B(1)POPULATION ESTIMATES BY PLANNING AREAPlanned Housing 1992 1993*PLANNING AREA 1CRCRRS GCC6GCEP GCEPRS GIDQRSGCCLRSSQVO SQGCOU TSRTVO VEGCEP VOVO VO**SUBTOTAL**'PLANNING AREA 2CR CRGCC6 GCC6GCOU GCOUGCCL GIDQGCOU GIDQRlRlCR TBLSRlCRTBLSTSRTR l TSRT*^SUBTOTAL*** PLANNING AREACR CRl cCRGCP1 GCP1GCES GIDQGIDQ0905478802163492737812220201021736606145453360200371ft2468228604o905477312164928377Q7420281021736616170453360201S7R12468528607Population Estimates as at End of March1994 1995 1996 1997 1 998 1999 20002001905A75112063482736T-TCn19701021735595992443258195a c f\ A24665285890905472962063512635194810217355859254332581930905470962063532635733819071021734575801423156189401905469042063562634.966905467231953592534153090465461936225•J -3J J15119046387195364253314879054623419536724322002 Later14739054608718537324327549 7933 8322 8146 7970 78141882102173456572542315618718501021733555628413055184184110217335555994130551831819102173354553340305418017901021732545444402953178177210217325353903929521768411 8236 8132 7995 7956 7862 7739 766224658285832464428570246362856324625275532462227551246142754424605275352459927530000" 00-18-507-240-400000000000000000


New Town:: Yuen LongPART 4B(1)POPULATION ESTIMATES BY PLANNING AREAPlannedUseHousingType*PLANNING AREA 3OESS GTDQOTEX OTEXRlRlCR TBLSCR TSRT**SUBTOTAL***PLANNING AREA 4CR CRCRCD CRCDGCEP GCEPRS GIOURSRSCRCD •8QCR TBLSCR TBRTCRCD VECRCD VO** SUBTOTAL***PLANNING AREACR CCRCRCRCD CRCDCR TBLSCR TSRTCRVE.**SUBTOTAL***PLANNING AREAGCOU GCOUGCEP OIDQ1992 1993Population Estimates as at End of March1994 1995 1996 1997 1998 1999 2000 2001 2002 Later350 352 342 338 331 327 321 319 316 311 307 08 8 8 8 8 8 8 8 8 8 8 03839 4235 4651 5129 5022 5220 5506 5854 5785 5692 5636 03 3 3 3 3 3 3 3 3 3 3 096 96 93 92 90 89 88 87 86 85 84 05598 6002 6367 6827 6684 6862 7119 7459 7371 7254 7182 02B51 2862 2779 2809 2837 2886 2837 2823 2789 2745 2718 001 01 01 01 0 01 633 1551 2442 2404 2380 011 1 1 1 1 030 30 30 30 30 30 30 30 30 30 30 06448 6229 5869 5521 5203 4909 00 00 00 00 00 054 0 0 0 0 0014 14 13 13 13 13 12 12 12 12 12 068 68 66 65 64 63 62 62 61 60 60 0156 00 00 00 00 00 00 00 00 00 00 018409806 9204 8758 8439 8148 7902 3575 4479 5335 5252 5201 07 7 7 7 7 7 7 7 7 7 7 06396 6488 6319 6272 6139 6060 5958 5928 5857 5764 5707 550 0 0 0 0 0 0 0 0 0 0 1080152 153 348 147 143 142 139 139 137 135 133 00201 202 196 194 190 187 184 183 181 178 1767 7 7 7 7 6 6 6 6 6 6 -66763 6857 6677 6627 6486 6402 6294 6263 6188 6090 6029 112910 10 10 10 10 10 10 10 10 10 108 8 8 a 8 8 7 7 7 7 700


New Town:Yuen LongPART 4B{1)POPULATION ESTIMATES BY PLANNING AREAPopulation Estimates as at End of MarchPlanned Houeing 1992* Use Type19931994 1995 1996 1997 1998 1999 2000 2001 2002Later*PLANNING AREA 6GGES GIDQGOOU GIDQR2 R2VO SQR2 THAR2 THAGCOU TSRTVO VEVO VO** SUBTOTAL**1680453151163610177130816804502903613178117116804400359517.385716804300358817184715804200357616782915848342003569165130315714534100355916222571572552410035561613352157293140003550159372214728844000354115736631472855390035351553625000-3900000-39* PLANNING AREA 7OESS OESSGIOU SQGIOU TBLSGIOU VO•** SUBTOTAL**15304177153041771529407515294075152839731528387215273871152738711527377015263769152636680-500-5* PLANNING AREA 8GCEP GIDQGOESRSGIDQGIOU•RSRSVRVR** SUBTOTAL**241612533653667344852416125335676693440124161253330966534139231612533048676338882315125327506793359223151253244767033280221512531933659327542215125313146563213222151253061264831422211412529833638306312114125290806312987100000* PLANNING AREA 9CR CCRCRGCEP GCEPGCES GCESGCRP GIDQ1892832419267324192963241923032419085324190373241886432418820324187143241857632418491324


New Town?Yuen-LongPART 4B{1)Planned Housing 1992Use Type* PLANNING AREA .9CR TBLSCR TSRT** SUBTOTAL*** PLANNING AREA 10CR CRCR TBLSCR TSRT** SUBTOTAL*** PLANNING AREA 11GCEP GCEPGCBS GCESGCAF GIDQRlRlRl TBLS*'* SUBTOTAL**• .'PLANNING. ARBA 12CRCD CRCDR2CRCDR2SQmBQR2 VECRCD VODO VOGCICGCOUVOVOR2 VO.**SUBTOTAL**5292908272291910673542224671211675100533211148551119935293942277571910678822224673911677800000048550POPULATION ESTIMATES BY PLANNING AREAPopulation Estimates as at End of March1994 1995 1996 1997 1998 1999 2000 2001 2002 Later50 50 49 48 47 47 46 46 4590 89 87 86 85 84 83 82 819446 9379 9231 9161 9006 8961 8853 8714 86277679 7722 7684 7634 7577 7611 7520 7400 7327 37019 18 18 18 17 17 17 17 17 0103 102 100 99 97 96 95 94 93 07801 7842 7802 7751 7691 7724 7632 7511 7437 3702 2 2 2 2 2 2 2 22 2 2 2 2 2 2 2 224 23 23 23 22 22 22 21 216617 6653 6615 6861 7218 7653 7561 7441 736711 10 10 10 10 10 10 10 106656 6690 6652 6898 7254 7689 7597 7476 74020 0 0 0 1019 2493 3924 3862 382400000 000000 0 0 311 762 1197 1178 11670 0 00000 0000 00 00000000 000000 0000 000 000000 0 0050 0 0 0 0 000 050 00 00 00 00139 58 1330 3255 5121


New Town:Yuen LongPART 4B{1)POPULATION ESTIMATES BY PLANNING AREAPopulation Estimates as at End of MarchPlannedUseHousingType199219931994 1995 1996 1997 1998 1999 2000 2001 2002Later00*PLANNING AREA 130046753872831051230188143873058052436314004695187282105123496189144873058252436316004555002740120447184084068351063070004902710118409008408430063030000000116377000011060002970000000114338000012530002930000000112302000035040002880590000011228000001655000287014100000110260000019030002831436722400000109238000020260002791491622100000108215000022640002760317600000-108000003040000255730622661 2083 1896 1998 2206 2393 2697 17243 180003372* PLANNING AREA 14GCCH GCCHVO GCOUR2R2DO SQGCC3 soLO SQOPFS SQR2 SQVO SQ.DOVER2 VEVO VEDO VO250553146617496691103597699717250556146617318694103837027202505391364163096741008089469925001301630566607911820250013000652001662025000000644001928025125300000633002385025306200000629002654025482300000622003104025474600000612003328025469900000606003764000759600000-606005490


New Town:Yuen LongPlanned Housing 1992Use Type^PLANNINGGCEPLOR2VO** SUBTOTAL*** PLANNINGCRCRCDCRCDCRCD** SUBTOTAL**^PLANNINGGCEPVEOCEPGCESIAVEVOGCEPGCESVEVO1CVEVO** SUBTOTAL***PLANNINCrVEAREA 14VO10VO38VO874VOAREA 15CRCRCDsoVOAREA 16GCEPGCOU•SQSQSOSQSQVEVEVEVEVOVOVOAREA 17SQ16546536002432712412446440421301728391782579110667485541993103873416615723POPULATION ESTIMATES BY PLANNING AREAPopulation Estimates as at End of March1994 1995 1996 1997 1998 1999 2000 2001 2002 Later103771316130000576801241004414221002851178907941070742154658000658120002224100027681802077110397015531007051595100015614578 39051603000160312000220406002738187907631027703652000154124980004120249812000215397002684199707471006704951000151524241287002466000579324661200021239200264920640737992704950371112000209385002607218107249767085490001507000148900014650 00 00 01451 07859 10045 10158 10527 75392412 2383 2345 2322 03147 4953 4874 4826 00 00 00 0 00 0 05559120002083830025942262072197171424973361200020537900267823840712959732048721912000202373002798243507019447456487148 01 02 00 00 002000»200369 -3690 00 03049255716511790 0694934007806 126147 -47PART 4B(1)


TownsYuen LongPART 40(1)POPULATION ESTIMATES BY PLANNING AREAPopulation Estimates as at End of MarchPlanned HousingUse Type1992 19931994 1995 1996 1997 1998 1999 200020012002Later* PLANNING AREA 17VOBQVE TBLSVB VEVO VEVE VOVO VO^SUBTOTAL**27238062411514015312733809242151411537265378929715337155926337853891513516422573779530141331767254377261414131183824937697491412919622483769834• 14128204524537709671412621732413761103814124222923937631367131232355-2390716900-110N>O"PLANNING AREA 18VO GCOUVO SQVO VEVO VOA* SUBTOTAL**211022655562110227455823072386542230626165362103298752421023195518210035545092300377850629941395002933 2944 3037 3260 3616 3817 4165 4386 474029743094924900296466548752500-964690373-"*.*.* TOTAL '*•**119272 119266 117733 116768 115802 116600 118201 127047 133630 146614 146995 13850


New Town:Tin Shui WaiPART 4B(1)POPULATION ESTIMATES BY PLANNING AREAPopulation Estimates as at End of MarchPlannedUseHousingType1992 19931994 1995 1996 1997 1998 1999 2000 2001 2002 Later'PLANNING AREA 5RS HOSRSRS**SUBTOTAL**00021401738119521799228635366277987283513633879632807336036793827782357207905274733537878662717435040781926856346757760265383429876912620233893000*PLANNING AREA 8RlRl**SUBTOTAL**72787278145641456414564145641456414564145641456414564145641456414564145641456414564145641456414564145641456400K)*PLANNING AREA 11RlRl**SUBTOTAL**007436743674367436743674367436743674367436743674367436743674367436743674367436743600*PLANNING AREA 13RS RS**SUBTOTAL**0000000000001173611736115981159811457114571132911329111891118900*PLANNING AREA 16• RSHOvSRH'HOSRSRB**SUBTOTAL**000000603660363853380823503311643920403423280312343916403023063310093898401622832307463888399822593304793871398722347302053851396122101299133821393121843295953791390621576292730000*PLANNING AREA 19RlRl**SUBTOTAL**000064326432643264326432643264326432643264326432643264326432643264326432643200*PLANNING AREA 24RlRl**SUBTOTAL**0000001710017100171001710017100171001710017100171001710017100171001710017100171001710000


Naw Towns Tin Shui WaiPlanned Housing 1992 1993Use TypePART 4B(1)POPULATION ESTIMATES BY PLANNING AREAPopulation Estimates as at End of March1994 1995 1996 1997 1998 1999 2000 2001 2002 Later*PLANNING AREA 27RlRl•** SUBTOTAL**0000001233912339123391233912339123391233912339123391233912339123391233912339123391233900.* PLANNING AREA 28RlRl**SUBTOTAL**000000958095809580958095809580958095809580958095809580958095809580958000*** TOTAL ***7278 47557 96223 135023 134496 133917 145044 144294 143496 142673 141806


New TownsYuen Long - Tuen Mun CorridorPART 4D(1)POPULATION ESTIMATES BY PLANNING AREAPopulation Estimates as at End of MarchPlannedUseHousingType1992199319941995 1996 1997 1998 1999 20002001 2002 Later*PLANNING AREA 1CR CRCRIWCR SQCRVECR VO*'* SUBTOTAL**439677602712697688000068867700006776730000673665000066511690000116919040000190473700007374*.»ur*PLANNING AREA 2CRCRCR TSRT**SUBTOTAL***PLANNXNG AREA 3CR CRCRIACR TSRT**SUBTOTAL**5715576263992815745579264992826375642257982747475752254982718465fl512489826592159262459826210255103024198258114351148240982571129511342379825411115111623398250110051105231982480000000*PLANNING AREA 5R2 1AR3 R2R3 SQR2 VO**SUBTOTAL**15.1033339912631532334400126715173243891231151132138412171500314376119114943103711176148630536511571483303363115014773003591137147029535311191465292350lion— i3736-292-3501093* PLANNING AREA 6GCC2 SQVO**SUBTOTAL**710177101779167916791600000000000000


New TownsYuen Long - Tuen Mun CorridorPART 40(1}Planned HousingUse Type*PLANNING AREA 7GCEP SQGCEP VO** SUBTOTAL*** PLANNING AREA 8GCCL SQOCCL VO** SUBTOTAL**POPULATION ESTIMATES BY PLANNING AREAPopulation Estimates ao at. End of Martih199S 1993 1994 1995 1996 199? 1998 1999 2000 2001 200?,033142337033142337033142236033132235033132134000132134000132134000132134000000000000000*000Later000000*PLANNING AREA 10R2 R2DO SQR2 VO** SUBTOTAL**02329520232952002828002828000000000000000000000000000016400164* PLANNING AREA 11R2R2R2 SQR2 VER2 VO** SUBTOTAL**072171110007217111000701611970691610950016016001501500150150015015000000000000000348000348* PLANNING AREA 12CRCD CRCRCD VO** SUBTOTAL**02626026260252502525000000000000000000000481104811* PLANNING AREA 13HS HSRS SQ01150116011201110109000012000012000012000012000000


New Town:Yuen Long - Tu«n Mun CorridorPOPULATION ESTIMATES BY PLANNING AREAPopulation Estimates as at End of MarchPART 4B11)PlannedU0eHousingType1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002*PLANNING AREA 13RSVE7 7 7 7 7RS VO133 134 130 128 126*PLANNING AREA 20MR SQ59 60 58 0 0SQ363 364 354 350 0OOSU VE0 0 0 0 0VO 104 104 101 500 49**SUBTOTAL**255 257 249 246 242* PLANNING AREA 15LOBQ35 35 34 34 33VE SQ244 245 238 235 230VE VE312 313 378 486 654LO VO26 26 25 25 25VE VO253 254 247 244 239£*** SUBTOTAL**870 873 922 1024 1181N> -UV * PLANNING AREA 16RS SQ42 42 41 40 40RS VO26 26 25 25 25** SUBTOTAL**68 68 66 65 65* PLANNING AREA 19IAIA54 54 54 54 54I A TBLS21 21 20 20 20** SUBTOTAL**75 75 74 74 74**SUBTOTAL**526 528 513 450 49000322277542423612733924635419730004fl0003222491724232142938246254.1973.000480012000322221015242311524382462543973000470012000312201179232281681382361541973000470012000312161260232241754372360541973000460012000312141419232221909372360541872005146Later000-31-214200-230-68-37-23-60000009360


New Town;Yuen Long - Tuen Him CorridorPART 4B(1)POPULATION ESTIMATES BY PLANNING AREAPopulation Estimates am at End ofMarchPlannedUseHousingType19921993199419951996199719981999200020012002Later* PLANNING AREA 23VE SQVE VEVE VO**SUBTOTAL**1292653026961302663036991262863947061243222917371223842857911204162818171184752768691185092759021165682729561145952679761136522651030-113730-40^PLANNING AREA 24CR CRR3 R3**SUBTOTAL**000000000000000000000277027767206721057010571046010460278278*PLANNING AREA 25R3R3**SUBTOTAL**0000000000000000000000153153*PLANNING AREA 26LO SQVE SQVE VEVE VO**SUBTOTAL**248084220811542581845209116007882120211010778122001089076815196108700838193103100874190106400903189109200941187112800958184114200996182117800150201502*PLANNING AREA 28IAIWIA SQ**SUBTOTAL**1242512526124251242512324000000000000000000000*PLANNING AREA 29VO CVO SQVE VE1398013990128264127915412733631270531126581412649791261125412561398125416640-254550


New Town:Yuen Long - Tuen Mun CorridorPART 4BU)POPULATION ESTIMATES BY PLANNING AREAPopulation Estimates as at End of MarchPlannedUseHousingType1992 1993 19941995 1996 1997 1998 1999 2000 2001 2002 Later^PLANNING AREA 29VO VEVE VOVO VO** SUBTOTAL**16802978628941687297892905163828766277916202875728391586287412992156527732312615392771933651531277163518151226707376114882669638651473266894107000296* PLANNING AREA 33CR CRR3 R3OOSU SQR3 SQOOSU VER3 VEOOSU VOR3 VO*'* SUBTOTAL**2703243518835275614270326351884527561726831634-1881517360726213133417805072613253030601704904272573302017048046525130297017048051724191296017047057524189292016047056824186287016046055924184284016046055400-284028380002554* PLANNING AREA 37R4R4R4 SQR4 VO** SUBTOTAL**01.053814301063914501033714001013713809936135098361340963513109635131095351300933412709234126413-92-34287* PLANNING AREA 54DO SQDO THA** SUBTOTAL**21716737220222102121021000000000000000000000000* PLANNING AREA 55R3 R3** SUBTOTAL**4949494948484747464649495454606059595858585800


Town:Yuen Long - Tuen Mun CorridorPART 4B(1)POPULATION ESTIMATES BY PLANNING AREAPopulation Estimates as at: End of MarchPlannedUseHousingType199319931994 1995 1996 1997 1998 1999 20002001 2002 Later*PLANNING AREA 59R3tWR3DOR3SQR3 SQR3R3VEVO**SUBTOTAL**435483512435411527798594207116581092510640701657121251271036102813505138803510281466-511840-33-6-281112K)00*PLANNING AREA 61tA SQIA VO'** SUBTOTAL***PLANNING. AREA 65IA SQ•IA- VO**SUBTOTAL**8425021254684250222547841492124458414921244584048202343000000000000000000000000000000*PLANNING AREA 66I-AIAIASQIAVEIA VO'MSUBTOTAL**16177186327416178186327516172186226816171176126516167176026016165175925716120104218816787261271636396416-5-3-6216-5 _ r>-6200000*PLANNING AREA 67VE SQVE VEVE VO**SUBTOTAL**114631936671146419466910469188667104911866871052918272110549180739105861777731060917610647174106631719700169-9530795 831 844 878 42


New Town;Yuen Long - Tuen Mun CorridorPART 4BU)POPULATION ESTIMATES BY PLANNING AREAPopulation Estimates as at End of MarchPlannedUseHousingType1992199319941995 1996 1997 1998 1999 200020012002 Later*PLANNING AREA 68OQSU SQOOSU VEOOSU VO*:* SUBTOTAL**110111092301101110923010711106224106101052211041010321710210101213101101002111001099209991098207971096203961095201-96-10-95-201*PLANNING AREA 69OOSU IWOOSU SQOOSU VEOOSU VO**SUBTOTAL**374611816568137463181666843744918161665374441715965737435171566453742917154637374221715162737420161506233741516149617374091614660837404161456020-404-16-145-565*PLANNING AREA 70OOSU IWOOSU SQOOSU VO'** SUBTOTAL**435256443525644342462434246243323604322359432235943222584312257431225743122570»31-22-53*PLANNING AREA 71R3R3LO SQR3 SQLO VOR3 VO**SUBTOTAL;1051927125439859125192292536376126218222243538794180178027487052701750268970508013201908305110130018682759208801127927150870111913905045 0379871022045037110425340-47 0-432444^PLANNING AREA 72OOSU IWOOSU R3OOSU SQOOSU VO**SUBTOTAL**1407345901338142373759213661454716575135914857085691376148469355713481483684550133114816735401308148166953713011480661533128614796f)l522147864451700-644-5171266 -1161


UJoNew Town:PlannedUseYuen Long - Tu«*nHousingType*PLANNING AREA 74R2 R3**SUBTOTAL***PLANNING AREA 75R3R3R3 SQR3 VQ**SUBTOTAL***PLANNING AREA 76R3 R3R3 SQR3VER3VO**SUBTOTAL**^PLANNING AREA 77GOEP GCEP**SUBTOTAL**^PLANNING AREA 78R3R3GCOU SQR3 SQGCOU VOR3 VO**SUBTOTAL**^PLANNING AREA 112MR SQ1992273460043316926386540734661281109511049498986Mun CorridorPOPULATION ESTIMATES BY PLANNING AREAPopulation Estimates as at End of March1993 1994 1995 1996 1997 1998 1999 20000 00 0435 422170 165264 257869 844580 563347 33762 60282 2741271 12341 11 10 049 4849 4890 8786 83274462664526200418163254835557333592711220I10474786820020800208545000545110000044 43 43 42 42 4120014441200210740PART 4B(1)Later0 0 81 198 311 308 00 0 0 0 44 107 7430 0 0 0 0 0 0000000 0 000 000 0 0000 00 004770047753800053811086000860529000529118112870012875270005271119813390013395200005201131114250014255590005591130814770014776160006161105820058276600076600743-40


New Town?Yuen Long - Tuen Mun CorridorPART 4B(1)POPULATION ESTIMATES BY PLANNING AREAPopulation Estimates as at End ofMarchPlannedUseHousingType19921993199419951996199719981999200020012002Later*PLANNING AREA 112OOSU SQOOSU VEOOSU VO**SUBTOTAL**71721159943720211609476992015591969120154909,67720150890668191498796571914686465319145859646191448506351814183562918140827-62922478021809*PLANNING AREA 114R3R3R3 SQR3 VER3 VO**SUBTOTAL**07141204131247071712141512530696117403121606881163981202067411339011770665112385116206541103781142065110937611360643108372112306331063661105062610536210932300-626-105-3621207*PLANNING AREA 116VE SQVE VEVE VO**SUBTOTAL**238582145102395821551223289208529229132206567225203202630222243199664218311196725217351195763214418192824211451189851209516188913-209840-125*PLANNING AREA 118GCOU GCOU**SUBTOTAL**21721721721721721721721721721721721721721721721721721721721721721700*PLANNING AREA 120VE VEVE VO**SUBTOTAL**12436649012536749213335749014835350117234551718534152620933554422333455724632957525732458128032160129029^PLANNING AREA 132VE SQVE VE3433353334773314032242323013239831457315523060230694-30120


M«*w Town:Yuen Lcmg - Tuen Hun CorridorPART 40(1)POPULATION ESTIMATES BY PLANNING AREAPopulation Estiimatfls afl at End of MarchPlanned Housing 1992 1993 1994 1995 1996 1997 1998 1999 2000U«€> Type?* PLANNING AREA 122VE VO**SUBTOTAL***PLANNING AREA 123OOSU SQVEOOSU VO**SUBTOTAL***PLANNING AREA 124R4 R4R4 SQVB VEVE VO**SUBTOTAL***PLANNING AREA 125R4R4R4 SQR4VO**SUBTOTAL***PLANNING AREA 126R4R4R4 SQR4- - VO**SUBTOTAL**8315054802257007250118591021813435201522918184152550022572072503185930219135354015329182fll19253402155507050118589021213134301482817680353528021549069515176010000014628174793535170215380685361762100000000784110020200675481763200000000765060020200665691765200000000765640020200655851766700000000756580020200060816624000000002001 Later747060019190061616632000000007379701781919729106431695036003633003309003323033235361036053976610066163200632*PLANNING AREA 127VE SQ10910910610510310110099989796-96


New TownsYuen Long - Tuen Mun CorridorPART 4BU)POPULATION ESTIMATES BY PLANNING AREAPopulation Estimates as at End of MarchPlannedUseHousingType199219931994 1995 1996 1997 1998 1999 200020012002Later."PLANNING AREA 137VE VEVB VO**SUBTOTAL**1701524311711534332101484642681475203641446114171426605081397475621398006531378886971359297851331014116020*** TOTAL ***23460 23215 22970 23000 21217 20960 22381 36014 37350 38903 41352 49743


PART 4B(2)New TowniYuen LongLIVING QUARTER ESTIMATES BY PLANNING AREAPlanned Housing 1992Use Type1993Living Quarter Estimates as at End of March1994 1995 1996 1997 1998 1999 2000 20012002 Later"FLANWlNU AKC.ACR CRRS GCC6GCEP GCEPRS GIDQRSRSGCCL SQVO SQGCDU TSRTVO VEGCEP VOVO VO*'SUBTOTAL**JL09051213593117121609051090512135931191216 16213593117120905121359311912160 656 656 656 656 656 656 090 90 9051 90 9051 905 90 0051 5 5 5111 12135 2135 2135 2135 2135 2135 2135 09 931 931 9 9 9 9 -933 3 3 3 -311 1 1 1 0021 21 23 23 25 25 2912 12 12 12 12 12 12 -1216 16 16 16 16 16 16 02289 2289 2291 2291 2293 2949 2951 2951 2953 29532957 -24CRGCC6GCOUGCCLGCOURlCRRlCRRl**SUBTOTAL**CRGCC6GCOUGIDQGIDQRlTBLSTBLSTSRTTSRT78910217915240018132481789102179152400181324817891021791524001813248178910217915240018132481789102179152400181324817891021791524001813248178910217915240018132481789102179152400181324817891021791524001813248178910217915240018132481789102179152400181324813468 3468 3468 3468 3468 3468 3468 3468 3468 3468 3468'0000000000*PLANNING AREA 3CR CRl CCRCRGCP1 GCPlGCES 01DQGIDQ• GIDQ24267221502426722150242672215024267221502426722150242672215024267221502426722150242672215024267221502426722150000000


New TowniYuen LongPART 4B{2)LIVING QUARTER ESTIMATES BY PLANNING AREALiving Quarter Estimates as at End of MarchPlannedUseHousingType1992 19931994 1995 1996 1997 1998 1999 2000 2001 2002LaterUJui*PLANNING AREA 3OESS GIDQarmOTEXRlRlCR TBLSCR TSRT**SUBTOTAL**"PLANNING AREA 4CRCRCRCD CRCD6CEP GC.EP.RSG1OURSRSCRCD SQCR TBLSCR TSRTCRC0 VECRCn vo**SUBTOTAL**^PLANNING AREA 5CR CCRCRCDCRCRCDCR TBLSCRCRTSRTVE**SUBTOTAL***PLANNING AREA 6«COU GCOUOCEP GIDQ87815001392062115501303507246306092-490572609067893277510287820781392640115501303507063000472972631067893279710287 878 82078 20781 139 392640 26401155 125501 0130 303507 35070 06 630 300 00 04729 48297 72633 26310 067 6789 893 32797 279710210287820781392640125501303507063000482972633067893279710287825101393072125501303507063000482972631067893279710287825101393072125510981300063000242072631067893279710287825101393072125530981300063000242072631067893279710287 878 82510 25101 139 393072 30721255 12551098 10981 I30 300 00 06 630 300 00 02420 24207 72631 26310 067 6789 B93 32797 279710 •j102878251013930721255109813000630002420726310678932797102000000000002549900 „. -i521


New TowniYuen LongPART 4BU)LIVING QUARTER ESTIMATES BY PLANNING AREAtfcfcUJenPlannedHousingType*PLANNIN( 1 AREA 6GCEJ3 «rr)QGCOU tHDQO *"*K.t"fR2Vn V vJ OQR2 THAR2 THA•GCOII THRTVO VEVO VO**SUBTOTJtL***PLANNING AREAOESS OESSGTOW SQGTOU TBL8GIOU VO** SUBTOTAL*'*1992199:i 1994 19954 4 4 42 2 p 20 0 0 01 8 18 18 181327 0 0 0317 317 0 01 1 1 1216 216 216 21677 77 77 77Living Quarter fcitimatm? a« at End of March19964201800121677199742793180012167719981999 20004 4 42 2 21272 1272 127218 18 180 0 00 0 0I 1 1216 216 ?,1677 77 77200142127318001216771974 647 330 330 1123 1602 1602 1602 16021 1.254 54132131213ft 4121354121354121354121354121354121354121354200242127218001216771602121354Later000-1800000-180-200* PLANNINGOCGPOCESRrrRSAREA(j I DOdim;VRVR**SUBTOTAL**.64125848323664125848323670 70 70 70 7.0 70 70 706412584832S564125848325564125848325564125848325564125848325564125848325564125848325564125848325570641258483255-200000* PLANNING AREA 9CR cCRCRGCEP GCEPGCES GCESGCRP OTDQ8854 8H54 8873 8873 8873 8«73 8873 8873 8873 88731 138f>0 38603•j2 f,1 x138602i1391732.13917321I3917321139173211 13917 39173 32 21 11391732188731391732100000


New TowmYuen LongPART 4B(2)LIVING QUARTER ESTIMATES BY PLANNING AREALiving Quarter Estimates as at End of. MarchPlanned Housing 1992Use Type19931994 1995 1996 1997 1998 1999 2000 2001 2002Later* PLANNINGCRCR** SUBTOTAL **AREA 9TBLSTSRT23413931234139312341393123413988234139882341398823413988234139882341398823 2341 413988 3988•* PLANNINGCRCRCR** SUBTOTAL**AREA 10CRTBLSTBRT3152946320731529463207329594633503295946335032959463350338094634353380946343533809463435338094634353380 33809 946 463435 343517100171* PLANNING AREA 11GCEP GCEPGCES GCESGCAF GIDQRlRlRl TBLS**SUBTOTA! j * *2262717527322262717527322262837528522262837528522262837528522263399534142263399534142263399534142263399534142 22 263399633995 53414 3414* PLANNINGORCDR2CWTDR3R2CRCD00acreR2 VO**SUBTOTALAREA 12CRCDR2mSQ-VEVOVOVOVO0031485243350000002431000000000300000000030000000000000000000001765539000000001765539000000001765539000000001765 1765539 5390 00 00 00 00 0.0 00 00 02304 2304 2.104 23040000000000


Now Town:Yuen LungI*ART 4B(?.)LIVING QUARTER ESTI.MATKJJ BY PLANNING AREALiving Quarter EntJ mat:en a««i t. End of March1992 19931994 1995 1996 1997 1998 1999 2000 2001La I.or£*DO00188213511342494856651301020522183137001882135H3424948566513010205221831370018821011304948566030f)3712203137000210113049485003003710031370000000494850000537000137000000049485000053700013700000004948500007030001370980000049485000070300013709800000494850000869000137500098000004948500008690001375 0009800000494850000103300013701 -1 J 400000-4900000000001-175 1475 1485 1209 1208 1208 1374 1472 1638 6638 6802 1365."PLANNING AREA 14GCCH GCCHVO GCOUR2R2DO SQGCC3 SQLO SQOPFS SQR2 SQVO SQDOVER2 VEVO VEDOVO250242629721730232193226272250242629713930232272262722502426297139302322749927225006071393020274990250060003020077202500000030200772025209200000302001045025209200000302001045025209200000302001318025209200000302001318025209200000302001591000338300000-3020000


New Town:Yuen LongPART 4B


Now Town:Yumi LongPART,IVTN(t QUARTER ESTIMATES BY PLANNING AREALiving Quarter Eot;in»at:en ao at; End of MarchPlannedUa«HousingType19921993199419951996199719981999200020012002La I: or* PLANNING AREA 17VO SQVETBIiSVEVEVO VEVE VOVOVO** SUBTOTAL**110]285856635701101285856615701101290176661666110129017666166611012952676617621101295267661762110130035866185811013003586618581101305449661954110130544966195411013095396611048-11000000-1324^O^PLANNING AREA 18VO GCOUVO SQVOVEVO VO** SUBTOTAL**23682928211492368292822361091282236109128223613532822361353282236161528223616152821149 1411 1411 1673 1673 1935 193523618772822197236187728223621412822197 24610-3600-36*** TOTAL ***4520643917 45557 44849 45128 47646 53241 533395443059430 605235211


New Town:Tin Shui WaiPART 4B(2)LIVING QUARTER ESTIMATES BY PLANNING AREALiving Quarter Estimates an at End of MarchPlannedUseHousingType1992 19931994 1995 1996 1997 1998 1999 2000 2001 2002 Later* PLANNING AREA 5RS HOSRSRS**SUBTOTAL**016321632182459487772246678741034024667874103402466787410340246678741034024667874103402466787410340246678741034024667874103402466787410340000*PLANNING AREA 8RlRl**SUBTOTAL**173617363472347234723472347234723472347234723472347234723472347234723472347234723472347200*PLANNING AREA 11RlRl**SUBTOTAL**001776177617761776177617761776177617761776177617761776177617761776177617761776177600*PLANNING AREA 13RSRS**SUBTOTAL**000000000000340034003400340034003400340034003400340000* PLANNING AREA 16RSHOBRSHOSRSRS**SUBTOTAL**{)00000464546451216125265429010121612526542901012163252"654290101216125265429010121612526542901012161252654290101216125265429010121612526542901012161252654290100000*PLANNING AREA 19RlRl**SUBTOTAL**000015361536153615361536153615361536153615361536153615361536153615361536153600* PLANNING AREA 24RlRl**SUBTOTAL**000000408040804 0 ft 0408040 «040804080408040804080408040 BO408040804 0 8 0408000


New Town: Tin Oliui WaiPART 4IK2)LIVING QUARTER ESTIMATKS BY PLANNING AREAPlannedUseHour; ingType1993Living Quarter Botima t r?j» a« at; End of Mnrch1994 1996 1997 199fl 1999 2000 2001 2002 La tier* PLANNING AREA 27RlRl**SUBTOTAL***PLANNING AREA 28RlRl**SUBTOTAL**000000000000294429442288228829442944228822882944294422882288294429442288228829442944228822882944294422R82288294429442288228829442944228822880000*** TOTAL ***336817665 26134 35446 35446 35446 38846 38846 38846 38846 38846


New Town:Yuen Long - Tuen Mun CorridorLIVING QUARTER ESTIMATES BY PLANNING AREALiving Quarter Estimates as at End of MarchPART 4B(2)PlannedUseHousingType199219931994 1995 1996 1997 1998 1999 2000 20012002Later^PLANNING AREA 1CRCRCRIWCR SQCRVECR VO**SUBTOTAL**20723922643343672392264494367000036736700003673670000367367000036736700003673670000367367000036714950000149514950000149500000*PLANNING AREA 2CRCRCR TSRT**SUBTOTAL**23032332303233362336536233653623365507351050735105073510507351050735105073510*PLANNING AREACR CRCRIACR TSRT**SUBTOTAL**97941109794110979411097941109794110979411097941109794110979411097941109794110* PLANNING AREAR2 IAR2R3R2 SQR2 VO**SUBTOTAL**11961401474841396140347484119614014748411961401474841196140147484119614034748411961401474841196140147484119614014748411961401474841196140147484-I132,-140-147444*PLANNING AREA 6GCC2 flQGCC2 VO**SUBTOTAL**000000


Town; Vur»n Long Tuen Mun CorridorPART 4BC2)LIVING QUARTER ESTIMATES BY PLANNING AREAPlanrmdUe«HousingType1992199319941995Living Quarter Estimates as at End of March19961997199 a1999200020012002Later* PLANNING AREA 7GCEP I!QGCEP VO**SUBTOTAL**314314314314314000000000000000000000^PLANNING AREA 8(ICCL SQGCCL VO** SUBTOTAL**59145914591459145914591459145914000000000000^PLANNING AREA 10R2R2DOSQR2VO** SUBTOTAL**010102001010200010100010100000000000000000000000000000690069* PLANNING AREA 11R2R2R2 SQR2 VER2 VO** SUBTOTAL**030543903054390305439030543900505005050050500505000000000000000146000146* PLANNING AREA 12CRCD CRCRCD VO** SUBTOTAL**01111011110111101111000000000000000000000272202722* PLANNING AREA 13HS HSRSSQ04004004004004000003315033150331503315000


New Town:Yuen Long - Tuen Mun CorridorLIVING QUARTER ESTIMATES BY PLANNING AREALiving Quarter Estimates as at End of MarchPART 4B(2)Planned Housing 1992 1993 1994 1995 1996 1997 1998 1999 2000Use Type2001 2002 Later*PLANNING AREA 13RSVERS VO**SUBTOTAL**3559835598355983559835598000000003315003315003315003315000*PLANNING AREA 15LO SQVESQVE VELO VOVE VO**SUBTOTAL**12841141110432512841141.1104325128422611104437128422611104437128433811104549128433811104549128445111104662128445111104662128456411104775128456411104775128467711104888-12-840-110-107*PLANNING AREA 16RSSQRSVO**SUBTOTAL**141125141125141125141125141125141125141125141125141125141125141325-14-11-25*PLANNING AREA 19IAIAIA TDLS**SUBTOTAL**5476154761547615476154761547615476154761547615476154761000* PLANNING AREA 20MRSQOOSU SQQOSU VEOOSU VO* *SUBTOTAL**2113604221126042211260420126042189 189 168000210002100022000210002.100021008321003310


PARTw Town: Yuen Long - Tuen Mun CorridorLI VINCI QUARTER ESTIMATES BY PLANNINGLiving Quarter Eotimates asPI annod Housing 1992 1993 1994 1995 1996 1997 199ftUne TypeARKAat End of March1999 2000 2001 Later* PLANNING AREA 23VE SQVRVEVE VO**SUBTOTAL**45971242664597124266451381243074513812430745179124348451791243484522012438945220124389452611244304526112443045302124471-4500-45^PLANNING AREA 24CRCRR3R3**SUBTOTAL**000000000000000000000591059159105915910591591059101 57157*PLANNING-AREA 25R3R3**SUBTOTAL**00000000000000000000008686*PLANNING AREA 26LO. SQVE SQVE VEVE VO**SUBTOTAL**9283088543092830885430028308854210283088542102834185454003418542600374854590037485459004078549200407854920044085525006030603*PLANNING AREA 28IAIWIASQ**SUBTOTAL**19101910191019101910000000000000000000000'PLANNING AREA 29VO cVO SQVE VE113701137011009311009311002771100277110046211004621100647110064711008320-10093


New Town:Yuen Long - Tuen Mun CorridorLIVING QUARTER ESTIMATES BY PLANNING AREALiving Quarter Estimates as at End of MarchPART 4B(2)Planned Housing 1992 1993 1994 1995 1996 1997 1998 1999 2000Use Type2001 2002 Later^PLANNING AREA 29VOVEVE VOVOVO** SUBTOTAL**617123221089617123221089617123221145617123221145617123221329617123221329617123221514617123221514617123221699617123221699617123221884000-7f£** PLANNING AREA 33CRCRR3R3OOSU BQR3SQOOSU VER3 VEOOSU VOR3VO** SUBTOTAL**1301121263121302251301121263121302251316112126312130241131611212631• 213024113161120602101681310411206021025613104112060210256131041120602102561310411206021025613104112060210256131041 1, 206021025600-112011890001077* PLANNING AREA 37R4R4R4f»QR4VO** SUBTOTAL**034I ft49034154903415490341549034154903415490341549034154903415490341 5490341549178-34-Ib129* PLANNING AREA 54DO SQDO THA** SUBTOTAL**101272128210010100101 0010000000000000000000000000* PLANNING AREA 55R3R3** SUBTOTAL**19191919191919191919252525252525252h2525252500


Nc»w Town iYuen Lomj - Toon Hun CcirridorPART*J2*OOLIVING QUARTERKSTIMATKJ! BY PLANNINGLiving Quarter I-i;it imaton anPlanned Housing 1


New Town:Yuen Long - Tuen Mun CorridorLIVING QUARTER ESTIMATES BY PLANNING AREALiving Quarter Estimates as at End of MarchPART 4B(2)PlannedUseHousingType19921993199419951996199719981999200020012002 Later^PLANNING AREA 68OOSU SQOOSU VEOOSU VO**SUBTOTAL**4944194494419449441944944194494419449441944944194494419449441944944194494419449-4-41-94'PLANNING AREA 69OOSU IWOOSU SQOOSU VEOOSU VO**SUBTOTAL**37207663313372076633133720766331337207663313372076633133720766331337207663313372076633133720766331337207663313372076633130-207-6-63-276^PLANNING AREA 70OOSU IWOOSU SQOOSU VO**SUBTOTAL**4169294169294169294169294169294169294169294169294169294169294369290-16-9-25^PLANNING AREA 71R3R3LO SQR3SQLO VOR3VO**SUBTOTAL**42fl121916634698810291373542348102913749022608301084172260830108417231064078373231064078373382044048474382044048474533024018575533024 01857511130-240-181071* PLANNINGOOSUOOSUOOSUOOSU*SUBTOTAL*AREAIWR3SQVO7214033022456814363302246041436330224604143633022460414363302246041436330224604143633022460414363302246041436330224604143633022-1604143633022460400330224


New Towni Yuen Long Tuon Mun CorridorPART 4B


tnNew Town:Yuen Long - Tuen Mun CorridorLIVING QUARTER ESTIMATES BY PLANNING AREALiving Quarter Estimates as at End of MarchPlanned Housing 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001Use Type"PLANNING AREA 112OOSU SQOOSU VEOOSU VO** SUBTOTAL**"PLANNING AREA 114R3R3R3SQR3VER3VO** SUBTOTAL**"PLANNING AREA 116VE SQVEVEVEVO** SUBTOTAL**"PLANNING AREA 118GCOU GCOU** SUBTOTAL*** PLANNING AREA 120VEVEVEVO** SUBTOTAL**3016583840300381524901001978197217217401341.7430165838403003815249010019781972172174013417 1301658384030038152490100597823721721754.1341.8030165838403003815249010059782372172175413418ft30165838403003815249010099782772172176B134202301658384030038152490100997827721721768134202301658384030038152490100139783172172178213421630165838403003815249010013978317217217H213421630165838403003815249010017978357217217961 3 42.1030165838403003815249010017978357217217961342302002 La tor30165838403003815249010022078398217217I 1 01342 -1 4PART 4B(2)301824907929969-300~ 3 8-1524791000010000000* 1* !.• AN N I NG A R E A 12 2VE SOVEVP15n151 1H>fitt156tt151251512515182151(121.5239I 1 )2 3 91529 B1 S0


*w Town; Yuen Long - TUCMJ Mini CorridorPI armedUseHoi HI inqTypf** PLANNING ARKA 122VEVO**SUBTOTAL***PLANNING AREA 133OOKU SQOOStJ VEOOSU VO**SUBTOTAL**•*PLANNING AREA 124R4R4R4SQVE VEVE VO**SUBTOTAL***PLANNING AREA 125R4R4R4SQR4VO**SUBTOTAL**^PLANNING AREA 126R4R4R4 SQR4VO**SUBTOTAL**1992 199331 3157 57230 23008 08238 2380 030 30160 1607 7197 1970 092 9249 49141 1410 064 6410 107474Ali HALIVING QUARTER INTIMATES BY PLANNING641064 0 0 0 0 010 0 0 0 0 0Li v int-l U^j I%M t i Mfi t; r*f* <strong>tin</strong> rtt; Endof March1,94 1995 1996 1997 1998 1999 200031 31 3 1 31 31 31 3 1114 114 171 171 22H 328 285230 230 230 0 0 008 08 0 0 0 08 8 8 8230 238 238 8 8 800880 0 0 0 0 0 030 30 30 30 30 30 0177 177 194 194 211 211 2287 7 7 7 7 7 7214 214 231 231 248 248 2350 0 0 0 0 0 092 0 0 0 0 0 049 0 0 0 0 0 0141 0 0 0 0 0 00 0 0 0 0 0 07474200120023 1 312nr, 3440 00 2578 88 2650 4150 0228 2477 7235 6690 510 0000 51000490049PART 4B (>UL,i|-,u-0150102801028165900016592050020519500195*PLANNING AREA 127VE SQ46464646 46 46 46 46 46 4646-46


New Town:Yuen Long - Tuen Mun CorridorLIVING QUARTER ESTIMATES BY PLANNING AREALiving Quarter Estimates as at End of MarchPART 4B(2)Planned Housing 1992 1993 1994 1995 1996 1997 1998 1999 2000Use Type20012002Later^PLANNING AREA 127VE VEVE VO**SUBTOTAL**5456156545615610956211109562111645626616456266219563212195632127456376274563763315643300-46^en*** TOTAL ***10601 9533 10091 9825 9397 9938 10494 14826 15334 16904 18350 18358


NORTH WEST NEW TERRITORIES DEVELOPMENT OFFICETIN SHUI WAI/YUEN LONG DEVELOPMENT PROGRAMME1993 EDITIONPART 5 - SERVICED LAND AVAILABILITYCONTENTSPAGE5A (1) SUMMARY : GROSS AREAS 5.065A (2) SUMMARY : NET AREAS 5-105.01


Til SMIILOWG1993PUT 5 :MID AV1ILIBILITY: -51 (1) : AREAS51 (2) : IETGeneral Motes aid Definitions1.0 Land Availability1.1 Land available in any given year isa) land which has been produced or is forecast to be produced byengineering projects in that year, plusb) land in a 'produced 8 state obtained by clearance in that yearof acquired or resumed properties, plusc) land in a 'produced 1 state obtained by the termination in thatyear of a Short Term Tenancy or a Temporary Government LandAllocation.1.2 Land may be produced as a result of:a) land formation contracts already-let by Government; orb) land formation projects not yet started by Government bu<strong>tin</strong>cluded in this Development Programme; orc) land formation projects on unformed areas already sold orgranted, or forecast to be sold or granted to the private orsubsidised sector; ord) resiiiiption or clearance.1*3 The fear in which land is 'produced* is that in which the landreaches a state where foundation work or building construction can startCor in a similar state where no work is envisaged), and where thenecessary services are available* The year of production is generallytaken to be the year of hand-over to the land authority for allocation orsale. . However,(a) where land is^disposed of unformed or partly formed (i.e. no<strong>tin</strong> a state which allows construction to start) the anticipatedyear of completion of the land formation works is regarded asthe year in which the land is produced;5.02


(b) government engineering services (i.e. roads, drains and watersupply) may not necessarily be complete at a hand-over date, butthey are expected to be available before building occupation.Where the land has been formed or is forecast to be formed bu<strong>tin</strong>sufficient services are available to allow construction tostart, the land is regarded as formed but not produced;2*0 Areas(c) the year of availability of land under a temporary use isbased on the date of termination / expiry of the short terntenancy / permit plus a period required for clearance. It isassumed that the short tern tenancy or permit will not berenewed or extended upon expiry. Sites with month-to-monthshort term tenancies could be terminated at any time a demandfor permanent <strong>development</strong> thereon is identified. An exceptionis made, however, for sites occupied by Temporary Housing Areas(TEA) . THA use of the sites is generally assumed to con<strong>tin</strong>ueuntil the site is required for a project included in Part 6 ofthe Development Programme, or is forecast to be sold throughthe land sales <strong>programme</strong>.2.1 let Area is defined as the area of the site within which<strong>development</strong> is permitted according to the prevailing <strong>development</strong> controlsand lease conditions. In most cases it is the area which counts for plotratio purposes within the boundaries of a Town Lot or a Government LandAllocation.2.2 Gross Area of each site is defined as the net site area (see above)plus a portion of the adjoining land which is not part of a net site, suchas cut slopes, local roads and local open space. In practice* sites maybe grouped into 'zone parcels* within which the land which is not part ofa net site is apportioned according to net areas.2.3 let Area = Gross Area. Where comprehensive <strong>development</strong> isgenerally of one type , for example comprising oily housing plusancilliary facilities, it is appropriate that the gross area and net^areaare the same. However, schools or other major community facilitiesincluded in such comprehensive <strong>development</strong> areas are treated as separatenet sites* For example, where part of the site of a public housingestate is set aside for a school, the net site area and the gross sitearea of the public housing estate have been amended to exclude theschool. The school is counted as a separate site*3.0 Planned Land UseIndustrial includes all land .-with a planned use of Industrial type 1(IA) f Industrial type B (IB), Industrial type C (1C), or Workshop ClfKIA uses are mostly light manufacturing/ labour intensive industries. Theplot ratios of IA buildings and the worker densities are usually high. ^IBuses are typically capital intensive, land extensive industries which5.03


eauire purpose-built accommodation. The plot ratios of IB buildings andworker densities are usually low. 1C uses include bulk storage,warehousing and bulk dangerous goods storage which require sites withspecial attributes such as access to port facilities and water-frontage.II uses are only found in the rural townships.Commercial includes uses such as shops, offices, hotels and showrooms,It does not include any residential use as of right.C0«ercial / Residential includes uses such as those in Commercial (seeabove) plus residential flats. Generally the population densities andplot ratios are similar to Residential 1 areas (see below).Residential 1 is the highest density residential planned use. For newtown areas, population densities may be around 1740 persons per hectare,with a maximum plot ratio of 8.0* For rural townships and new <strong>development</strong>areas outside the new town areas, a lower plot ratio is adopted. Thesealso applf to C/R areas above.Residential 2 is a medium density residential planned use. For new townareas, population densities may be around 1050 persons per hectare f witha plot ratio of 5.0. For rural townships and new <strong>development</strong> areasoutside the new town areas, a lower plot ratio is adopted.Residential 3 is a medium to low density residential planned use. Forsew town areas, population densities may be around 470 persons perhectare, with a maximum plot ratio of 3.0. For rural townships and newdevelopneiit areas outside new town areas, a lower plot ratio is adopted.Residential 4 is a low density residential planned use. Buildingheight is restricted to no more than 2 storeys with a maximum plot ratioof 0.4,Village Housing generally covers old village housing, new extensionsthereto and new village resite housing. Each new village house site islimited to a maximum of 65.03 square metres, and a height of 3 storeys,Housing authority Rental Estates are comprehensively planned estateswith gross population densities of around 2700 persons per hectare*IDS / cover estates built under the Home Ownership Scheme or thePrivate ^Sector Participation Scheme. Generally densities and plot ratiosare similar to those found in Residential 1 or residential 2 <strong>development</strong>s{see above}.Housing Society Estates are similar in <strong>development</strong> characteristics tolousing Authority Rental Estates described above*CoBBonity Facilities include facilities provided by Government or theprivate sector for the welfare of the community such as schools,hospitals, clinics, police and fire stations.5.04


Govennsent Residential Institutions and DepartneHtal Quarters includefacilities which provide residential accommodation such as prisons,nurses homes and training schools, as well as staff quarters attached toparticular government land uses.Other GIC Facilities cover those facilities generally provided byGovernment but not included above, such as ferry piers, depots, servicereservoirs, sewage treatment plants and pumping stations.Local Open Space is open space provided for the use of residents orworkers in the immediate vicinity. The area of LOS is included in thegross area of the adjoining planned uses.District Open Space is open space generally of more than localsignificance and may be used for either passive or active recreation..The gross site area of DOS covers the entire site, while the net site arearefers to the "usable area 8 as defined by the HKPSG.Roads & KCR/MTR/LRT is the land set aside for roads or the KCR, MTR orLRT. Where these uses are on elevated structures the land use underneaththat structure is counted in this Part,Other Specified Uses include land made available for other specificuses not covered above, such as cargo handling facilities, bus depots,petrol filling stations, MTR ventilation shafts, telephone exchanges, andslaughter houses. Because of their nature, these uses are specificallyannotated on town plans.Undetermined generally refers to land for which no specific use has beenallocated to date.4.0 Land a¥ailability in Rmral Yuen Long District4.1 There are a large number of proposed projects within the Rural YuenLong District as indicated in the MINT Section of Part 6. Sites will beformed for these projects. Information on land availability can beobtained from Project Manager/NWNT, NWNT Development Office.5*0 Further information5.1 Further information regarding specific sites is available from theProject Manager/NWNT, NWNT Development Office.5.05


Area of Ko*' <strong>tin</strong>nedIndustrialf,,jn


Area of ServicedLand (hectares)!' tanned LandUse91/92Totalup to31-3-92LandStillAvail92/9393/9494/9595/9696/9797/9898/9999/0000/0101/02LaterTOTALIndustrial "0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00INDUSTRIAL SUBTOTAL0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00CommercialCommercial /ResidentialResidential 1Residential 2Residential 3Residential 4Village Housing0.000.000.000.000.000.000.000,005.1042.860.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000,000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.005.1042.860.000.000.000.00RESIDENTIAL / COM'L SUBTOTAL0.0047.960.000.000.000.000.000.000.000.000.000.000.000.0047.96Housing Authority Rental EstHOS/PSPSHousing Society Estates0.000.000.0028.138.360.006.650.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.0028.138.360.00PUBLIC HOUSING SUBTOTAL0.0036.496.650.000.000.000.000.000.000.000.000.000.000.0036.49Community FacilitiesGovt Instit'ns & Deptl QtrsOther GIC Facilities0.470.003.7028.040.008.027.340.001.310.000.000.000.980.000.000.800.000.570.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.0029.820.008.59GIC FACILITIES SUBTOTAL4.1736.068.650.000.981.370.000.000.000.000.000.000.000.0038.41District Open SpaceRoads & KCR/HTR/LRTOther Specified UsesUndetermined Uses0.4311.210.00229.4415.5338.7632.58232.728.07a. 133.39232.720.000.000.2814.320.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00' 0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.0015.5338.7632.86247.04OTHER USES SUBTOTAL241.08319.59252.3114.600.000.000.000.000.000.000.000.000.000.00334.19TOTAL245.25440.10267.6114.600.981.370.000.000.000.000.000.000.000.00457.05Note: 'Land Still Avail' refers to land made available in previous years and not sold or allocated at 31-3-92SERVICE!) LAND AVAILABLE SUMMARY GROSS AREAS Tin Shui WaiPART 5A(1)


or serviced Land(hectares)i 1 1 -inned UnaIndustrialIHDIISTHIA1.I SUBTOTALUseCommercia]nomine r


Area of Serviced Land (hectares)Planned Land Use91/92Totalup to31-3-92LandStillAvail92/9393/9494/9595/9696/9"?97/9898/9999/0000/0101/02LaterTOTALIndustrial0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00INDUSTRIAL SUBTOTAL0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00CommercialCommercial /ResidentialResidential 1Residential 2Residential 3Residential 4Village Housing0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.860.000.005.680.000.000.002.170.000.00l.u0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.003.030.000.006.790.000.00RESIDENTIAL / COH'L SUBTOTAL0.000.000.000.000.000.000.000.000.000.006.543.280.000.009.82Housing Authority Rental Estt?OSPSPS0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00PUBLIC HOUSING SUBTOTAL •0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00Community FacilitiesGovt Instit'ns & Deptl QtrsOther GIC Facilities0.000.000.001.010.000.000.000.000.000.000.000.000.040.000.000,000.000.000.020.000.001.150.000.000.000.000.000.000.000.000.130.000.320.040.000.000.000.000.000.000.000.002.390.000.32GIC FACILITIES SUBTOTAL0.001. 010.000,000.040.000.021.150.000.000.450.040.000.002.71District Open SpaceRoads & KCR/MTR/LRTOther Specified -UsesUndetermined Uses0.000.000.000.000.000.004.3.10.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.002.690.001.410.000.001.350.340.000.000.000.000.000.000.000.000.002.691.356.080.00OTHER USES SUBTOTAL0.004.330.000.000.000.000.000.000.000.004.101.690.000.0010.12TOTAL0.005.340.000.000.040.000.021.150.000 . 0011.095.010.00o.oo22.65Note: 'Land Still Avail' refern to land made available? in previous years and not sold or allocated at 31-3-92SERVICED LAND AVAILABLE • SUMMARY GROSS AREAS L.aii F.m ShanPART 5A(1)


Area of Serviced Land (hectares)Planned Land Use91/92Totalup to31-3-92LandStillAvail92/9393/9494/9595/9696/9797/9898/9999/0000/0101/02LaterTOTALIndustrial0.6373.050.871.170.400.000.000.003.050.000 . Of)0 . 000 . 000 . 0077.67INDUSTRIAL SUBTOTAL0.6373.050.873 ,170.400.000.000.003.050.000.000 . 000 . 000 . 0077.67CommercialComme re i a 1 / Res idon t i a 1Residential 1Residential 2Residential 3Residential 4Village Housing0.000 . 000,000.000.000.000.001.3218.427.200,000.000.0084.980.000.000.000.000.000.000.000.7310.600.4512.770.000.000.000.000.000.000.980.000.000.000.000.000.000.850.000.000.000.000.000.000.000.000.000.000 . 000.000.000.000.000.000.000 . 000.000.000.000.000.004.290.000.000.000,000.000.000.000.000 . 000.005.500.000.000.000.00o.oo0.0013.160 . 000.000.000 . 000 . 000 . 000.000.000.000.000.000 . 000 . 000.000.000 . 000.00l.flS29.027 . 6533.260.000.0089. :nRESIDENTIAL / COM 'I, SUBTOTAL0.00111.720.0024.550.980.850.000.004.290.005.5013.160.000.00161.05Housing Authority Rental EstHOS/PSPSHousing Society Estates0.000.000.0036.100.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.004.755.440.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.0020 . as5.440.0001j__JoPUBLIC HOUSING SUBTOTALCommunity FacilitiesGovt Instit'ns & Deptl QtrsOther GIC Facilities0.000.000.000.0016.1023.541.088.820.000.170.010.000.002.480.001.130.000.590.000.000.000.600.000.450.001.460.000.0010.194.990.000.000.000.780.010.000.001.720.000.000.003.170.000.600.000.000.000.000.000.000.000.000.000.000.000.0026.2939.331.0911 .00GIC FACILITIES SUBTOTAL0.0033.440.183.610.591.051.464.990.791.723.770.000.000.0051.42District Open SpaceLocal Open SpaceRoads & KCR/MTR/LRTOther Specified UsesUndetermined Uses0.000.000.000.000.007.429.S522.808.810.000.001.490.000.000.000.000.460.000.090.000.000.00* 0.000.000.004.370.0014.860.000.0030.680.940.000.000.000.000.000.000.000.000.001.070.000.020.000.000.000.000.000.000.000.002.510.000.000.000.004.110.160.000.000.000.000.000.000.000.000.460.000.0042.4712.3244.749.080.00OTHER USES SUBTOTAL0.0048.881.490.550.0019.2331.620.001.090.002.514.270.000.46108.61TOTAL 0.63 283.19 2.54 29.88 1.97 21.13 33.08 15.18 9.22 1.72 11.78 17.43 0.00 0.46 425.04Note: 'Land Still Avail* refers to land made available in previous years and not sold or allocated at 31-3-92SERVICED LAND AVAILABLE SUMMARY NET AREAS Yuen Long


Area of Serviced Land (hectares)Planned Land Use91/92Totalup to31-3-92LandStillAvail92/9393/9494/9595/9696/9797/9898/9999/0000/0101/02LaterTOTALIndustrial0,000.000.000.000.000.000.000.000.000.000.000.000.000.000.00INDUSTRIAL SUBTOTAL0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00CommercialCommercial /ResidentialResidential 1Residential 2Reeidential 3Residential 4Village Housing0.000.000.000.000.000.000.000.002.7930.430.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.002.7930.430.000.000.000:00RESIDENTIAL./ COM'L SUBTOTAL0.0033.220.000.000.000.000.000.000.000.000.000.000.000.0033.22Housing Authority Rental EstHOS/PSPSHousing Society Estates0.000.000.0023.898.200.004.750.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.0023.898.200.00PUBLIC HOUSINGSUBTOTAL0.0032.094.750.000.000.000.000.000.000.000.000.000.000.0032.09Community FacilitiesGovt Instit'ns & Deptl QtrsOther QIC Facilities0.260.002.7418.650.005.624.660.000.970.000.000.000.450.000.000.350.000.420.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.0019.450.006.04GIC FACILITIES SUBTOTALDistrict. Open SpaceLocal Open SpaceRoads & KCR/MTR/LRTOther Specified UnenUndetermined Uses3.000.430.0011.210.00227.8524.2715.536.3338.7631.86229.625.638.074.688.133.07229.620.000.001.730.000.219.730.450.000.000.000.000.000.770.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000,000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000,000.0025.4915.538.0638.7632.07239.35OTHER USES SUBTOTAL230.49322.10253.5711.670.000.000.000.000.000 . 000.000.000.000.00333.77TOTAL242.49411.68263.9511.670.450.770.000 . 000.000.000.000 . 000 . 000.00424.57Note: 'Land Still Avail 1 rofnrs to land raadn available in previous years and not sold or all oca tod at 31 3 92SERVICED LAND AVAILABLE SUMMARY NET AREAS Tin Shtii WaiPART 5A(2)


A i e n o I S


Area of Serviced Land (hectares)Planned Land Use91/92Totalup to31-3-92LandStillAvail92/9393/9494/9595/9696/9797/9898/9999/0000/01OL/02LaterTOTALIndustrial0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00INDUSTRIAL SUBTOTAL0.000.000.000.000.000.000.000,000.000.000.000.000.000.000.00CommercialCommercial/ResidentialResidential 1Residential 2Residential 3Residential 4Village Housing0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.460.000.003.030.000.000.000.990.000.000.510.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00.0.001.450.000.003.540.000.00RESIDENTIAL / COH'L SUBTOTAL0.000.000.000.000.000.000.000.000.000.003.491.500.000.004.99Housing Authority Rental EstHOSPSPS0.000.000,000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00PUBLIC HOUSING SUBTOTAL0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00tnM U)Community FacilitiesGovt Instit'ns & Deptl QtrsOther GIC Facilities0.000.000.000.620.000.000.000.000.000.000.000.000.020.000.000.000.000.000.0]0.000.000.590.000.000.000.000.000.000.000.000.070.000.140.020.000.000.000.000.000.000.000.001.330.000.14GIC FACILITIES SUBTOTAL0.000.620.000.000.020.000.010.590.000.000.210.020.000.001.47District Open SpaceLoral Open SpaceRoads & KCR/HTR/LRTOther Specified UsesUndetermined Uses0.000.000.000.000.000.000.030.004.260.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.001.920.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.002.570.000.001 . 3 .10.000.000.001.350.340.000.000.000.000.000.000.000.000.000.000.002.571.951.355.930.00OTHER USES SUBTOTAL0.004.290.000.000.000.001.920.000.000.003.901.690.000.0011.80TOTAL 0.00 4.91 0.00 0.02 0.00 1.93 0.00 0.00 7.60 0.00 18.26Note: 'Land StilJ Avail* refers to land made available in previous years and not nold or allocated at 31-3-92SERVICED LAND AVAILABLE SUMMARY NET AREAS Lau Fau ShanPART 5A(2)


NORTH WEST NEW TERRITORIES DEVELOPMENT OFFICETIN SHUI WAI/YUEN LONG DEVELOPMENT PROGRAMME1993 EDITIONPART 6 - BAR CHARTS-CONTENTS1. YUEN LONG DEVELOPMENT2. TIN SHUI WAI DEVELOPMENT3. NORTH WESTERN NEW TERRITORIES DEVELOPMENT4. KEY TO PART 66 - 80NOTE : - In general, projects have been updated to February 1993.Further details may be obtained from the North Vest NewTerritoriesDevelopment Office.6. 1


ItemNo.&Cat.PolicySec.&AgencyHead&RPIS(Y/NDescriptionPACKAGE 3Areas KPart), 2, 6(Part) & 11(Part)Expenditure $MCurrent Up toEstimate 31/3/921992/931993/94 1994/951995/961996/971997/98Programme tentative over this period1998/99 1999/00 2000/01 2001/02Later/Cent.RemarksCIVIL ENGINEERING1Q5CLAYuen Long <strong>development</strong>, package3, engineering worksSPELTOD707707NCompleted WorksFormation of GIG site north ofYuen Long western roundabout35.551.6535.550.501.15SPELTDD707NLandscaping and mi see I laneous1.310.920.030.36Planning areas 1,2,3 and 6Consultancy Fees4.554.420.020.040.050.02HIGHWAYS707Conpleted Projects33.1833.18058TBYuen Long <strong>development</strong>, LongPing footbridge extensionacross On N ing Road and Castleeak Roadfor TX)707Nridge L extension37.4913.4513.1310.91for T>D707Nandscaping and miscellaneousworks4.182.102.08onsultancy Fees4.001.501.301.20Yuen LongPao^cagre 3Part 6Page 6,2


ItemNo.&Cat.PolicySec.&AgencyHead&RPIS(Y/N)DescriptionExpenditure $MCurrent up toEstimate 31/3/921992/931993/941994/951995/961996/971997/98Programme tentative over this period1998/991999/002000/01 2001/02 Later/Cent.RemarksHIGHWAYS(cont'd)Q59TBANullah bridge at Ha Nui Roadand Ping Wui Street, Yuen LongS for TTDD707NBridgeworks and road works -NTDB 23/8512.5212.250.120.15S for TTDD707NLandscaping and miscellaneousworks0.660.330.33Consultancy Fees2.322.290.03COMMUNITY FACILITIES703Completed Projects37.5037.50707Completed Projects48.0348.03061EPEMrchSD707N> rfmary school, package 3,Yuen Long33.5010.0017.506.00Site reserved at Kin Tak St.255RO.oca I Open space at On HingRoad, Yuen Long707Completed Works3.143.14RSrchSD707NOt hers/Cont i ngenc i es0.260.26033RSuen Long swimming pool andgarden707onpleted Works35.4435.44RSrchSD707Nthers/Cont i ngenci es5.085.08Yuen LongPackage 3Part 6Page 6.3


ItemNo.&Cat.PolicySec.&AgencyHead&RPIS(Y/NDescriptionCOMMUNITY FACILITIES(cont'd)Expenditure $MCurrent Up toEstimate 31/3/921992/931993/941994/951995/961996/971997/98Programme tentative over this period1998/991999/002000/01 2001/02 Cent.Later/RC LEISURE SERVICES097LSILocal open space, package 3,phase II, Yuen LongRCTDDRCTDDRCNRCNLocal open space, package 3,phase II, Yuen LongOn costsPackage Total5.750.92307.035.660.90219.610.090.020.260.1815.6622.4115.3910.0217.506.00Regional Council project.Project cost only. The 12-month Establishment Period wasincluded in the contractperiod.Recurrent vote. Cost to berecovered form RC CV/PYuen LongPackage 3Part 6Page 6.4


ItemNo.&Cat,Pol feySec.&AgencyHead&RPIS(Y/N)DescriptionExpenditure $HCurrent Up toEstimate 31/3/921992/931993/941994/951995/96 1996/97Programme tentative over this period1997/98 1998/99 1999/00 20)0/01 2001/02 Later/Cont.RemarksPACKAGE 4Areas 4


ItemNo.&Cat.PolicySec.&AgencyHead&RPIS(Y/NDescriptionExpendi ture $MCurrent Up toEstimate 31/3/921992/93 1993/94 1994/95 1995/961996/97Programme tentative over this period1997/98 1998/99 1999/00 2000/01 2001/02 Later/Cont.RerorksCOMMUNITY FACILITIES707Conpleted Projects4.624.62026KAAMarket, library, squash courtsand office at Tai Kiu, YuenLong Town707Conpleted Works47.9147.91DRSArchSO707NOthers/Cont i ngenc i es7.297.29020RMAReprovisioning of Hop Yick>rivate market and Yuen Longhawker bazaar707Completed Works27.2727.27RSArchSD707NOthers/con<strong>tin</strong>gencies1.481.48250ROuen Long Town Square707ample ted Works2.932.93RSrchSO707NOthers/Con<strong>tin</strong>gencies0.070.07Yuen LongPacrJcagre 4Part 6Page 6.6


ItemNo.&Cat.Pol icySec.AgencyHead&RPISCY/N)DescriptionExpenditure $MCurrent up toEstimate 31/3/921992/931993/941994/951995/961996/97Programme tentative over this period1997/98 1998/99 1999/00 2000/01 2001/02 Later/Cent.RemarksRC LEISURE SERVICES098LSLocal open space, package 4,Dhase II, Yuen LongRCTDDRCNLocal open space, package 4,phase II, Yuen Long2.041.880.16Regional Council project.Project cost only. The 12-month Estate 1 ishment Period wasincluded in the contractperiod.RCTDDRCNOn costs0.320.300.02Recurrent vote. Cost to berecovered from RC CW*Package Total155.22142.630.820.332.088.840.52Long Part 64


ItemNo.&Cat.PolicySec.&AgencyHead&RP1S(Y/NDescriptionExpenditure $MCurrent Up toEstimate 31/3/921992/931993/941994/951995/961996/971997/98Programme tentative over this period1998/99Later/1999/00 2000/01 2001/02 Cont.RemarksPACKAGE 5Areas 1(Part), 4(Part),9(Part), 10(Part) & 11(Part>CIVIL ENGINEERING108CLAYuen Long <strong>development</strong>, package5, engineering works707Completed Works46.6546.65SPELTDD707NTai Kiu Village - includingformation for school site8.402.005.001.40SPELTDD707HLandscaping and miscellaneous2.001.680.020.030.27Consultancy Fees6.605.870.100.150.200.150.13HIGHWAYS108THYuen Long northern bypass,grade separation of easternunction707Completed Works33.4533.45for TDD707Nandscaping and miscellaneousworks1.551.310.050.020.17Yuen LangPaoJcagre 5Part 6Page 6.8


I tanNo.&Cat.Pot icySec.£AgencyHead&RP1S(Y/N)DescriptionExpenditure $MCurrent Up toEstimate 31/3/921992/931993/941994/951995/961996/97Programme tentative over this period1997/98 1998/99 1999/00 2000/01 2001/02 Cont.Later/RemarksCOMMUNITY FACILITIES707Completed Projects44.2744.27063EPA^rimary school, package 5,Yuen Long707Completed Works14.5514.55SEMArehSD707NOther/cont 1 ngenc i es0.750.75026MCAClinic, package 5, Yuen LongSHWArchSO707NClinic, package 5, Yuen Long31.4231.230.19SHUArehSD707NOthers/cent i ngenci es0.780.78RC LEISURE SERVICES105LSHILocal open space, package 5 -remainder, Yuen LongRCRSDRCNLocal 5 -remainder, Yuen Long4.351.172.920.26Priority 'medium 1RCRSDRCHOn0.700.250.150.260.%Recurrent vote cost to berecovered form RC CW>YuenPa566.9


Item Policy HoodNo, See, &RP1S .Cat,a/»>CurrwiUp to31/3/9?1995/91996/91997/91PriK|t*fli!fifc? t*f»t«tivr» «wr this period1999/00 HOOO/01 Cant,ftenvtrksRC IflSURt ..SjLRVKtS[(mnr'd)169LSIMoral c^peri spac^, 5»YuoiRCTDDRC Local 5,N Yuen11.210.530.340,3Regior«l Coiricil project.Project cost orily. The 12-month Establishment Period wasincluded in the ccntractperiod.ITODRC |0n1.801.680.06O.CWRecurrent vote. Cost to berecovered from RC CWP[Package Total208.53191.220.660.75 1.866.865.501.55 0.13Yuen Long Part 6


ItemNo.&Cat.PolicySec.&AgencyHead&RPIS(Y/N)DescriptionExpenditure $MCurrent Up toEstimate 31/3/921992/931993/941994/951995/961996/971997/98Programme tentative over this period1998/99 1999/00 20)0/01 2001/02 Later/Cont.RerorksPACKAGE 6Areas 3{Part) & 6{Part)CIVIL ENGINEERING109CLAYuen Long <strong>development</strong>, package6, engineering works707Conpleted Works63.0463.04SPELTDD707NLandscaping and miscellaneous2.222.060.100.06Q29DSASPELDSD707NYuen Long full sewagetreatment plant210.00174.98m8.805.5020.72COMMUNITY FACILITIES004CEIVDRSArchSD703HYuen Long Civic Centre,package 6, Yuen Long263.0040.00100.00110. (X)13.00057EPAPrimary school , package 6,Yuen Long707Conpleted Works15. (515.05SENArchSD707NOther/cont i ngenc i es1.351.35081ESASecondary school, package 6,Yuen LongSEMArchSD707NSecondary school, package 6,Yuen Long32.6530.411.980.26SEMArchSO707NOther/cont i genci es4.554.55Yuen LongPackage 6Part e6,11


ItemNo.&Cat,PrU irv/ r wt, itySec,&AgencytJMiviHeao&RPISCY/HDescriptionExpend itUf'6 $HCurrent Up toEstimate 31/3/921992/931993/94iooy /G*» 1W4/V31QQK/QAjyy^/yo1996/97I 77v/ 71,_..-—.___-——--—P rogramme tentative over this period——•Later/19977981998/99 ___ 1999/00 2000/01 2001/02 Cont.—— -— .„——««.«~^«.--«~-— — - ~Reireirks(eon^d)QB2ESASB!ArehSDSE«ArchSO707N707NOnesecondary school,6, Yuen LongOne secondary school,6 f YuenOthers/cont f ngenc i es22.571.4321.830.741.43156ROADRSTDDDRSTDD707707N707NLocal open space, package 6,Yuen LongCompleted WorksLocal open space, package 6 fYuen Long - contract paymentMiscel laneousConsultancy Fees0.064.810.380.660.064.620.010.410.180.020.210.010.010.040.34157ROuen Long Town ParkRSDDRSDDRSDD707N707N707Nuen Long town park - contractpayment.etter of intent issuedi seel laneousconsultancy Fees44.200.324.535.4542.400.260.064.501.600.060.020.720.200.150.204.300.03Vim? i LanaPart: 6P&gft 6. 12


ItemNo.&Cat.PolicySec.&AgencyHeadRPIS ^CY/N)DescriptionExpenditure $MCurrent Up toEstimate 31/3/921992/931993/941994/951996/961996/971997/98Programme tentative over this period1998/99 1999/002000/01 2001/02 Cent.Later/RemarksRC LEISURE SERVICES096LSIIIRCArchSDRCNIndoor recreation centre (typeC), package 6 f Yuen Long57.883.3022.0030.002.58Requirement for indoorrecreation centres across theterritories under reviewPackage Total734.15359.6914.436.3773.24124.84140.0015.58Yuen6Part 6Page 6.13


It«rWo,&CatPolitySee,&AgencyHeauI&RPISCY/N )77riptiofitxpmdi tut** $M€un '&[11Cs<strong>tin</strong>«tUp to1W ?/V 1993/94iw,1W/9WJiv;a/w1W9/00* ovrr thi7001ARi «tet7,..,*.107CLAYuen <strong>long</strong>7, a^jneering works707Completed Morks57.4657.46SPiLTOO707HLandscaping and mf scei laneous2.522.380.1403WWJITY FACILITIES246ROALocal open space, site No, 1,package 7 e Yuen Long707Completed Works4.154.15mrchSD707yOthers/Cent I ngenci es0.450.45RC ENVIRONMENTAL HYGIENEIVchSOcyCooked food centre in package7» Yuen Long6.514.401.600.51yuan Long Part 6Package 7Page 6. u


ItemNo,&Cat.PolicySec.&AgencyHead&RPIS(Y/N)DescriptionExpenditure $MCurrent Up toEstimate 31/3/921992/931993/94 1994/95 1995/961996/97Programme tentative over this period1997/98 1998/991999/0 2000/0 2001/0Later/Cont.RemarksRC LEISURE SERVICES168LSI.oca 1 open space, package 7,Yuen LongRCTDDRCN.ocai open space, package 7,Yuen Long4.844.460.38Regional Council project.Project cost only. The 12-month Establishment Period wasincluded in the contractperiod.RCTDDRCNOn costs0.780.720.06Recurrent vote. Cost to berecovered from RC CW*N.I.RCTDDRCHLocal open space, package 7,iiase III, Yuen LongPUP No.NOSLS. Formerly part ofPWP item 281RO. RegionalCouncil project. Not yet in RCCWP.N.I.IVRCTDDRCNLocal open space, package 7 -remainder, Yuen LongRegional Council project. Notyet in RC CW.Package Total76.7169.170.440.594.401.60 0.517Part 66.15


I torNO.i.PolicyS«u&HeadRP1SCY/N >81 expenditure $MDescription L____ r_ .Current Up to31/3/928 rI1992/91993/91994/951995/96 1996/97Programme tentative over this period1997/98 1998/99 1999/00 2000/01 2001/02 Cont.Later/RemarksCIVll111CLAYuen <strong>long</strong> <strong>development</strong>.8, engineering works, I*707Computed Works25.4425.4SPELTDD707NSite formation, access roadsand main drainage - 640/8039.137.20.260.301.40Consultancy Fees8,007.960.04040TBAYuen Long <strong>development</strong>, package8 - pedestrian and cyclebridge707Computed Works0.200.20for TDD707yBridge works NTDB 14/8410.7010.110.100.250.24Consultancy Fees1,401,350.05061TSAPedestrian and cycle bric^e,Long Ping - Yeung Ukfor TDOfor TDD707NEngineering works - YL19/89(part)707 I.andscaping and miscellaneousN i4orks21.843.0020.340.331.140.20••••0.360.462.01£ 'Consultancy Fees4.163.420.660.08Yuen LongPactfcagre.Pajrt 6


ItemNo.&Cat.Pol IcySec.&AgencyHead&RPISCY/N)DescriptionExpenditure $MCurrent Up toEstimate 31/3/921992/931993/941994/951995/961996/97Programme tentative over this period1997/98 1998/99 1999/00 2000/01 2001/02 Later/Cont.RemarksCOMMUNITY FACILITIES707Completed Projects57.2357.23Atwo standard primary schoolsin Long Ping Estate, Yuen Long801HD707NTwo standard primary schoolsin Long Ping Estate, Yuen Long18.3418.290.05SENHD707NOthers/eont i ngenci es0.360.36A$mHO707H^imary school in Shui PinWai, Yuen LongPrimary school in- Shui PinWai, Yuen LongPUBLIC HOUSINGHACompleted Projects619.48619.48Package Total809.31801.352.411.543.650.368Part 6Pag« 6.17


I tun j Policy««. €tc.cit *H*«c&


ItemNo.&Cat.Pol feySec.&AgencyHead&RPISCY/N)DescriptionExpenditure $MCurrent Up toEstimate 31/3/921992/931993/941994/951995/961996/971997/98Programme tentative over this period1998/991999/002000/01 2001/02 Later/Cont.RemarksHIGHWAYS084TBPedestrian and cycle bridge.Yuen Long, Phase I707Conpleted Works0.150.15for TDD707NBridge % P«3.603.030.100.120.35Consultancy Fees0.450.420.03177THfor Tyo707Nmprovements to Yuen Longnullah bunds, stage III16.3515.890.010.45COMMUNITY FACILITIESN.I.SEMArchSD707NPrimary school, area 12, YuenLong33.5013.0015.005.50RC LEISURE SERVICES005LSIVRCArchSDRCNDistrict games complex anddistrict open space, area 12,Yuen Long81.768.8029.6430.0010.003.32159LSIVRCHDRCNIndoor recreation centre typeC, Yuen Long east estate, YuenLong57.883.30 22.00 30. 00WMfflmmmmiiimimimimm2.58The requi refnent for indoorrecreation centres across theterritories is uider reviewPackage Total505.20102.2936.1111.5829.2962.9188.53 97.69 65.4011.409Part 6Page 6.19


!No*: &Cat.Pol icySec,&AgencyHfMid&RP1SCY/NDescriptionEx^nditure SMCurrent Up toEs<strong>tin</strong>ete 31/3/92 1992/93 1993/941994/951995/961996/971997/98Programme tentative over this period1998/99 1999/00 2QQQ/Q1 2001/02Later/Cont.R«i«jrksAREA 1610BSP€LTDDSPELTDD•jtvyN7fyyHKau Hui <strong>development</strong> -engineering works, area 16,Yuen LongSit0 fonwitiondralnaee worksro0cf$ sidLsndscflptns &nd (nisccllsnousworksComultancy Fees100.483.648.505.170.310.5024.531.042.7536.341.043.2525.050.732.009.390.52M.I,IVRCTDDRCHDistrict open space, Kau Hui,Yuen LongPackage Total, ,^m112.625.9828.3240.6327.789.91Regional Comcil Project. Notyet in RCCWP.Yuen LongPae/tagre 1OE>J3 *~y~ £>


ItemNo.Cat,Pol icySec,AgencyHeadRPIS(Y/N)DescriptionExpenditure $MCurrent Up toEstimate 31/3/92 1992/93 1993/94 1994/95 1995/96 1996/97Programme tentative over this period1997/98 1998/99 1999/00 2000/01 2001/02Later/Cent.RemarksPACKAGE 11AREA 14CIVIL ENGINEERING027CGCYuen Long south easternextension - site formation,roads and drainage worksSPELTDD707NYuen Long south easternextension - site formation.road and drainage works272.0041.0075. 0075.0041. 0040.00SPELTDD707NLandscaping and miscellanousworks16.503.303.303.303.303.30Consultancy Fees34.504.108.707.707.706.30COMMUNITY FACILITIESM.I.N.I.SEMArchSO3mArehSD707N707NPrimary school in Yuen Longsouth eastern extensionSecondary school in Yuen Longsouth eastern extension33.5043. 0014. 0012.0014.0020.00mm4.009.001.502.00PUP NO.N04EPPWP NO.N01ESH.I.SHAArehSD707NNeighbourhood cornmnity centrein Yuen Long south easternextension38.0012.a)ll8.006.002.00PWP NO.N03SCN.I.-SHAArehSD707NSheltered workshop in YuenLong south extension16.006,00 8.002.00PWP NO.N04SC16


I ten» Pol icyNo* S


ItemUrt NQ«&Cat.Pol feye»«if»i>ec»&AgencyHead0RPISCY/N)DescriptionExpendiifrure $MCurrent Up toEstimate 31/3/92 1992/93 1993/94 1994/95 1995/961996/971997/98F'rogrammetentattv€ » over thi s period1998/991999/002000/012001/02 Later/Cent.RonrurksPACKAGE 12AREA 13CIVIL ENGINEERING028CGBYuen Long south westernextension - site formation,roads and drainage worksSPELDD707NYuen Long south westernextension - site formation,roads and drainage works190.0510.4046.3745.8545.3334.887.22SPELTDD707NLandscaping and miscellaneousworks8.311.041.562.082.081.55Consultancy Fees19.504.504.504.504.501.50COMNRJNITY FACILITIESN.I.SEMArchSO707NPrimary school in Yuen Longsouth western extension33.5014.0014.004.001.50PWP No.N05EPN.I.N.I.SENArchSDSHAArchSD707N707NSecondary school in Yuen Longsouth western extensionNeighbourhood community centrein Yuen Long south westernextension43.0038.0012.0012.0020.0018.009.006.002.002.00pyp No.N02£Spyp No.N05SCYuen Long12Part 6Page 6,23


ItemNo,&Cat,PolicySec.&&RP1SCY/N )DescriptionFxpnviitun* $HCUT rr»ntP*i<strong>tin</strong>wtUp to31/5/V? lV9?/9 1993/941996/97P r -ogr w mic t en tft t i vi* over this period1997/96 1^8/99 1999/00 2000/01 2001 /CWInter/(*ont »RrirtirksRC in aim SPRVICFSN.I.RCArcWSJRCIndoor recreation centre inYuw Long south west enextension58.0025.0025,008.00IW Mo.NHlSM.I.District and local openspaces, south westernextension, Yuen LongRCTDDRCNLocalsouthwestern extension, Yuen LongPWP Mo.NIZLS. Regional Coifu:ilproject. Not yet in RC CWP.RCTDDRCNDistrict open space, southwestern extension, Yuen LongPW> No.N12LS. Regional Cotrci IProject. Not yet in RC GWP.Package Total390.3610.4051.91114.91128.9168.4615.77yuanPart 612


ItemNo.&Cat.Pot feySec.&AgencyHead&RPIS(Y/N)DescriptionExpenditure $HCurrent Up toEstimate 31/3/921992/93 1993/94 1994/951995/96 1996/97Programme tentative over this period1997/98 1998/99 1999/00 2000/01 2001/02 Later/Cont.RenerksPACKAGE 1tester <strong>development</strong> plan forTin Shui Waf <strong>development</strong> andsite investigationCIVIL ENGINEERING707Completed Projects10.0010.00Package Total10.0010.00WaiPa166.25


It«TNo&CatPol feySec.&AgencyBeaa&RP1CY/Expenditure $MDescription„,Current 14> toEstimat 31/3/92.. . - „2 1DCS i gn and Investigation1992/91993/91994/9&1995/961996/9Program*; tentative over this period1997/98 1998/99 1999/GQ 20QQ/Q1 2001/0? I atcr/Cent ,RcwnrksCIVIL121CATin Shu! Wai <strong>development</strong> -tesign and investigation707Coipleted Works119.69119.69SPELTOO707NSite investigationConsultancy Fees0.2810.840.053.090,120.540.10.352.502.302.06Future minor siteinvestigations130.81122.830.660.462.502302.06Tin Shu I W'ai


ItemNo*&Cat.Pol feySec.& "AgencyHead&RPISCY/N)Expendi ture $MCurrent Up toEs titrate 31/3/921992/931993/941994/951995/961996/97F»r0granroetentative» over thi s period1997/98 1998/99 1999/00 2000/01 2001/02Later/Cont.R©fB3rlcsQ2QCGA227CLBSPELTDDSPELTDDSPELTDDSPELTDDSPELTDDSPELTDDSPELTDOPACKAGE 3Preliminary engineering works.land formation & maindrainageCIVIL ENGINEERINGCompletion of Hung Tin Road707 Conpleted Works707 South-Western access road,N Contract No. NTDB 12/84707 Junction Hn39 improvementN707 'in Shui Wai west accessN707 MiscellaneousN707 Additional fund other thanN inflation, up to 31.3.92Consultancy FeesTin Shui Wai <strong>development</strong>,package 3, part II - villageflood protection works -remainder707 Village flood protection worksY - remainder707 Landscaping & miscellaneousY44.6125.569.85102.758.8820.0022.8821.382.1644.6122.976.579.89m2.598.819.120.102.301.0429.540.102.7028.466.602.701.590.1626.101.056.602.709.100.929.531.266.602.597.170.723.520.36Couplet ed.Contract No. YL 22/90.Dualling of SW access rood andJunction D2/T2/D3. ContractNo. YL 25/91.Ha Mei San Tsuen and SheungCheung Wai.3Part 6Page 6.27


ItemNo.&Cat.PolicySec.&AgencyHead&RPIS


ItemNo.&Cat.PolicySec,&AgencyHead&RPISCY/N)DescriptionExpenditure $MCurrent Up toEstimate 31/3/921992/931993/941994/951995/961996/97Prograome tentative over this period1997/98 1998/99 1999/00 2000/01 2001/02Later/Cent.RenerksCIVIL ENGINEERING(cont'd)298CLTin Shui Wai <strong>development</strong>,package 3, part II, land: ormation and main drainage -nitial <strong>development</strong> zonePELDD707KTin Shui Wai <strong>development</strong>package 3, part II - landformation and main drainage -nitial <strong>development</strong> zone -contract payment966.25850-7826.0066.005.0037.560.91Contract No.NTDB 33/85SPELTOO707NMiscellaneous3,761.321.000.500.500.44Contract No.NTDB 33/85SPELTOO707NAdditional fund other thaninflation, up to 31.3.9242.0)1.001.0040.00Consultancy Fees57.9948.294.652.501.501.000.05312CLATin Shui Wai <strong>development</strong>,package 3, part II, landformation and main drainage -land bank707Completed Works0.010.01SPELTOO707NTin Shui Wai <strong>development</strong>package 3, part 11 - landformation and main drainage -land bank - contract payment248.09231.741,220.0515.08Contract No.NTDB 33/85Consultancy10.218.680.900.400.100.13Tin3Part 6Page 6.29


N0»iCat,Pol IcySet:.&Agency&RPIS


ItemNo,&Cat.PolicySec.&AgencyHead&RPIS(Y/N)DescriptionExpenditure $MCurrent Up toEstimate 31/3/921992/931993/941994/951995/96 1996/97Programme tentative over this period1997/98 1998/99 1999/00 2000/01 2001/02 Later/Cent,RemarksPACKAGE 4Areas 1, 2 r 3 r 3A, 3B, 4, 5,8, 9, 10, 11, 13, 14(Part),21, 26, 34, 35CIVIL ENGINEERING327CLtTin Shut Wai <strong>development</strong> •roads D1 (west) and L9 andformation of LRT reserve,shase ISPELTDD707NTin Shui Wai <strong>development</strong> -roads D1 (west) and L9 andFormation of LRT reserve, phase[ (additional work)5.001.042.191.77SPELTDD707NRoads and drains96.1282.9310.982.21Contract YL9/88 .-Roads L9 & 01(west) & part of roads &drains in areas 1 & 2SPELTOO707NLetter of intent issued to HyO1,460.510.95Demolition of road limi<strong>tin</strong>gSPELTDD707NLetter of intent issued to WS)3.432.900.53Wa terms in diversionSPEtTDD707NLetter of intent issued to0.570.270.30SPELTDD707NHiscellaneous0.480.420.050.01SPELTDD707NAdditional fund other thaiinflation, up to 31.3,925.001.042.191.77Consultancy12.8211.611.100.11TinWai46Page 6.31


ItemNo.&Cat.PolicySec.AgencyHead&RPIS(Y/NDescriptionExpenditure $MCurrent Up toEstimate 31/3/921992/931993/941994/951995/961996/97Programme tentative over this period1997/98 1998/99 1999/00 2000/01 2001/02Later/Cent.CIVIL ENGINEERING(cont'd)334CLATin Shui Wai <strong>development</strong>,package 4, engineeringinfrastructure, phase IISPELTDD707NRoads & drains284.611ZLJ3 ^~J*T54.2524.4219.988.73Contract YL10/88 : roadsDUremairder), L1, L2, L3, L5and roads & drains in areas 4& 14(part>SPELTDD707NHAMiscellaneous7.161.191.372.502.10Consultancy Fees30.5420.675.502.102.100.17HIGHWAYSOthersHDNInfrastructure for Tin ShuiWai Area 13 and footbridgesbetween Areas 5/13 & 16/22"31.8010.0010.0011.80308CLITin Shui Wai <strong>development</strong>,package 4, engineeringnfrastructure - remainderSPELDD707Nnfrastructure in area 125.001.007.0017.00Project under reviewPELDD707Nnfrastructure in area 355. 001.008.0015.0024.007.00PELTDD707Nootbridge between Areas 1/315.005.0)ijteaasa8.002.00PELDD707N: ootbridge between Areas 3/515.005.008.002.00Tin Shui WaiPao/cagre 4Part 6Page 6.32


ftemNo,&Cat.Pol feySec.&AgencyHead&PISY/N)DescriptionExpenditure $HCurrent Up toEstimate 31/3/921992/931993/941994/951995/961996/97Programme tentative over this period1997/98 1998/99 1999/00 2000/01 2001/02Later/Cent.RemarksIGHWAYScont*d)308CLcont'd)in Shui Wai <strong>development</strong>,package 4, engineeringnf restructure - remainderPELDD707Nuatling of Road L522.006.0010.00mm6.00355CLin Shui Wai <strong>development</strong>.sackage 4, engineeringnfrastructure for Tin Shuiai Town Lot No. 1PELrivate707N707nfrastructure area 8 -engineering works30.4415.28m7.951.203.013.00T8WTL 1 including 301extens i onConsultancy Fees3.562.210.800.130.220.20368CL^SPELPrivateNTin Shui Wai <strong>development</strong>,saekage 4, engineeringinfrastructure for Tin ShuiWai Town Lot No. 2Infrastructure area 11 -engineering yorks15.457.060.903.743.75TSWTl 2 includingArea 26toConsultancy2,050,940.100.510.50Tin 66.33


!t«ttNo.&Cat ,PolitySec.&Held [&(Y/H)Description«„._,,Expeno iture $HCurrent Up toSstimate 31/3/921992/9! ! 1993/9«^1994/9J199S/9*1996/9Programs tentative over this period1997/9 1998/99 1999/0 2000/0 2001/02 Cont.Later/RemarksWATERWORKSAaid flushing waterreticulation forIE of Tin Shui Wai <strong>development</strong>(stores)3S for WWSD707 Fresh and flushing waterN reticulation forI of Tin Shui Wai <strong>development</strong>(part)35.4523.775.002.602.052.03S for WWSD707 juthers/Con<strong>tin</strong>genciesN0.250.25H.I.S for WWSD707 Yuen Long Water Supply - WangN diau Services Reservoir -Stage 1130.001.18 ill14.1914.63AS for WWSD709 Trunk main from Au Tau to YuenN Long and water supply to phaseI of Tin Shui Wai <strong>development</strong>35.0821.487.353.281.771,20CQf-WUNITY FACILITIESAS for SArehSD07 Sub-divisional fire stationW and antulance depot, area 4,Tin Shui Wai25.0016.710.871.416.01A\$mHDThree primary schools, area 5,Tin Shui Wai07 Three primary schools, area 5,H Tin Shui Wai74.3058,0010.704.001.60SiMHDSEMHD)7 Three primary schools, area 5,Tin Shui Wai -additional work707 Additional fund other thanN inflation, up to 31.3.9210.701.006.304.401.00Tin Shui Weti


ItemNo,&Cat.PolicySec.&AgencyHead&RPISCY/N)DescriptionExpenditure $MCurrent Up toEstimate 31/3/921992/931993/941994/951995/91996/9Programme tentative over this period1997/9 1998/99 1999/0 2000/0 2001/0Later/Cent.\ Remarks 1COMMUNITY FACILITIESCeont'd}133EPASEMArchSD707NPrimary school, area 8, TinShut Wai33.5027.440.561.054.45079ESASEMArchSD707NStandard secondary school inarea 11, Tin Shui Wai43.006.0017.50mm7.504.008.0)096ESASEMHD707NTwo secondary schools, area 5,Tin Shui Wai63.0023.9620.418.5110.12097ESASecondary school, area 8, TinShui WaiSEMArchSD707NSecondary school, area 8, TinShui Wai37.5231.42m4.501.60SENHD707NOthers/cent i ngenci es5.485.43122LPADivisional police station.area 4, Tin Shu! WaiS for SArchSD707NDivisional police station,area 4, Tin Shui Wai44.7739.77m4.530.47S for SArchSD707«0t hers/eont ! ngenc i es22.2322.23044WCASHWArchSD707NUrban clinic, area 26, TinShui Wai32.004.0112.586.458.%Tin Shui466.35


ItemNo.&Cat.PolicySec.&AgencyHead&RPIS(Y/NDescriptionExpenditure $HCurrent Up toEstimate 31/3/921992/931993/941994/951995/961996/97Programme tentative over this period1997/98 1998/99 1999/00 2000/01 2001/02Later/Cont.RemarksCQWUNITY FACILITIES(cont'd)082SCASHAHP707NEstate conmumity centre, TinYiu estate, area 5, Tin ShuiWai22.5016.731,641.512.62111SCASHWArchSD707NSocial welfare facility(children & youth centre),area 8, Tin Shui Wai15.007.13n4.830.952.09RC LEISURE SERVICES069LSIIIRCArchSDRCHIndoor recreation centre (typeC), area 2, Tin Shui Wai57.883.3022.0025.005.002.58149LSOpen space, area 3A, Tin ShuiWaiRCDDRCNOpen space, area 3A, Tin ShuiWai8.366.050.801.050.46Government funded projectCDORCNOn costs1.330.97mmm0.120.170.07150LSOpen space, area 9, Tin ShuiatCDDcDDRCNRCNOpen space, area 9, Tin ShuiaiDn costs4.280.042.991.290.04Entrustment Agreement signed,site handed to Entrustee on 10/12/1990. Current estimateadvised by Entrustee.TDD get 1% of 4 million oncosts f ran RSD for the dity oftheir Works Agent.Tin Shu± Wa±Package 4Part 6Page 6.36


ItemNo.&Cat.PolicySee.&AgencyHead&RPISCY/N)DescriptionExpenditure $MCurrent Up toEstimate 31/3/92 1992/931993/941994/951995/961996/97Programme tentative over this period1997/98 1998/99 1999/00 2000/01 2001/02 Later/Cont.RemarksRC LEISURE SERVICEScont'd)151LSrvOpen space, area 10, Tin ShuiaiCDDRCNOpen space, area 10, Tin Shuia!18.166.8110.900.45Regional Council project.Project cost onlyCDDRCNOn costs2.900.541.201.090.07Recurrent vote. Cost to berecovered from RC CW152LSIVOpen space, area 21, Tin ShuiWaiCDDRCNOpen space, area 21, Tin ShuiWai9.315.673.410.23Regional Council project.Project cost onlyRCTDDRCNOn costs1.490.250.600.580.06Recurrent vote. Cost to berecovered from RC CWP160LSin.oca I open space, area 1, TinShui WaiRCRSORCNlocal open space, area 1, TinShui Wai2.071.50mmffiaBHHd0.57RCRSDRCNOn costs0.330.160.110.050.01Recurrent vote cost to berecovered from RC CWP216L.SIVOpen space, area 34. Tin ShuiWaiRCTDDRCNOpen space, area 34, Tin ShuiWai2.592.00HHHB0.300.29Regional Council project. Tobe downgraded to RC minorworks item. Project cost onlyRCTDDRCNOn costs0.420.320.050.05Recurrent vote. Cost to berecovered f ram RC CypTin Shui4Part 6Page 6.37


ItemHo.&Cat.PolicySec.&AgencyHead&RPIS


ItemNo,&Cat,Pot feySec.&AgencyHead&RPISCY/N)DescriptionExpenditure $MCurrent Up toEstimate 31/3/921992/931993/941994/951995/961996/97Programme tentative over this period1997/98 1998/99 1999/00 2000/01 2001/02 Later/Cont.RemarksPACKAGE 5Areas 12, 14


ItemNo.&Cat,Pol feySec,&AgencyHead&RPIS(Y/NDescriptionExpenditure $HCurrent up toEstimate 31/3/931992/951993/941994/951995/961996/97Programme tentative over this period1997/98 1998/99 1999/00 2000/01 2001/02 Cont.Later/RemarksCIVIL ENGINEERINGCcont'd)348CLA(cont'd)Tin Shui Wai <strong>development</strong>,package 5, engineeringinfrastructure, phase ISPELTDD707NLandscaping and miscellaneous1.400.090.330.290.290.200.20Consultancy Fees48.2023.8514.663.802.201.941.75378CLATin Shui Wai <strong>development</strong>.package 5, engineeringinfrastructure for Tin ShuiWai Town Lot No.3SPEL^rivate707N-Infrastructure in Area 19 -engineering works7.403.50M1.781.061.06T^TTL 3Consul tancy Fees'1.000.560.160.140.14389CLSPELPrivate707NInfrastructure in area 2438,002.0016.007.007,006.00TSWTL 7390CLTin Shui Wai <strong>development</strong>,>ackage 5, engineeringnf restructure, phase IISPELDD707NRoads L4( remainder), L7 andtransport interchange at area33, Tin Shui Wai139.4013.0540.0030.8030.0025.55Contract YL 21/90PELDO707Mandscaping and miscellaneous8.502.491.55•u—taiMMaimiiiii «teasaaaiaa4.46Consultancy Fees16.101.953.004.712.953.49Tin Shui RTaiPackage 5Part 6Page 6.40


ItemNo.&Cat.PolicySec.&AgencyHead&RPIS(Y/N)DescriptionExpenditure $MCurrent Up toEstimate 31/3/921992/931993/941994/951995/961996/97Programme tentative over this period1997/98 1998/99 1999/00 2000/01 2001/02 Later/Cont.RemarksHIGHWAYS106TBTin Shui Wai <strong>development</strong>,package 5, Footbridge L4/F1for TDP707NTin Shui Wai <strong>development</strong>packages, Footbricfee L4/F118.200.864.55••»••3.002.545.092.16Contract YL 20/90Consultancy Fees3.300.200.37" 0.320.460.851.10COMMUNITY FACILITIES154EPATwo standard primary schools,area 16, Tin Shui WaiSENHD707NTwo standard primary schools.area 16, Tin Shui Wai54.1027.80 17.00mmawsam7.302.00SEMHD707NOthers/cont i ngenci es167EPiA168EPBSEMl rv-tUofNArciKHJSEMArchSD707707NPrimary school, area 19, Tin£i_, .• i i ;snui WaiPrimary school, area 24, TinShui Wai36.8034.001.9013.001.0015.004.0018.00 14.00in2.901.00Entrustment to developer111E3BSEMArchSO707NSecondary school, area 14, TinShui Wat36.006.00 20.00wamsmnm mm8.801.20124ESATwo standard secondaryschools, area 16, Tin Shui WaiSENHD707NTwo standard secondaryschools, area 16, Tin Shui Wai70.4041.0519.00mm6.044.31SEMHD707NOthers/con<strong>tin</strong>genciesTin Shui WaiPackage 56Page 6.41


I tonm*£Cat,PolicySec,&AgencyHead&mmCY/NDescriptionExpenditure $MCurrent Up toEstimate 31/3/921992/931993/94mt*/9S19^/961996/97Programme tentative over this period1997/98 1998/99 1999/00 2000/01 2001/02Later/Cont.Remarks(cont'd)N.I.SEMAr>/*kOftArcniH/707HFirst secondary school, area27, Tin Shui Wai43,0012.0020.009.002.00PWP NO.NQ6ES045ETAs&«ArchSDHANOne special school for mildlyhandicapped children, area 14,Tin Shui Wai17.508.00 8.50mmiimimiimm1.00PWP NO.N03EPHA's project024GICS for WArchSD707NGovernment depot, area 32, TinShui yai46.5018.0024.004.50098SCA124SCASNAHDSHWArchSD707H707NNei ghbourhood contnuni tycentre, area 16, Tin Shui WaiChildren, youth centre and daynursery, arta 24, Tin Shui Wai28.0014.106.36 6.70 6.00wtmammm&mi2.5m 9.50HMHH8.942.10URBAN & TERRITORY WIDE00831CS for WArchSO703NNew electrical & mechancialsub- workshop & New Territoriesservices Yuen Long districtvehicle depot110.0015.0045.0030.0020.00Tin Shui Wai Part 6PAtl* A ZJ?


ItemNo.&Cat.PolicySec.&AgencyHead&RPIS(Y/N)DescriptionExpenditure $MCurrent Up toEstimate 31/3/921992/931993/941994/951995/961996/971997/98Programme tentative over this period1998/991999/002000/01 2001/02 Cent.Later/RemarksRC LEISURE SERVICES108LSRCArchSDRCNIndoor recreation centre andswimming pool complex, area14, Tin Shui Wai160.925.38 87.62 58.00I®"«SH®H8.421.50110LS182LSIV183LSIV217LSIIIRCArchSDRCArchSDRCTDDRCTDDRCTDDRCTDDRCNRCNRCNRCNRCNRCNSports ground, area 12, TinShui Waiindoor recreation centre (typeC), area 14, Tin Shui WaiOpen space, area 15, Tin ShuiWaiOpen space, area 15, Tin ShuiWaiOn costsDistrict park - phase I, area22, Tin Shui Wai (RC Portion)District park - phase I, area22, Tin Shui Wai (RC portion)On cost60.0057.8815.912.5423.003.68JL7931.210.23 us22.352.001.1921.00I1.50 1.0)0.655.500.872.000.953.309.700.4422.000.710.0430.002.58Project to be relocated toarea 17, Tin Shui Wai.Regional Council project.Project cost only.Recurrent vote. Cost to berecovered from RC cyp272LSIIIDistrict Park - phase I, area22, Tin Shui Wai (sponsoredportion)RCPrivateRCNDistrict park - phase I, area22, Tin Shui Wai (sponsoredarea)T^miiiimamEntrusted project.RCTDDRCNOn costs0.400.40**"•••TDD get 1% of 40 million Oncosts from RSD for the duty oftheir Works Agent.Tin Shui WaiPackage 5Part 6Page 6.43


ItemNo.Cat,PolicySec.AgencyHeadRPIS(Y/NDescriptionExpenditure $MCurrent Up toEstimate 31/3/921992/931993/941994/951995/961996/971997/98Programme tentative over this period1998/991999/002000/012001/02 Cont.Later/RemarksRC SUPPORTING SERVICES003SPIRCArchSDRCNRSD Yuen Long vehicle depot30.2818.3110.351.62PUBLIC HOUSINGPublic housing, area 16, TinShui WaiOthersHDHANTin Shui Estate phase 1, area16387.40273.6098.20mmiuim15.60Population capacity 7300OthersHDHANTin Shui Estate phase 2, area16391.20169.10147.5069.00towmmmt5.300.30Population capacity 5200OthersHDHANTin Shui Estate phase 3, area16505.10340.70140.0021.902.50Population capacity 9900OthersHDHANTin Shui Estate phase 4, area16570.20261 .40247.2057.003.601.00Including HOS. Populationcapacity 11100Private housing, areas 19, 23& 24, Tin Shui WaiOthersRivateXXXNComnercial/residentiallousing, area 23; TSW TL4(part)Cormier ica I use onlythersrivateXXXNR1 housing, area 24; TSW TL 7Population capacity 17000thersrivateXXXN1 housing, area 19; ISM TL 3SiPopulation capacity 6500ackage Total3469.691394.11966.39402.47195.06139.21117.6267.75119.0046.0822.00Tin Shui WaiPackage 5Part 6Page 6.44


ItemNo.&Cat.PolicySec.&AgencyHead&PISY/N)DescriptionExpenditure $MCurrent Up toEstimate 31/3/921992/931993/941994/951995/961996/97Programme tentative over this period1997/98 1998/99 1999/00 2000/01 2001/02 Later/Cent.RemarksPACKAGE 6reas 20, 22{Part), 25, 2SA,25B, 27 28, 29 & 33ACIVIL ENGINEERING375CLATin Shui Wai <strong>development</strong>,package 6, Engineeringnf restructure, Phase I andPhase IISPELTDD707NTin Shui Wai <strong>development</strong>,aackage 6, EngineeringInfrastructure, Phase 1155.0012.1242.5027.5015.0016.9640.92Contract YL 20/90SPELTDD707Nfin Shui Wai <strong>development</strong>,package 6, EngineeringInfrastructure, Phase II10.003.00 3.00^^ssmmim^i2.002.00Contract YL 21/90SPELTDD707N707Additional fund other thaninflation, up to 31,3.928.001.001.001,001.004.00Consultancy Fees30.002.685.504.505.405.746.18HIGHWAYS192CLBTin Shui Wai <strong>development</strong> -remaining worksSPELPrivateNTin Shui Wai <strong>development</strong>,package 6, engineeringinfrastructure In Area 20,TSWTL 4(N)5.752.001.611.141.00SPELTDD707NTin Shui Wai <strong>development</strong>.package 6, engineeringinfrastructure • services totown park and squares61.7016.0645.64RemainderTin Shui Part 6Paae 6.45


ItemNo.&Cat.Pol icySec.&AgencyHead&RPIS(Y/MHIGHWAYS(con^d)DescriptionExpenditure $HCurrent Up toEstimate 31/3/92 1992/93 1993/941994/951995/961996/971997/98Programs tentative over this period1998/991999/002000/01 2001/02 Cont.Later/Remarks192CLB(cont'd)Tin Shui Wai <strong>development</strong> -remaining worksSPELTfkT|1 UU707Tin Shui Wai <strong>development</strong> -package 6, engineeringinfrastructure in <strong>development</strong>zone353.5210.50125.06125.0692.90SPELTDD707HTin Shui Wai <strong>development</strong> *package 6, engineeringinfrastructure, initial worksin reserve zone98.023.1530.2230.2221.6812.75Consultancy Fees58.007.0017.0017.0013.004.00396CLATin Shui Wai <strong>development</strong>.package 6, engineeringinfrastructure for Tin ShuiWai Town Lot Nos. 5 and 6SPEL> rlvate707NTin Shui Wai <strong>development</strong>.package 6, engineeringnf restructure in Area 27,TSWTL 551.101.1018.0018.0014.00PELrivate707NTin Shui Wai <strong>development</strong>,package 6, engineeringnf restructure in Area 28,SWTL 632.900.9010.0012.0010.00Tin Shui FfaiPao/cagre 6Part 6Page 6.46


Itemdo.&:at..1..1..1..1.84LSV57LS[VPolicySec.&AgencyEMrchSDENrchSDHAArchSDRCArchSDRCTDDRCTOORCTDDRCTDDHead&PISY/N)707H707N707NRCNRCNRCNRCNRCMDescriptionCOMMUNITY FACILITIEStandard primary school, area7, Tin Shui WaiSecond secondary school, area7, Tin Shui WaiArea community centre, area27, Tin Shui WaiRC CULTURE & ENTERTAINI€NTCultural centre, area 33A, TinShui WaiRC LEISURE SERVICESDistrict square, area 29, TinShui WaiDistrict square, area 29, TinShui WaiOn costsDistrict park - phase II, area22, Tin Shui WaiDistrict park - phase II, area22, Tin Shui WaiOn costsExpenditure $MCurrent up toEstimate 31/3/92 1992/93 1993/9433.5043.0034.0026.5011.811.8967.4910.941.151994/950.01 12.00mm mmmimiim6.001995/9615.000.30^1996/9713.004.501.00 30.00 30.00imimimiiiiiiiiiaimmm2.00 9.50 t^ •••••0.883.40 2.40 2.401997/9814.0012.005.991,000.636.491.59Programme tentative over this period1998/9914.0020.003.000.31O.OB1999/004.009.002000/011.502.002001/02 Cont.Later/PWP NO.N15EPPyp No.NOTESPW> No.NOlSCRemarksProject under reviewRegional Council project.Project cost only.Recurrent vote. Cost to berecovered from RC CM*Regional Council project.Budget and phasingarrangements under review.Recurrent vote. Cost to berecovered from RC cypTin Shui WaiPackage 6Part 6Page 6.47


ItemNo,&Cat.Pol feySec.&AgencyHead&RPISCY/NDescriptionExpend! ture $NCurrentEstimatUp to31/3/921992/931993/941994/95 1995/961996/971997/98Programme tentative over this period1998/991999/002000/012001/02 Cont.Later/RemarksRC LEISURE SERVICES(cont'd)M.I.Open spaces, area 35, Tin ShuWaiRCTDDRCNOpen space, area 25, Tin Shu!WaiPWP NO.N06LS. Regional Councilproject. Not yet in RC CWP.RCTDDRCTDDRCNRCNOpen space, area 25A, Tin ShuiWaiOpen space, area 25B, Tin ShuiWaimmmi1PWP NO.N06LS. Regional Councilproject. Not yet in RC (M>.PUP NO.N06LS. Regional Councilproject to be doyngraded to RCminor works item. RegionalCouncil project. Not yet in RCCWP.PUBLIC HOUSINGPrivate housing, areas 20, 27& 28, Tin Shui WaiOthersPrivateXXXNComnerci al/residentf allousing, area 20; TSW TL4(part>Conner ica I use onlythersrivateXXXN1 housing, area 27; TSW TL 5Population capacity 12400thersrivateXXXN1 housing, area 28; TSW TL 6Population capacity 9600ackage Total1093.1214.8049.0041.1580.48 182,83303.16223.48164.9729.753.50Tin Shui WaiPackage 6Part 6Page 6.48


ItemNo.&Cat.PolicySec.&AgencyHead&RPISCY/N)DescriptionExpenditure $MCurrent Up toEstimate 31/3/92 1992/93 1993/94 1994/951995/961996/971997/98Programme tentative over this period1998/991999/002000/012001/02 Later/Cont.RemarksPACKAGE 1Yuen Long - Tuen Mun corridorareaCIVIL ENGINEERING191CLBSPELTDD707YPing Shan <strong>development</strong>,remainder130.0010.5021.0036.5036.5025.50213CLBSPELTDD707YYL-TM corridor / ruralhinterland - engineering worksfor village priority areas(nos. 1-13)88.508.5021.0021.0020.5017.50222CLBYL-TM corridor - engineeringworks for new residentialareas at Hung Shui Kiu and SanHing TsuenSPELTOD707YYL-TM corridor - engineeringworks for new resi dent i alareas at San Hing Tsuen28.003.007.9513.663.39SPELTDD707YYL-TM corridor - engineeringworks for new residentialareas at Hung Shui Kiu81.0017.0519.3418.1118.508.00224CLBYL-TM corridor - engineeringworks for industrial upgradingareas at San Hing Tsuen, TongYan San Tsuen, Kiu Tau Wai andTan K<strong>wai</strong> TsuenSPELTDDSPELTDD707Y707YEngineering works at Tuen MunareaEngineering works at Yuen Longarea26.60119.400.50 sm0.5011.0011.0015.10ppippp34.9050.0023.00North West NTPackage 1Part 6Page 6.49


ItemNo.&Cat.PolicySec.AgencyHead&RPI'SCY/NDescriptionExpenditure $MCurrentEstimatup to31/3/92 1992/93 1993/94 1994/951995/961996/97Programme tentative over this period1997/98 1998/99 1999/00 2000/01 2001/02Later/Cont.Remarks225CL3252CL-SPELHyDSPELTDD707Y707YCIVIL ENGINEERING(cont'd)YL-TM corridor - engineeringworks for comnercial/residential area at Hung ShuiKiu, Stage IIYL-TM corridor / ruralhinterland - engineering worksfor village priority areas(nos. 14-24)44.0075.0026.0013.00^^^•^••^••••M5.008.0020.0020.0018.009.00253CLBSPELTDD707YYL-TM corridor - engineeringworks for Hung Shui Kiu andPing ShanYL-TM corridor - engineeringworks for Hung Shui Kiu38.590.50 6.169.078.867.007.00SPELTDD707YYL-TM corridor - engineeringworks for Ping Shan22.417.847.936.64254CLYL-TM corridor - engineeringworks for Yick Yuen (south)rea 111, Lam Tei, area 85,San Sang Tsuen, area 123SPELTDD707YL-TM corridor - engineeringworks at Tuen Mun area36.009.009.009.009.00SPELTOD707YL-TM corridor - engineeringworks at Yuen Long area80.0020.0020.0020.0020.00Worth West NT Part 6Page 6.50


ItemNo.&Cat.PolicySec.&Agencyead&RPISY/N)DescriptionExpenditure $MCurrentEstimateup to31/3/921992/931993/941994/951995/961996/971997/98Programme tentative over this period1998/991999/0020)0/012001/02 Cont.Later/RemarksIVIL ENGINEERINGcont'd)255CLL-TM corridor - engineeringworks for San Hing Tsuen,extension area 92 and Tong YanSan Tsuen, extension area 70PELDP707YL-TM corridor - engineeringworks at Yuen Long area25.000.106.006.006.006.90PEL'DO707YYL-TM corridor - engineeringworks at Yuen Long area80.0020.0020.0020.0020.00314CLPing Shan <strong>development</strong>, stage ISPELTDD707YPing Shan <strong>development</strong>, stage I41.296.0016.368.4010.53Consultancy Fees6.570.803.402.120.25317CLAYL-TM corridor - engineeringworks at Hung Shui Kiu, stageI, phase 1, site formation forschools707Completed Works1.311.31SPELHyO707YOthers/Cont f ngenci es0.%0.94North West NTPackage 1Part 6Page 6.51


ItemNo.&Cat,PolicySec.&AgencyHead&RPISCY/NDescriptionExpenditure $MCurrentEstimatUp to31/3/^21992/931993/941994/951995/96 1996/971997/98Programme tentative over this period1998/991999/002000/012001/02 Cont.Later/Remarks346CLA707CIVIL ENGINEERING(cont'd)YL-TM corridor - engineeringworks for contnerical/residential area at Hung ShuiKiu, stage I, phase 2Conpleted Works0.200.20SPELHyO707YYL-TM corridor - engineeringworks for commercial/resi dent i a 1 area at Hung ShuiKiu, stage I, phase 214.8013.300.800.100.60N.I.SPEL'DO707NJCiu Tau Wai industrial area<strong>development</strong>50.000.1025.0020.004.90N01CL253TH*SPEL•t\t\ DO707YYL-TM corridor - site: ormation, roads & drains atan K<strong>wai</strong> Tsuen, Hung Shui Kui& San Hing Tsuen30.0010.0010.0010.00HIGHWAYS706Completed Projects35.2935.29214THfor Tyo706Nong Yan San Tsuen roads andrains stage II32.505.00••••a22.505.00North West NTPackage 1Part 6Page 6.52


ItemNo.&Cat.PolicySec.&AgencyHead&RPIS(Y/N)DescriptionExpenditure $HCurrent Up toEstimate 31/3/92 1992/93 1993/94 1994/951995/961996/971997/98Programme tentative over this period1998/991999/00 20)0/01 2001/02 Cent.Later/RemarksRC LEISURE SERVICES177ISIVLocal open space, Ping ShanRCTDDRCNLocal open space, Ping Shan12.404.727.090.59Regional Council project.Project cost onlyRCrDDRCNOn costs1.980.500.500.930.05Recurrent vote. Cost to berecovered from RC Ctf>178LSIV.oca I open space, Hung ShuiKiu, phase IRCTDDRCN.oca I open space, Hung ShuiKiu, phase I10.043.406.010.63Regional Council project.Project cost onlyRCTDDRCNOn costs1.610.410.450.700.05Recurrent vote. Cost to berecovered from RC CW179LSIVHung Shui Kiu town squareRCTDDRCNHung Shui Ki u town square8.273.744.430.10Regional Council project.Project cost onlyRCTDDRCOn costs1.320.500.600.200.02Recurrent vote. Cost to berecovered from RC CW*259LSIVLocal open space, Hung ShuiKiu, Phase IIRCTDDRCNLocal open space, Hung ShuiKiu, phase II17.123.0014.00ms0.12Regional Council project.Project cost only.RCTDDRCNOn costs2.740.420.910.201.190.02Recurrent vote. Cost to berecovered from RC CW>North West NTPackage 1Part 6Page 6.53


ItemNo.&Cat.PolicySec.&AgencyHead&RPISCY/NDescriptionExpenditure $MCurrent Up toEstimate 31/3/921992/931993/941994/951995/961996/97Programme tentative over this period1997/98 1998/99 1999/00 2000/01 2001/02Later/Cont.RemarksRC LEISURE SERVICES(cont'd)N.I.N.I.IVRCTDDRCTODRCNRCNDistrict open space, <strong>long</strong> VanSan Tsuen, NWNTLocal open space, <strong>long</strong> Van SanTsueniPW* Mo.NOlLS. Regional CouncilProject. Not yet in RC CUP.Regional CotTcil project. Notyet in RC CWP.Package Total114Z.8856.9020.5610.6241.3064.76125.31256.55 261.58186.90109.409.00North West NTPackage 1Part 6Page 6.54


ItemNo.&Cat.Pol icySec.&AgencyHead&RPIS(Y/N)DescriptionExpenditure $MCurrent Up toEstimate 31/3/921992/931993/941994/951995/961996/971997/98Programme tentative over this period1998/991999/002000/012001/02 Later/Cont.RemarksPACKAGE 2Major HighwaysCIVIL ENGINEERING328TH\S for THyO706NYuen Long-Tuen Mun EasternCorridor and Yuen Long WestLink: site investigations andworks830.55419.42 241.00 145.68mmm^mismam23.451.00HIGHWAYS706Completed Projects48.8948.89080THAS for THyD706NNT Circular road improvements,Au Tau to Fan Kam Road -phase I to IV1070.50944.9965.4820.5018.7920.74Q84THAS for THyO706NNT Circular Road improvements,Au Tau to Fan Km Road -consultants design fees andinvestigations50.0036.400.87•IfliinnMiiiBi2.005.405.33092THAS for THy0706NVehicular boarder link at LokMa Chui - consultants fees,investigations and works341.20324.384.503.109.22109THCS for THyO706NNorth West New Territories<strong>development</strong> - improvement toKam Tin Road291.0060.0080. 00132.0019.00172THBS for THyO706NNT Circular Road improvements.Au Tau to Fan Kam Road - AuTau bypass and remaining works720,00130.00320.00150.00100.0020.00North West NTPackage 2Part 6Page 6.55


ItemNo.&Cat.Pol feySec.&AgencyHead&RPIS(Y/NHIGHWAYS(cont'd)DescriptionExpenditure $MCurrent Up toEstimate 31/3/921992/931993/941994/951995/961996/971997/98Programme tentative over this period1998/991999/002000/012001/02 Later/Cent.Remarks178THBS for THyD706HVehicular border link at LokMa Chau, remaining works95.00^50.0045.00246THS for TUvft nyu706North West Territories<strong>development</strong> - Kant Tin bypassstage I99.0024.0038.0032.005.00248THANorth West New Territories<strong>development</strong>, Tin Shui Wai eastaccess and Long Ping EstatelinkS for TTDD707NRoadworks85.7077.008.180.52Contract No.YL 11/88.S for TTDD707NMiscellaneous21.241.741.585.406.056.47Consultancy Fees12.068.801.400.400.600.450.41249THfor T*.f\yo706orth West New Territoriesevelopnent - Yuen Longsouthern bypass373.7811.4094.76135.55131.200.700.17275THfor TDD707Ning Ha Road improvement -emaining works20.008.508.503.00308THorth West New Territoriesevelopment - Tin Shui Waiwest accessfor TDD707Nin Shui Wai west access186.607.8037.8041.4048.9050.70for TX)707Nandscaping and miscellaneous10.502.004.004.50North West NTPacrJcagre 2Part 6Page 6.56


ItemNo.&Cat.PolicySec.&AgencyHead&RPIS(Y/N)DescriptionExpenditure $MCurrent Up toEstimate 31/3/921992/931993/941994/951995/961996/97Programme tentative over this period1997/98 1998/99 1999/00 2000/01 2001/02Later/Cont.RemarksHIGHWAYS(cont'd)308THA(cont'd)North West New Territories<strong>development</strong> - Tin Shui Waiwest accessConsultancy Fees22.901.807.207.105.101.70336THBS for THyO702*NRoad link between the NorthWest New Territories and WestKowloon (Route 3} - works forcountry park section and TingKau Bridge9056.00106.00115.002045.004314.002476.00351THAS for THyO706NNorth West New Territories<strong>development</strong> - Yuen Longsouthern bypass, consultantsfees and investigations19.2616.850.501.620.29436THCS for THyO706NDeep Bay coastal road134.0020.0050.0030.0020.0014.00Package Total13488.181889.87426.29355.95359.35265.772286.954738.002794.00294.0064.0014.00North West NTPackage 2Part 6Page 6.57


ItemNo.&Cat.PolicySec.&AgencyHeadaRPISCY/NDescriptionExpenditure $MCurrent up toEstimate 31/3/921992/931993/941994/951995/961996/971997/98Programme tentative over this period1998/991999/00 2000/01 2001/02 Cont.Later/RemarksPACKAGE 3Civil Engineering -MiscellaneousCIVIL ENGINEERING019DPASPELOthers707707NCompleted ProjectsEnvironmental review of DeepBay inter- re I a ted projects40.984.5040.984.170.010.32Consultancy study managed byEPD under Agreement No. CE16/87.WATERWORKS709Completed Projects5.945.94034WFBYuen Long water supply -remaining worksS for WWSD709NYuen Long water supply -remaining works. Tan K<strong>wai</strong>'suen Service Reservoir -Stage I69.620.3439.8420.908.54S for WWSD709NYuen Long water supply -remaining works. Tan K<strong>wai</strong>suen Service Reservoir -tage II and additional trunkmains77,0017.0031.0025.004.00047WFfor WWSD709N>rincipal distribution systemsetween San Tin, San Wai andwu Tung19.6519.150.200.30Worth West NTPackage 3Part 6Page 6.58


ItemNo.&Cat,PolicySec.&AgencyHead£RPIS(Y/N)DescriptionExpenditure $MCurrent Up toEstimate 31/3/921992/931993/941994/951995/961996/971997/98Prograrme tentative over this period1998/991999/00 2000/01 2001/02 Later/Cont.RemarksWATERWORKScont*d)10WFfor WUSD709Nater treatment and transferacilfties at Au'Tau, YuenLong - stage I429,36341.26 51.72 36.38•••i iiiiiiiiiiiii141WFBAdditional treatment andtransfer facilities for NorthWestern New TerritoriesS for WWSD709NAdditional treatment andtransfer facilities for NorthWestern New Territories (NgauTarn Mei Treatment Works -StageI) (Part A - Design Fees)15.0012.502.50S for WJSO709NAdditional treatment andtransfer facilities for NorthWestern New Territories (NgauTarn Mei Treatment Works -StageI) (Part B - Works)390.00150.00130.00110.0)144WFAS for WWSD709NWater treatment and tranferfacilities at Au Tau, YuenLong. Stage 2 - Investigationand design302.566.7423.83 111.0685.5175.42North West NTPackage 3Part 6Page 6.59


itemNo.&Cat.PolicySec.&AgencyHead&'RPIS(Y/NDescriptionExpenditure $MCurrentEstimatUp to31/3/921992/931993/941994/951995/961996/971997/98Programme tentative over this period1998/99 1999/00 2000/01 2001/02 Cont.Later/RemarksCOT*IUNITY FACILITIES320CLBSPELTDD I \fV707Tai Tong East borrow arealandscape works34.002.005.905.7010.2010.20DRAINAGE021CDANorth West New Territories<strong>development</strong> - main drainagechannels for Tin Shui WaihinterlandSPELDSD707YNorth West New Territoriesdevelopmtnt - main drainagechannels for Tin Shui Waihinterland (Contract No. CV/88701)27.20S.50ra1.500.20Drainage channels at Hung UkTsuen, Tai To Tsuen and FuiSha Wai .SPELDSD707YNorth West New Territories<strong>development</strong> - main drainagechannels for Tin Shui Waihinterland (Contract No. CV/88702}21.2619.201,860.20Drainage enamels at Tin San,Sik Kong Wai and Tseung KongWai.SPELDSD707YNorth West New Territories<strong>development</strong> • main drainagechannels for Tin Shui Waiinterland (Contract No. CV/8906)70.9966.304.190.50Drainage channel at Hung ShuiKiu.PELSD707Yorth West New Territoriesevelopment - main drainagechannels for Tin Shui Waiinterlard (Contract No, DR/8901)9.496.41Si2.980.10Drainage channels at Tan K<strong>wai</strong>Tsuen.PELDD707Yorth West New Territories<strong>development</strong> - main drainageCamels for Tin Shui Waiinterland - miscellaneous andandscape works6.061.810.160.902.001.19Worth West NTPackage 3Part 6Page 6.60


ItemNo.&Cat.PolicySec.&AgencyHead&RPIS(Y/N>DescriptionExpenditure $MCurrent Up toEstimate 31/3/92 1992/93 1993/941994/951995/961996/97Programme tentative over this period1997/98 1998/99 1999/00 2000/0 2001/0Later/Cont.RemarksDRAINAGE(cont'd)022COBNorth West New Territories<strong>development</strong> - main drainagechannels for Yuen <strong>long</strong> and KamTin - remainderSPEL)SO707YNorth West New Territories<strong>development</strong> - main drainagechannels for Yuen Long and KamTin - remainder (phase 1)249.904.0058.55114.1573.20SPELDSD707YNorth West New Territories<strong>development</strong> - main drainagechannels for Yuen Long and KamTin • remainder (phase 2)125.001.0035.5557.0831.37SPELDSD707YNorth West New Territories<strong>development</strong> - main drainagechannels for Yuen Long and KamTin - remainder (phase 3)103.9415.6851.8931.375.00SPELTDD707YNorth West New Territories<strong>development</strong> * main drainagechannels for Yuen Long and KamTin - remainder (phase 4)104.165.2251.8847.06043CDBNorth West New Territories<strong>development</strong> - main drainagechannels for Yuen Long and KamTin - stage ISPELDSD707YNorth West New Territories<strong>development</strong> - main drainagechannels for Yuen Long and KamTin - Stage I (phase 1)445.2835.00123.00119.00122.7345.55SPELDSD707YNorth West New Territories<strong>development</strong> - main drainagechannels for Yuen Long and KamTin - Stage I (phase 2)402.00$.0082.0079.3398.18102.4935.00North West NTPackage 3Part 6Page 6.61


ItemNo.&Cat,Pol icySec.&AgencyHead&RPIS(Y/N)DescriptionExpenditure $MCurrent Up toEstimate 31/3/921992/931993/941994/951995/961996/97Programme tentative over this period1997/98 1998/99 1999/00 2000/01 2001/02Later/Cont,RemarksDRAINAGE(cont'd)Q43CDB(cont'd)North yest New Territories<strong>development</strong> - main drainagechannels for Yuen Long and KmTin - stage ISPELDSD707YNorth West New Territories<strong>development</strong> - main drainagechannels for Yuen Long and KamTin - Stage I (phase 3)194.7256.6749.0948.9640.00M.I.-RCArchSDRCNRC MULT I -FUNCTIONIndoor recreation centre andmarket in San TinPackage Total35.003183.61537.4686.45191.98350.75383.03584.7414.00651 .2014. (X)386.003.508.503.503.50PWP NO.N02LS. Not in RC CUP.North West NTPackage 3Part 6Page 6.62


ItemNo.&Cat.PolicySec.&AgencyHead&RPISCY/N)DescriptionExpenditure $MCurrent Up toEstimate 31/3/92 1992/93 1993/94 1994/951995/961996/97Programme tentative over this period1997/98 1998/99 1999/00 2000/01 2001/02Later/Cent.RemarksPACKAGE 4Rural DevelopmentCIVIL ENGINEERING184CLcSPELTDD707YDevelopment of remaining ruralhinterland in the North WestNew Territories - engineeringworks254.0036.0036.0036.0036.00110.00189CLCSPELTDD707YLau Fau Shan <strong>development</strong>,package 340. 006.0012.0012.0010.002G7CLBLau fau Shan <strong>development</strong> ,package 4SPELTDD707YSite formation, roads anddrains100.996.2412.5224.9931.2426.00SPELTDD707YSewage pumping station18.754.168.346.25218CLCSPELTDD707YKam Tin rural <strong>development</strong> -remaining engineering works150.0030.0035.0032.0028. (X)25.00219CLB29QCLBSPELTDDSPELTDD707Y707YSan Tin <strong>development</strong> -engineering worksKam Tin rural <strong>development</strong> -engineering works, phase I70.0043,500.5021.750.1021.2515.0025.0025.004.90North West NTPackage 4Part 6Page 6.63


ItemNo.&Cat,Pot IcySec.&AgencyHead&RPIS


ItemNo.&Cat.PolicySec.&AgencyHead&RPIS


ItemNo,aCat.Pol feySec,&AgencyHead&RPIS(Y/NDescriptionExpenditure $MCurrent Up toEstimate 31/3/92 1992/93 1993/94 1994/95 1995/96 1996/971997/98Programme tentative over this period1998/991999/002000/012001/02 Cont.Later/RemarksOm/NITY FACILITIES(cont'd)100SCN.I.SKAA •*/%!* Oft ArchilSHAArehSO707N707NArea community centre, KamTin, NWNTArea community centre, Lau FauShan, NWNT43.0043.006.0014.0015.0020.0015.006.007.003.00PWP NO.N06SCN.I.SHAArchSD707NNeighbourhood communitycentre, San Tin, NWNT38.0012.00| 18.006.002.00PWP No.NOTSCN.I,SHWArchSD707NComnuni ty hall/social centrefor elderly, Fung (Cat Heung,NWNT20.008.00 10.00^^^^••B2.00PWP NO.N08SCN.I.N.I.SHUArchSDSHWArchSD707N707NConmunity hall/social servicecentre for the elderly, HungTso Tin, NWNTConmunity hall/social servicecentre for the elderly, SheungChuk Yuen, NWNT20.0020.008.00 10.008.00 10.00vmmmmmwiim2.002.00PWP NO.N09SCpy> NO.NIOSCN.I.SHWArchSD707NConmunity hall/social servicecentre for the elderly, PakNai, NWNT20.008.0010.002.00PWP NO.N12SCNorth West NTPackage 4Part 6Page 6.66


ItemNo.&Cat.PolicySec.&AgencyHead&RPISDescriptionExpenditure $MCurrent Up toEstimate 31/3/921992/93 1993/94 1994/951995/961996/971997/98Programme tentative over this period1998/991999/00 2000/01 2001/02 Cont.Later/RemarksRC ENVIRONMENTAL HYGIENE019EHIVRCArchSDRCNReprovisiomng of Kam TinMarket, NWNT16.641.65m7.707.29022EHIVRCArchSDRCNLau Fau Shan market, NWNT16.643.30 11.00••••« mm2.34RC LEISURE SERVICES112LSIVKai Shan recreational priorityareaRCTDDRCNKai Shan recreational priorityarea4.542.00Inn2.500.04Regional Council project.Project cost only.RCTDDRCNOn costs0.730.23 0.37msasssm m0.110.02Recurrent vote. Cost to berecovered from RC CH*.153LSIVLau Fau Shan, Town SquareRCTDDRCNLau Fau Shan, Town Square7.684.52m3.100.06Regional Council project.Project cost only.RCTDDRCNOn costs1.230.380.61m0.210.03Recurrent vote. Cost to berecovered from RC CM>1621SillLocal open space at Kat KingWai, Kam TinRCRSDRCNLocal open space, Kat KingWai, Kam Tin6.352.853.180.32RCRSDRCNOncosts1.020.080.240.450.230.02Recurrent vote cost to berecovered from RC (M>North West NTPackage 4Part 6Page 6.67


ItemNo.&Cat.PolicySec,&AgencyHead&RPISCY/NDescriptionExpenditure $NCurrent Up toEstimate 31/3/92 1992/93 1993/94 1994/95 1995/961996/971997/98Programme tentative over this period1998/991999/002000/012001/02 Later/Cont.Recrtarks187LSIV188LSIVM.I.RCArchSDRCArchSDRC • «/st«cn ArCnSDRCNRCNRCNRC LEISURE SERVICES(cont'd)Swimming pool complex, KamTin, NWNTIndoor recreation centre (typeB), Kam Tin, NWNTSwimming pool complex in HungShui Kui57.8841.2457.885.505.5022.00 28.00msmi11.00 22.00\mm20.002.382.7428.007.002.88PWP NO.N03LSN.I.RCTODRCTDDRCNRCNLocal open space and centralarea improvements, Kam Tin,NWNTKam Tin central areaimprovementsLocal open space, Ha Pak Naiim«PWP NO.N04LS. Regional Councilproject. Not yet in RC OJP.PWP NO.N04LS. To be retitled*Local open space, Pak Nai 1 .Regional Council project. Notyet in RC C^.N.I.IVRCTDDRCNLocal open space adjacent tocommunity centre, Kam TinmsmaammmsmRegional Council project. Notyet in RCCWP.N.I.IVRCTDDRCNLocal open space, waterfrontamenity area, Lau Fau ShanRegional Council project. Notyet in RCCWP.N.I.IVRCDORCNLocal open space adjacent toWing Ling Wai Road L2, Kam Tin%mRegional Council project. Notyet in ROM 5 .Worth West NTPackage 4Part 6Page 6.68


iItemNo.&Cat.PolicySec,&AgencyHead&RPIS(Y/N)DescriptionExpenditure $MCurrent Up toEstimate 31/3/921992/931993/941994/951995/961996/97Programme tentative over this period1997/98 1998/991999/002000/012001/02Later/Cont.RemarksRC LEISURE SERVICES(cont'd)N.I.IVRCTDDRCNLocal open space, Hung Tso TinnRegional Council project. Notyet in RCCVP.M.I.IVN.I.IVN.I.IVRCTDDRCTDDRCTDDRCNRCNRCNLocal open space, Ngau Tarn MeiLocal open space, Sheung ChukYuenLocal open space adjecent toKam Tin San Tsuen Road A7HB ~ Biii ~__!«,ai•HP^BBm®Regional Council project. Notyet in RCCWP.Regional Council project. Notyet in RCCWP.Regional Council project. Notyet in RCQ^P.N.I.IVRCTDDRCNLocal open space, San TinRegional Council project. Notyet in RCCWP.N.I.IVRCTDDRCNLocal open space, Fung KatHeungmmmttm smRegional Council project. Notyet in RCCWP.RC MULTI- FUNCTION001MFIVRCArchSDRCNRegional council complex atHung Shui Kiu, NWNT118.3910.0035.0065.007.001.39Package Total1844.9686.322.7711.5144.53123.90111.41383.23484.51307.00139.78150.00iNorth West NTPackage 4Part 6Page 6.69


IItemNo.&Cat.PolicySec.&AgencyH 0£u4 Sou&RPIS(Y/N3DescriptionExpenditure $HCurrent Up toEstimate 31/3/921992/931993/941994/951995/961996/971997/98Programs tentative over this period1998/991999/00 2000/01 2001/02 Later/Cont.RemarksPACKAGE 5Improvement to Village andUrban Fringe AreasHIGHWAYS013HHA014HHASPELTDD707YFootpath and van tracks inYeung Uk TsuenImprovement to Urban Fringeand Rural Areas in NewTerritories 1987-881.001.00SPELHyO707707YCompleted WorksKant Tsin Wai - improvement ofaccess road2.041.952.041.600.35UFI NO.YL87-3015HHAImprovement to Urban Fringeand Rural Areas in NewTerritories 1988-89707Completed Works0.560.56018HHJSPELHyD707YVillage improvement and<strong>development</strong> schemes in the NT15.200.501.704.004.603.301.10018HH(part)019HHAVillage improvement works and<strong>development</strong> schemes in the N.T, : 1990 - 1991 <strong>programme</strong>SPELHyO707YVillage improvement works nearLo Uk Tsuen, phase I -formation of part VEA0.800.80MMRef No. NW-021Worth West NTPackage 5Part 6Page 6.70


ItemNo.&Cat.PolicySec.aAgencyHead&RPIS(Y/N)DescriptionExpenditure $MCurrent Up toEstimate 31/3/921992/931993/941994/951995/961996/97Programne tentative over this period1997/98 1998/99 1999/00 2000/01 2001/02 Later/Cent.RemarksHIGHWAYS(cont'd)G23HHAVillage improvements anddeve I opfnent schemes in NT :1992 - 1993 <strong>programme</strong>SPELWSD707YPak Nai - improvement ofirrigation facilities2.00mm2.00Ref. No. NW-028SPELOthers707YTsat Sing Kong, improvement ofirrigation facilities1.001.00miRef. No. NW-132SPELWSO707YWater Supply to Sheung & HaPak Nai2.50ms2.000.50Ref. No. NW-1B446TH SPELbB• HyO707Improvement, reconst ructionand extension of villageaccess roads in the NT20.200.7010.509.00475THAImprovement, reconstructionand extension of villageaccess in the ILT. : 1990 - 91<strong>programme</strong>SPELHyO707YVillage improvement works nearLo Uk Tsuen, phase II -construction of access roadand carpark1.801.80Ref. No. NW-022SPELHyO707YVillage improvement works nearLo Uk Tsuen, phase III *construction of footpathconnection the VEA to Road B160.500.50Ref. No. NW-023SPELHyO707YMong Tseng Wai, accessimprovement from Deep Bay Roadto Mong Tseng Wai0.880.55ms0.33Ref. No. NW-104North West NTPackage 5Part 6Page 6.71


ItemNo.&Cat.484THA504THASPELHyOSPELHyOSPECHyOSPELWSPELyoPELyoPolicySec,&AgencyretthersHead&RPISCY/N707Y707Y707Y707Y707Y707Y707YHIGHWAYSDescriptionImprovement, reconstructionand extension of villageaccess roads in the NewTerritories? 1991-1992ProgramneUpgrading of Shek Wu Tongaccess roadNgau Tarn Mei access road,phase 1Reconstruction of access roadto Fung Kong TsuenHung Shui Kiu, Tin Sam Roadreconstruction of van trackYuen Kong San Tsuen,reconstruction of van trackai Kong Po, provision andmprovement of farm accessmprovement, reconstructionand extension of villageaccess roads in the Newerritories : 1992 - 1993jrogramneavement and footpath at Sikong Tsuen, Ha Tsuen, YuenongExpenditure $MCurrentEstimat3.704.501.501.201.500.951.00Up to31/3/92 1992/931993/941.201.500.10 0.85Hi0.20 «HI0.801994/951995/960.70^3.002-Op| 2.5010.50| 1.001996/97Programme tentative over this period1997/98 1998/99 1999/00 2000/01 2001/02 Cent.Later/RemarksRef. No. NW-108Ref. No. NW-079Ref. No. NW-109Ref. No. NW-107Ref. No. NW-1Q5Ref. No, NW-106Ref. No. NW-126PELthers707Yecons true t ion of van trackrom Tung Chan Wai to Yan Saufei, San Tin0.700.70Ref. No. NW-127North West NTPackage 5Part 6Page 6.72


ItemHo.&Cat.PolicySec.&AgencyHead&RPISCY/N)DescriptionExpenditure $MCurrent Up toEstimate 31/3/92 1992/931993/941994/951995/96 1996/97Programme tentative over this period1997/98 1998/99 1999/00 2000/01 2001/02 Cont.Later/RemarksHIGHWAYS(cont'd)504THA(cont'd)Improvement, reconstructionand extension of villageaccess roads in the NewTerritories : 1992 - 1993<strong>programme</strong>SPELOthers707YResurfacing of van track atFung Kat Heung, Kara Tin0.850.85Ref. No. NW-128SPELOthers707YReconstruction of van track atHung To Road, Chau Tau, SanTin0.400.40Ref. No. NW-129SPELOthers707YVan track and footpath at WongNai Tun, Shap Pat Heung, YuenLong0.450.35 mmHi0.10Ref. No. NW-130SPELOthers707YTsat Sing Kong, improvement offarm access0.700.70KMRef. No. NW-131COMMUNITY FACILITIES016HHAImprovement to Urban Fringeand Rural Areas in NewTerritories 1989-90SPELOthers707YNam Pin Wai Village LandscapeArea1.001.00UFI NO.YL89-6North West NTPackage 5Part 6Page 6.73


ItemNo.&Cat,PolicySec.&AgencyHead&RPIS


ItemNo.&Cat.PolicySec.&AgencyHead&RPIS


ItemNo. &Cat.PolicySec.&AgencyHead&RPISCY/N)DescriptionExpenditure $MCurrent Up toEstimate 31/3/921992/931993/941994/951995/961996/971997/98— —.— ——Programme tentative over thi< s period1998/991999/00—2000/01»»»»»— •'•'2001/02Later/Cont.• • ~Remarks0PACKAGE 6Sewerage Schemes061DSB063DSC084DSA087DSASPELDSDSPELTDDSPELDSDSPELTDD707N707N707N707NCIVILENGINEERINGNorth West New Territories<strong>development</strong> - trunk sewers,sewage punping stations andrising mains - stage IIINorth West New Territories<strong>development</strong> - sewage treatmentplant, remainderNorth West New Territories<strong>development</strong> - trunk sewers,sewage pumping stations andrising mains - stage IremainderNorth West New Territories<strong>development</strong> - trunk sewers,sewage punping stations andrising mains - stage I(Contract No. NTDB 33/85(part))155.13906.0056.2011.0038.2710.962.501.8713,007.509.505.600.0424.900.4627.76200.0035.54200.0027.76306.0016.67200.00runk sewers, rising mains andewage puiping stations atuen Long South and Tuen Hunnorthor upgrading level of sewagereatment at San Wai sewagereatment plant.Trunk sewers at Hung Shui Kiu,Fui Sha Wai and Tin Shui Wai.Constructed under Contract No.NTDB 33/^. Trunk sewersbetween Hung Shui Kiu and PingHa Road.089DSASPELDSDSPELDSD707N707NNorth West New Territories<strong>development</strong> - trunk sewers,sewage punping stations andrising mains - stage IINorth West New Territories<strong>development</strong> • trunk sewers,sewage punping stations andrising mains - stage II(Contract No. CV/89/12)North West New Territories<strong>development</strong> - trunk sewers,sewage punping stations andrising mains - stage II(Contract No. CV/89/13)40.2257.2035.4245.704.8011.50Civi I works for Ha Tsuensewage punping station, phase1.Rising mains contract.North West NTPackage 6Part 6Page 6.76


ItemNo,&Cat.PolicySec.&AgencyHead&RPJS(Y/N)DescriptionExpenditure $MCurrent Up toEstimate 31/3/921992/931993/941994/95 1995/961996/97Programme tentative over this period1997/98 1998/99 1999/00 2000/01 2001/02 Cont.Later/RemarksCIVIL ENGINEERING(cont»d)089DSA(cont'd)North West New Territories<strong>development</strong> - trink sewers,sewage pumping stations andrising mains - stage IISPELDSD707NNorth West New Territories<strong>development</strong> - trunk sewers,sewage pumping stations andrising mains - stage II(Contract No. 1Q06/EH/89)49. 0028.3316.204.47Electrical and mechanicalworks for Ha Tsuen sewagepunping station.SPELTDD707NNorth West New Territories<strong>development</strong> - trunk sewers,sewage purping stations andrising mains - stage II(Contract No. TM 69/88 (part))5.084.680.40Site formation works fordrainage reserve between TinHa Road and San Wai sewagetreatment plant under ContractNo. TM69/88.SPELDSD707NNorth West New Territories<strong>development</strong> - trunk sewers,sewage pumping stations andrising mains - stage II (p/sphase II)4.752.502.25Works for Ha Tsuen sewagepurping station, phase 2.SPELTDD707NNorth West New TerritoriesDevelopment • trunk sewers,sewage pumping stations andrising mains - stage II(miscellaneous)10.750.680.035.005.04 ..IiuBnniiiiiiiiiiiiiiniiiii m$^ilmm*mmmmiMiscellaneous and landscapeworks.North Nest NTPackage 6Part 6Page 6.77


ItemNo.aCat.PolicySec.&AgencyHead&RPIS


ItemNo,&Cat.023CDB029CD6030CDB035COBPolicySec.&AgencySPELDSDSPELDSDSPEtDSDSPELDSDSPELDSDHead&DescriptionRPISCY/H)PACKAGE 7Flood Mitigation SchemesDRAINAGE707 North West New TerritoriesY <strong>development</strong> - village floodprotection for Tin Shui WaihinterlandMain drainage channels forNgau Tarn Mei707 Main drainage channels forY Ngau Tam Mei (phase 1)707 Main drainage channels forY Ngau Tam Mei (phase 2)707 Village flood protection forY Yuen Long, ICam Tin and NgauTam Mei, North West NewTerritories707 Main drainage channels for San¥ Tin, North West NewTerritoriesExpenditure $MCurrent Up toEstimate 31/3/92130.00160.6877.32312,00170.001992/931993/941994/953.005.003.001.001995/9612.0050.0811.9214.0037.001996/9716.0047.6020.4022.0052.00Programme tentative over this period1997/98 1998/9934.00 34.0058.0030.00 15.0056.00 56.0045.00 35.001999/00 2000/0131.0046.00 46.002001/0269.00Later/Cont.RemarksPackage Total850.00,.-.-12.00125.00158.00223.00140.0077.0046.0069.00—North West NTPackage 7Part 6Page 6.79


KEY TO PART 6Policy SecretaryDirector of Regional ServicesDirector of Territory DevelopmentRegional CouncilRegistrar, Supreme CourtSecretary for Economic ServicesSecretary for Education and ManpowerSecretary for Home AffairsSecretary for Health and WelfareSecretary for Planning, Environmentand LandsSecretary for SecuritySecretary for TransportSecretary for TreasurySecretary for WorksUrban CouncilS for SS forTS for TsyS forWUCArchitectural Services DepartmentBuildings and Lands DepartmentCivil Engineering DepartmentDrainage Services DepartmentElectrical and Mechanical Services DepartmentEnvironmental Protection DepartmentGeotechnical Engineering Office, CEDHousing DepartmentHong Kong Housing SocietyHighways DepartmentMass Transit Railway CorporationRailway Division, HyDRegional Services DepartmentTransport DepartmentTerritory Development DepartmentWater Supplies DepartmentUrban Services DepartmentArchSDBLDCEDDSDEMSDEPDGEOHDHKHSHyDMTRCRDRSDTDTDDWSDUSDProgramme ElementConstructionDefinition of PWP CategoriesCategory A - Projects which are ready in all respects for tenders to be invited and for construction works to proceed (savefor projects directly injected in Category A), and which have approved project estimates.Category B - Projects which are earmarked resources in the latest RAS exercise, or which have been chosen for a start in aprevious Public Works Sub-Committee (PWSC) Annual Review but are not yet in Category A.Category C - Projects which are accepted in principle to enable client departments to plan their requirements.Category D - Projects estimated to cost up to the prevailing financial ceiling for Category D projects (which is currently setat $10 million) on which work may proceed and expenditure may be incurred, subject to the availability of funds in the blockvotes provided for the purpose.Definition of RCCWP CategoriesCategory I - Projects which are ready in all respects, the costs of which have been approved and which may proceed totenders and construction; and projects under construction.Category II - Projects for which sketch design and rough indication of costs (RIC) have been approved and for which siteinvestigation works, detailed design (including working drawings) and preparation of tender documents may proceed.Category III - Projects for which project details, in the case of building projects, and planning briefs, in the case oflandscaping projects, have been approved and for which sketch design is under preparation by works agencies.Category IV - Projects for which preliminary justification has been accepted but project details have yet to be worked out.


NORTH WEST NEW TERRITORIES DEVELOPMENT OFFICE-TIN SHUI WAI/YUEN LONG DEVELOPMENT PROGRAMME1993 EDITIONAPPENDIX I - INDEX OF PROJECTS ARRANGEDBY YEAR OF COMMENCEMENTI. 1


APPENDIX IINDEX OF PROJECTS ARRANGED BY YEAR OF COMMENCEMENTYUEN LONGPROJECTS IN HAND OR TO START IN 1992/1993Item No.& Cat.DescriptionCompletionDatePart 6Page No,CIVIL ENGINEERINGQ41CD{uen Long nullahs - environmental improvementsCivil works - YL19/89 (part)E&M works (1008/EM/90)Landscaping and miscellaneous works1992/93 1st Qtr1991/92 4th Qtr1993/94 4th Qtr6.186.IB6.18105CLAYuen Long <strong>development</strong> f package 3 f engineeringworksLandscaping and miscellaneous1990/91 4th Qtr6.2106CLAYuen Long <strong>development</strong>, package 4, engineeringworksLandscaping and miscellaneous1991/92 4th Qtr6.5107CLAYuen Long <strong>development</strong>, package 7, engineeringworksLandscaping and miscellaneous1990/91 4th Qtr6.14108CLAYuen Long <strong>development</strong>, package 5, engineeringworksLandscaping and miscellaneous1990/91 4th Qtr6.8109CLAYuen Long <strong>development</strong>, package 6, engineeringworksLandscaping and miscellaneous1990/91 4th Qtr6.11111CLAYuen Long <strong>development</strong>, package 8, engineeringworks, stage ISite formation, access roads and main drainage640/801984/85 2nd Qtr6.16Page 1.2


APPENDIX IINDEX OF PROJECTS ARRANGED BY YEAR OF COMMENCEMENTYUEN LONGPROJECTS IN HAND OR TO START IN 1992/1993Item No.& Cat.DescriptionCompletionDatePart 6Page No.CIVIL ENGINEERING(cont'd)029DSAYuen Long full sewage treatment plant1992/93 1st Qtr6.11HIGHWAYS040TBAYuen Long <strong>development</strong>, package 8 ~ pedestrian andcycle bridgeBridge works NTDB 14/841987/88 1st Qtr6.16059TBANullah bridge at Ma Mul Road and Ping Wul Street,Yuen LongBrldgeworks and road works - NTDB 23/851988/89 2nd Qtr6.3Landscaping and miscellaneous works1990/91 3rd Qtr6.3061TBAPedestrian and cycle bridge, Long Ping - Yeung UkEngineering works - YL19/89 (part)1991/92 4th Qtr6.16Landscaping and miscellaneous works1992/93 3rd Qtr6.16084TBAPedestrian and cycle bridge, Yuen Long, Phase IBridge ^P'1989/90 1st Qtr6.19108THAYuen Long northern bypass, grade separation ofeastern junctionLandscaping and miscellaneous works1990/91 3rd Qtr6.8145THAYuen Long northern bypass, eastern junctionImprovements - roadworksRoadworks, bridges H&K 3/NTDB/82 (part)1985/86 3rd Qtr6.5Page J*3


APPENDIX IINDEX OF PROJECTS ARRANGED BY YEAR OF COMMENCEMENTYUEN LONGPROJECTS IN HAND OR TO START IN 1992/1993Item No*& Cat.DescriptionCompletionDatePart 6Page No.HIGHWAYS(cont'd)177THAImprovements to Yuen Long nullah bunds, stage III1990/91 3rd Qtr6.19-034TIAPublic Light Bus terminus, Fook Hong Street, YuenLongEngineering works - NTDB 24/851988/89 2nd Qtr6.5COMMUNITY FACILITIES052EPATwo standard primary schools in Long Ping Estate,Yuen LongTwo standard primary schools in Long Ping Estate,Yuen Long1988/89 4th Qtr6.17Others/con<strong>tin</strong>gencies6.17053EPAPrimary school in Shui Pin Wai, Yuen LongPrimary school in Shui Pin Wai, Yuen Long6.17057EPAPrimary school, package 6, Yuen LongOther/con<strong>tin</strong>gencies6.1106 SEPAPrimary school, package 5, Yuen LongOther/con<strong>tin</strong>gencies6.9081ESASecondary school, package 6, Yuen LongSecondary school, package 6, Yuen Long1991/92 2nd Qtr6.11Other/contigencies6.11Page 1.4


APPENDIX IINDEX OF PROJECTS ARRANGED BY YEAR OF COMMENCEMENTYUEN LONGPROJECTS IN HAND OR TO START IN 1992/1993Item No.& Cat.DescriptionCompletionDatePart 6Page No.COMMUNITY FACILITIES(cont'd)082ESAOne standard secondary school, package 6, YuenLongOne secondary school, package 6, Yuen Long1989/90 2nd Qtr6.12Others/con<strong>tin</strong>gencies6.12026KAAMarket, liJbrary, squash courts and office at TalKlu, Yuen Long TownOthers/Con<strong>tin</strong>gencies6.6026MCAClinic, package 5, Yuen LongClinic, package 5, Yuen Long1989/90 4th Qtr6.9020RM.AReprovlslonlng of Hop Ylck private market and YuenLong hawker bazaarOthers/con<strong>tin</strong>gencies6.6156ROALocal open space, package 6, Yuen LongLocal open space, package 6, Yuen LongpaymentMiscellaneous- contract 1990/91 4th Qtr1990/91 4th Qtr6.126:12-157ROAYuen Long Town ParkYuen Long town park - contract paymentLetter of intent IssuedMiscellaneous1991/92 4th Qtr.1991/92 4th Qtr1991/92 4th Qtr6.126.126.12Page 1.5


APPENDIX IINDEX OF PROJECTS ARRANGED BY YEAR OF COMMENCEMENTYUEN LONGPROJECTS IN HAND OR TO START IN 1992/1993Item No.& Cat.DescriptionCompletionDatePart 6Page No.COMMUNITY(cont'd)FACILITIES246ROAocal open space, site No. 1, package 7 , Yuen LongOthers/Con<strong>tin</strong>gencies6.14250ROAYuen Long Town SquareOthers/Con<strong>tin</strong>gencies6.6255ROALocal Open space at On Ring Road, Yuen LongOthers/Con<strong>tin</strong>gencies6.3033RSAYuen Long swimming pool and gardenOthers/Con<strong>tin</strong>gencies6.3RC LEISURE SERVICES097LSILocal open space f package 3 f phase II, Yuen LongLocal open space, package 3, phase II, Yuen LongOn costs1991/92 3rd Qtr6.46.4098LSILocal open space, package 4, phase II, Yuen LongLocal open space, package 4, phase II, Yuen LongOn costs1991/92 3rd Qtr6.76.7Page 1.6


APPENDIX IINDEX OF PROJECTS ARRANGED BY YEAR OFCOMMENCEMENTYUEN LONGPROJECTS IN HAND OR TO START IN 1992/1993Item No.& Cat.DescriptionCompletionDatePart 6Page No.RC LEISURE SERVICES(cont'd)168LSIocal open space, package 7, Yuen LongLocal open space, package 7, Yuen LongOn costs1991/92 3rd Qtr1992/93 3rd Qtr6.156.15169LSILocal open space, package 5, Yuen LongLocal open space, package 5, Yuen LongOn costs1991/92 4th Qtr1991/92 4th Qtr6.106.10Paae 1.7


APPENDIX IINDEX OF PROJECTS ARRANGED BY YEAR OF COMMENCEMENTYUEN LONGPROJECTS TO START IN 1993/1994Item No.Cat.DescriptionCompletionDatePart 6Page No.CIVIL ENGINEERING234CLBYuen Long East public housing site - engineeringworksStage I - footbridge1996/97 3rd Qtr 6.18278CLBKau Hui <strong>development</strong> - engineering works, area 16,Yuen LongSite formation, roads and drainage worksLandscaping and miscellanous works1997/98 1st Qtr1997/98 1st Qtr6.206.20RC LEISURE SERVICES10SLSIIILocal open space, package 5 - remainder, Yuen LongOn costs1995/96 3rd Qtr 6.9Page I.B


APPENDIX IINDEX OF PROJECTS ARRANGED BY YEAR OFCOMMENCEMENTYUEN LONGPROJECTS TO START IN 1994/1995Item No.& Cat.DescriptionCompletionDatePart 6Page No*CIVIL ENGINEERING234CLBYuen Long East public housing site - engineeringworksLandscaping and miscellaneous works1998/99 3rd Qtr 6.18HIGHWAYS058TBBYuen Long <strong>development</strong>, Long Ping footbridgeextension across On Ning Road and Castle Peak RoadBridge L extension1996/97 4th Qtr6.2COMMUNITYFACILITIES004CEIVYuen Long Civic Centre, package 6, Yuen Long1996/97 3rd Qtr6.11RC LEISURE SERVICES096LSIII105LSIIIIndoor recreation centre (type C), package 6 , YuenLongLocal open space, package 5 - remainder, Yuen LongLocal open space, package 5 - remainder, Yuen Long1996/97 2nd Qtr 6.131995/96 3rd Qtr 6.9Page 1.9


APPENDIX IINDEX OF PROJECTS ARRANGED BY YEAR OF COMMENCEMENTYUEN LONGPROJECTS TO START IN 1995/1996Item No.& Cat.DescriptionCompletionDatePart 6Page No.CIVIL ENGINEERING028CGBYuen Long south western extension - siteformation/ roads and drainage worksYuen Long south western extension - siteformation, roads and drainage works1999/00 3rd Qtr6.23105CLAYuen Long <strong>development</strong>, package 3 f engineeringworksFormation of GIC site north of Yuen Long westernroundabout1996/97 3rd Qtr6.2108CLAYuen Long <strong>development</strong>, package 5, engineeringworksTai Kiu Village - including formation for schoolsite • ' . , • '; - •.: • ' • • ' ' ' .1997/98 2nd Qtr6.8234CLBYuen Long East public housing siteworks-> engineeringStage II - site formation, roads and drainageworks1998/99 3rd Qtr6.18HIGHWAYS05 STBBYuen Long <strong>development</strong>, Long Ping footbridgeextension across On Ning Road and Castle Peak RoadLandscaping and miscellaneous works1996/97 4th Qtr6.2COMMUNITY FACILITIES026MCAClinic, package 5, Tuen LongOthers/con<strong>tin</strong>gencies1995/96 4th Qtr6.9Page I.10


APPENDIX IINDEX OF PROJECTS ARRANGED BY YEAR OF COMMENCEMENTYUEN LONGPROJECTS TO START IN 1995/1996Item No.& Cat.DescriptionCompletionDatePart 6Page No.RC LEISURESERVICES005LSIVDistrict games complex and district open space,area 12, Yuen Long1997/98 2nd Qtr6.19Page I.11


APPENDIX IINDEX OF PROJECTS ARRANGED BY YEAR OF COMMENCEMENTYUEN LONGPROJECTS TO START IN 1996/1997Item No.& Cat.DescriptionCompletionDatePart 6Page No.CIVIL ENGINEERING028CGBYuen Long south western extension - siteformation, roads and drainage worksLandscaping and miscellaneous works1999/00 3rd Qtr 6.23012EH\IVRC ENVIRONMENTAL HYGIENECooked food centre in package 7, Yuen Long1997/98 2nd Qtr 6.14159LSIVRC LEISURE SERVICESIndoor recreation centre type C, Yuen Long eastestate, Yuen Long1998/99 2nd Qtr 6.19Page 1.12


APPENDIX IINDEX OF PROJECTS ARRANGED BY YEAR OF COMMENCEMENTYUEN LONGPROJECTS TO START AFTER 1996/1997Item No.Cat.DescriptionCompletionDatePart 6Page No,CIVIL ENGINEERING027 CGCYuen Long south eastern extension - siteformation, roads and drainage worksYuen Long south eastern extension - siteformation, roac? and drainage works2001/02 2nd Qtr6.21Landscaping and mlscellanous works2001/02 2nd Qtr6.21COMMUNITY FACILITIES061EPCPrimary school, package 3 f Yuen Long1999/00 2nd Qtr6.3N.I.Primary school, area 12, Yuen Long1999/00 1st Qtr6.19N.I.Primary school In Yuen Long south easternextension2000/01 1st Qtr6.21N.I.Primary school In Yuen Long south westernextension1999/00 1st Qtr6.23N.I.Secondary school In Yuen Long south easternextension2000/01 1st Qtr6.21N.I.Secondary school In Yuen Long south westernextension1999/00 1st Qtr6.23N.I.Neighbourhood community centre In Yuen Long southeastern extension1999/00 3rd Qtr6.21N.I.Sheltered workshop In Yuen Long south easternextension1999/00 3rd Qtr6.21N.I.Neighbourhood community centre In Yuen Long southwestern extension1998/99 3rd Qtr6.23Page 1*13


APPENDIX IINDEX OF PROJECTS ARRANGED BY YEAR OF COMMENCEMENTYUEN LONGPROJECTS TO START AFTER 1996/1997Item No.& Cat.DescriptionCompletionDatePart 6Page NRC LEISURE SERVICESN.I.Local open space, package 7 , phase III f Yuen Long1998/99 1st Qtr6.15N.I.District open space, south eastern extension, Yuen,ong2001/02 2nd Qtr6.22N.I.open space, south eastern extension, Yuen2001/02 2nd Qtr6.22N.I,Indoor recreation centre in Yuen Long south westenextension1998/99 4th Qtr6.24N.I.District and local open spaces, south westernextension, Yuen LongLocal open space, south western extension, YuenLong2001/02 2nd Qtr6.24District open space, south western extension, YuenLong2002/03 1st Qtr6.24N.I.IVLocal open space, package 7 - remainder, Yuen Long1998/99 2nd Qtr6.15N.I.IVDistrict open space, Kau Hui, Yuen Long1999/00 2nd Qtr6.20Page 1.14


APPENDIX IINDEX OF PROJECTS ARRANGED BY YEAR OF COMMENCEMENTTIN SHUT WAIPROJECTS IN HAND OR TO START IN 1992/1993Item No.& Cat.DescriptionCompletionDatePart 6Page No.CIVIL ENGINEERING020CGACompletion of Hung Tin RoadSouth-Western access road, Contract No. NTDB 12/84Junction Mn39 improvementT±n Shu± Wad. west accessMiscellaneousAdditional fund other than inflation, up to 31.3.921986/87 4th Qtr1992/93 1st Qtr1995/96 2nd Qtr6.276.276.276.276.27121CLATin Shui Wai <strong>development</strong> - design andinvestigationSite investigation6.26270CLATin Shui Wai <strong>development</strong>, package 3, part IIA -village flood protectionTin Shui Wai <strong>development</strong> - package 3, part JXA -village flood protection - contract paymentVillage flood protection f phase IVillage flood pumping stations f phase 1MiscellaneousAdditional fund other than inflation f up to 31.3.92 . . •• • ; .' • • • • •1991/92 1st Qtr1990/91 1st Qtr1988/89 4th Qtr6.286.286.286.286.28298CLATin Shui Wai <strong>development</strong>, package 3? part II, landformation and main drainage - initial <strong>development</strong>zoneTin Shui Wai <strong>development</strong> package 3, part JX - landformation and main drainage - initial <strong>development</strong>zone - contract paymentMiscellaneous1991/92 1st Qtr1991/92 1st Qtr6.296.29Page I.IS


APPENDIX IINDEX OF PROJECTS ARRANGED BY YEAR OFCOMMENCEMENTTIN SHUI WAIPROJECTS IN HAND OR TO START IN 1992/1993Item No.& Cat.DescriptionCompletionDatePart 6Page No,298CLA(cont'd)CIVIL ENGINEERING(cont'd)Tin Shui Wai <strong>development</strong>, package 3, part II, landformation and main drainage - initial <strong>development</strong>zoneAdditional fund other than inflation, up to 31*3.926.29312CLATin Shui Wai <strong>development</strong>, package 3, part II, landformation and main drainage - land bankTin Shui Wai <strong>development</strong> package 3, part II - landformation and main drainage - land bank - contractpayment1991/92 1st Qtr6.29327CLATin Shui Wai <strong>development</strong> -roads Dl (west) and L9and formation of LRT reserve, phase ITin Shui Wai <strong>development</strong> - roads Dl (west) and L9and formation of LRT reserve,phase I (additionalwork)Roads and drainsLetter of intent issued to HyDLetter of intent issued to WSDLetter of intent issued to EMSDMiscellaneousAdditional fund other than inflation, up to 31.3.921991/92 4th Qtr1991/92 2nd Qtr1991/92 2nd Qtr1991/92 4th Qtr6.316.316.316.316.316.316.31334CLATin Shui Wai <strong>development</strong>, package 4, engineeringinfrastructure, phase IIRoads & drainsMiscellaneous1992/93 3rd Qtr1994/95 4th Qtr6.326.32Page 1.16


APPENDIX IINDEX OF PROJECTS ARRANGED BY YEAR OF COMMENCEMENTTIN SHUT WAIPROJECTS IN HAND OR TO START IN 1992/1993Item No.& Cat.DescriptionCompletionDatePart 6Page No.CIVIL ENGINEERING(cont'd)348CLATin Shu± Wai <strong>development</strong>, package 5, engineeringinfrastructure, phase ITin Shui Wai devlopment f package 5 f engineeringInfrastructure, phase ILandscaping and miscellaneousTin Shui Wai <strong>development</strong>, package 5, engineeringinfrastructure, phase IILandscaping and miscellaneousTin Shui Wai devlopment, package 6, engineeringinfrastructure and footbridge L4/F1 (Contract YL20/90 (part))Landscaping and miscellaneous1993/94 3rd Qtr1993/94 3rd Qtr1993/94 2nd Qtr1993/94 2nd Qtr1994/95 3rd Qtr1994/95 3rd Qtr6.396.396.396.396.396.40375CLATin Shui Wai <strong>development</strong>, package 6, EngineeringInfrastructure, Phase I and Phase IITin Shui Wai <strong>development</strong>, package 6, EngineeringInfrastructure, Phase 1Additional fund other than inflation, up to 31.3*92 • . • • .. ' ' ,. • '• . • . '• •.'1993/94 3rd Qtr6.456.45378CLATin Shui Wai <strong>development</strong>, package 5, engineeringinfrastructure for Tin Shui Wai Town Lot No*3Infrastructure in Area 19 - engineering worfes-1993/94 1st Qtr6.40389CLAInfrastructure in area 241994/95 4th Qtr6.40Page 1*17


APPENDIX IINDEX OF PROJECTS ARRANGED BY YEAR OF COMMENCEMENTTIN SHUT WAIPROJECTS IN HAND OR TO START IN 1992/1993Item No.& Cat.DescriptionCompletionDatePart 6Page No.CIVIL ENGINEERING(cont'd)390CLAT±n Shui Wai <strong>development</strong>, package 5, engineeringinfrastructure, phase IIRoads L4 (remainder) , L7 and transport interchangeat area 33, Tin Shui Wai1996/97 2nd Qtr6.40HIGHWAYS355CLATin Shui Wai <strong>development</strong>, package 4, engineeringinfrastructure for Tin Shui Wai Town Lot No. 1Infrastructure area 8 - engineering works1992/93 1st Qtr6.33368CLATin Shui Wai <strong>development</strong>, package 4, engineeringinfrastructure for Tin Shui Wai Town Lot No. 2Infrastructure area 11 - engineering works1992/93 4th Qtr6.33396CLATin Shui Wai <strong>development</strong>, package 6, engineeringinfrastructure for Tin Shui Wai Town Lot Nos. 5and 6Tin Shui Wai <strong>development</strong>, package 6, engineeringinfrastructure in Area 27, TSWTL 51995/96 2nd Qtr6.46106TBATin Shui Wai <strong>development</strong>, package 5, Footbridge L4/FlTin Shui Wai <strong>development</strong> package 5, Footbridge L4 /Fl1993/94 2nd Qtr6.41WATERWORKSFresh and flushing water reticulation systems forphase I of Tin Shui Wai <strong>development</strong> (stores)Fresh and flushing water reticulation systems forphase I of Tin Shui Wai <strong>development</strong> (part)Others/Con<strong>tin</strong>gencies1993/94 4th Qtr6.346.34Page 1.18


APPENDIX IINDEX OF PROJECTS ARRANGED BY YEAR OFCOMMENCEMENTTIN SHUT WAIPROJECTS IN HAND OR TO START IN 1992/1993Item No.& Cat.DescriptionCompletionDatePart 6Page No.129WFAWATERWORKS(cont'd)Trunk main from An Tau to Yuen Long and watersupply to phase I of Tin Shui Wai <strong>development</strong>1993/94 4th Qtr 6.34084BFA132EPACOMMUNITY FACILITIESSub-divisional fire station and ambulance depot/area 4, Tin Shui WaiThree primary schools, area 5, Tin Shui Wai1991/92 3rd Qtr 6.34Three primary schools, area 5, Tin Shui Wai1992/93 4th Qtr6.34Three primary schools, area 5, Tin Shui Wai -additional work6.34Additional fund other than inflation, up to 31.3.926.34133EPAPrimary school, area 8, Tin Shui Wai1991/92 3rd Qtr6.35154EPATwo standard primary schools, area 16, Tin ShuiWaiTwo standard primary schools, area 16, Tin ShuiWai1993/94 2nd Qtr6.41Others/con<strong>tin</strong>gencies6.41167EPAPrimary school, area 19, Tin Shui Wai1994/95 4th Qtr6.41079ESAStandard secondary school in area 11, Tin Shui Wai1994/95 1st Qtr6.35Page 1.19


APPENDIX IINDEX OF PROJECTS ARRANGED BY YEAR OF COMMENCEMENTTIN SHUI WAIPROJECTS IN HAND OR TO START IN 1992/1993Item No.& Cat.DescriptionCompletionDatePart 6Page No.COMMUNITY FACILITIES(cont'd)096ESATwo secondary schools, area 5, Tin Shul Wai1993/94 2nd Qtr6.35097 ESASecondary school, area 8, Tin Shul WaiSecondary school, area 8, Tin Shul Wai1992/93 1st Qtr6.35Others/con<strong>tin</strong>gencies6.35124ESATwo standard secondary schools, area 16, Tin ShulWaiTwo standard secondary schools, area 16, Tin ShulWai1992/93 2nd Qtr6.41Others/con<strong>tin</strong>gencies6.41122LPADivisional police station, area 4, Tin Shul WaiDivisional police station, area 4, Tin Shul Wai1992/93 1st Qtr6.35Others/con<strong>tin</strong>gencies6.35044MCAUrban clinic, area 26, Tin Shul Wai1992/93 4th Qtr6.35082SCAEstate commumlty centre. Tin Ylu estate, area 5,Tin Shul Wai1991/92 4th Qtr6.36098SCANeighbourhood community centre, area 16, Tin ShulWai1993/94 2nd Qtr6.42111SCASocial welfare facility (children & youth centre),area 8, Tin Shul Wai1992/93 1st Qtr6.36Page 1.20


APPENDIX IINDEX OF PROJECTS ARRANGED BY YEAR OF COMMENCEMENTTIN SHUI WAIPROJECTS IN HAND OR TO START IN 1992/1993Item No.& Cat.DescriptionCompletionDatePart 6Page No.COMMUNITY FACILITIES(cont'd)124SCAChildren, youth centre and day nursery, area 24,Tin Shul Wai1993/94 3rd Qtr 6.42338CLADRAINAGETin Shul Wai <strong>development</strong>, village floodprotection, phase IIIVillage flood protection, phase III (Sheung CheungWai and Ha Mel San Tsuen)1991/92 4th Qtr 6.30RC LEISURE SERVICES108LS\I|| HOLSIndoor recreation centre and swimming poolcomplex, area 14, Tin Shul WaiSports ground/ area 12, Tin Shul Wai1993/94 3rd Qtr1993/94 2nd Qtr6.436.43149LSIOpen space f area 3A, Tin Shul WaiOpen space, area 3A f Tin Shul Wai1992/93 2nd Qtr6.36On costs1992/93 2nd Qtr6*36150LSIOpen space, area 9, Tin Shul WaiOpen space, area 9, Tin Shul Wai1991/92 4th Qtr6.36160LS•III'Local open space, area 1, Tin Shul WaiOn costs1994/95 1st Qtr 6.37s1-m * -«•Page 1*21


APPENDIX IINDEX OF PROJECTS ARRANGED BY YEAR OFCOMMENCEMENTTIN SHUI WAIPROJECTS IN HAND OR TO START IN 1992/1993'tern No.& Cat.DescriptionCompletionDatePart 6Page No.RC LEISURE SERVICES(cont'd)217LSIIIDistrict park - phase I, area 22, Tin Shul Wai (RCortlon)On cost1994/95 4th Qtr6.43272LSIIIDistrict Park - phase I, area 22, Tin Shul Wai(sponsored portion)District park - phase I, area 22, Tin Shul Wai(sponsored area)1993/94 1st Qtr6.43RC SUPPORTING SERVICES003SPIRSD Yuen Long vehicle depot1991/92 4th Qtr6.44PUBLIC HOUSINGPublic housing, area 5, Tin Shul WaiTin Ylu Estate phase 1, area 51992/93 1st Qtr6.38Tin riii Estate phase 2, area 51992/93 4th Qtr6.38Tin Yiu Estate phase 3, area 51992/93 3rd Qtr6.38Tin Ylu Estate phase 4 (HOS), area 51992/93 2nd Qtr6.38Private housing, areas 5, 8 & 11, Tin Shul WaiTin Shul Wai Town Lot No. 1, area 81991/92 4th Qtr6.38Tin Shul Wai Town Lot No. 2, area 111992/93 4th Qtr6.38Page 1.22


APPENDIX IINDEX OF PROJECTS ARRANGED BY YEAR OF COMMENCEMENTTIN SHUI WAIPROJECTS IN HAND OR TO START IN 1992/1993Item No.& Cat.DescriptionCompletionDatePart 6Page No.PUBLIC HOUSING(cont'd)Public housing, area 16 f Tin Shul WaiTin Shul Estate phase l f area 16Tin Shul Estate phase 2, area 16Tin Shul Estate phase 3, area 16Tin Shul Estate phase 4, area 16Private housing, areas 19, 23 & 24, Tin Shul WaiRl housing, area 24; TSW TL 7Rl housing, area 19; TSW TL 3Private housing, areas 20, 27 & 28, Tin Shul WaiRl housing, area 27; TSW TL 51992/93 4th Qtr1993/94 3rd Qtr1992/93 4th Qtr1993/94 2nd Qtr1994/95 1st Qtr1993/94 1st Qtr1996/97 3rd Qtr6.446.446.446.446.446.446.48Page 1.23


APPENDIX IINDEX OF PROJECTS ARRANGED BY YEAR OF COMMENCEMENTTIN SHUI WAIPROJECTS TO START IN 1993/1994Item No.& Cat.DescriptionCompletionDatePart 6Page No.CIVIL ENGINEERING315CLBTin Shui Wai <strong>development</strong>, package 5, engineeringinfrastructure - remainderInfrastructure in area 23Remainder1995/96 4th Qtr1996/97 4th Qtr6.396.39375CLATin Shui Wai <strong>development</strong>, package 6, EngineeringInfrastructure, Phase I and Phase IITin Shui Wai <strong>development</strong>, package 6, EngineeringInfrastructure, Phase II1994/95 3rd Qtr6.45HIGHWAYS192CLBTin Shui Wai <strong>development</strong> - remaining worksTin Shui Wai <strong>development</strong>, package 6, engineeringinfrastructure in Area 20, TSWTL 4(N)1995/96 4th Qtr6.45396CLATin Shui Wai <strong>development</strong>, package 6, engineeringinfrastructure for Tin Shui Wai Town Lot Nos. 5and 6Tin Shui Wai <strong>development</strong>, package 6, engineeringinfrastructure in Area 28, TSWTL 61995/96 3rd Qtr6.46COMMUNITY FACILITIES16 SEPBPrimary school, area 24, Tin Shui Wai1995/96 1st Qtr6.41HIESBSecondary school, area 14, Tin Shui Wai1995/96 1st Qtr6.41Page 1.24


APPENDIX IINDEX OF PROJECTS ARRANGED BY YEAR OFCOMMENCEMENTTIN SHUT WAIPROJECTS TO START IN 1993/1994Item No.& Cat.DescriptionCompletionDatePart 6Page No.COMMUNITY FACILITIES(cont r d)04 SETAOne special school for mildly handicappedchildren, area 14 f Tin Shu 1 Wai1994/95 2nd Qtr 6.42150LSIRC LEISURE SERVICESOpen space, area 9, Tin Shul WaiOn costs1993/94 4th Qtr6.36160LSIIILocal open space, area 1, Tin Shul WaiLocal open space, area 1, Tin Shul Wai1994/95 1st Qtr6.37216LSIVOpen space, area 34, Tin Shul WaiOpen space, area 34, Tin Shul WaiOn costs1993/94 3rd Qtr1993/94 3rd Qtr6.376.37217LSIIIDistrict park - phase I, area 22, Tin Shul Wai (RCPortion)District park - phase I, area 22, Tin Shul Wai (RCportion)1994/95 4th Qtr6.43257LSIVDistrict park - phase II, area 22, Tin Shul WaiOn costs1996/97 1st Qtr6.47272LSIIIDistrict Park - phase I f area 22, Tin Shul Wai(sponsored portion)On costs1993/94 4th Qtr6.43Page 1.25


APPENDIX IINDEX OF PROJECTS ARRANGED BY YEAR OFCOMMENCEMENTTIN SHUT WAIPROJECTS TO START IN 1993/1994Item No.& Cat.DescriptionCompletionDatePUBLIC HOUSINGPrivate housing, areas 19, 23 & 24, Tin Shul WaiCommercial/residential housing, area 23; TSW TL4(part)1995/96 3rd Qtr 6.44Private housing, areas 20, 27 & 28, Tin Shul WaiCommercial/residential housing/ area 20; TSW TL4(part)Rl housing, area 28; TSW TL 6Public housing, area 13, Tin Shul WaiTin Shul Wai Area 13, Phase 11995/96 3rd Qtr1996/97 4th Qtr1997/98 3rd Qtr6.486.486.38Page 1.26


APPENDIX IINDEX OF PROJECTS ARRANGED BY YEAR OF COMMENCEMENTTIN SHUI WAIPROJECTS TO START IN 1994/1995Item No.& Cat.DescriptionCompletionDatePart 6Page No.CIVIL ENGINEERING227 CLBTin Shul Wai <strong>development</strong>, package 3, part II -village flood protection works - remainderVillage flood protection works - remainderLandscaping & miscellaneousVillage flood protect works - remainder(additional work)Additional fund other than Inflatlont up to 31.3.921997/98 4th Qtr1997/98 4th Qtr1997/98 4th Qtr1997/98 4th Qtr6.276.276.286.28390CLATin Shul Wai <strong>development</strong>, package 5, engineeringInfrastructure, phase IILandscaping and miscellaneous1996/97 2nd Qtr6.40HIGHWAYS192CLBTin Shul Wai <strong>development</strong> - remaining worksTin Shul Wai <strong>development</strong>, package 6, engineeringInfrastructure - services to town park and squares1995/96 4th Qtr6.45WATERWORKSN.I.Yuen Long Water Supply - Wang Chau ServicesReservoir - Stage II1996/97 4th Qtr6.34COMMUNITY FACILITIESN.I.Area community centre, area 27, Tin Shul Wai1996/97 2nd Qtr6.47Page 1.27


APPENDIX IINDEX OF PROJECTS ARRANGED BY YEAR OF COMMENCEMENTTIN SHUI WAIPROJECTS TO START IN 1994/1995tern No.& Cat.DescriptionCompletionDatePart 6Page No.RC CULTURE & ENTERTAINMENTN.I.Cultural centre, area 33A, Tin Shul Wai1995/96 4th Qtr6.47RC LEISURE SERVICES151LSIVOpen space, area 10, Tin Shul WaiOn costs1996/97 2nd Qtr6.37152LSIVOpen space, area 21, Tin Shul WaiOn costs1996/97 2nd Qtr6.37183LSIVOpen space, area 15, Tin Shul WaiOn costs1996/97 3rd Qtr6.43257LSIVDistrict park - phase II, area 22, Tin Shul WaiDistrict park -phase II, area 22, Tin Shul Wai1996/97 1st Qtr6.47N.I.Open spaces, area 25, Tin Shul WaiOpen space, area 25, Tin Shul Wai1995/96 2nd Qtr6.48Open space, area 25A, Tin Shul Wai1995/96 2nd Qtr6.48Open space, area 2SB, Tin Shul Wai1995/96 2nd Qtr6.48PUBLIC HOUSINGPublic housing, area 13, Tin Shul WaiTin Shul Wai Area 13, Phase 21997/98 4th Qtr6.38Page 1.28


APPENDIX IINDEX OF PROJECTS ARRANGED BY YEAR OFCOMMENCEMENTTIN SHUT WAIPROJECTS TO START IN 1995/1996Item No.Cat*DescriptionCompletionDatePart 6Page No,HIGHWAYSInfrastructure for Tin Shul Wai Area 13 andfootbridges between Areas 5/13 & 16/221997/98 3rd Qtr6.32192CLBTin Shul Wai <strong>development</strong> - remaining worksTin Shul Wai <strong>development</strong> - package 6 f engineeringInfrastructure In <strong>development</strong> zoneTin Shul Wai <strong>development</strong> - package 6, engineeringInfrastructure, Initial works In reserve zone1998/99 3rd Qtr2000/01 3rd Qtr6.466.4630SCLBTin Shul Wai <strong>development</strong>/ package 4, engineeringInfrastructure - remainderInfrastructure In area 11997/98 4th Qtr6.32Infrastructure In area 31999/00 1st Qtr6.32RC LEISURE SERVICES069LSIIIIndoor recreation centre (type C), area 2, TinShul Wai1997/98 2nd Qtr6.36151LSIVOpen space, area 10, Tin Shul WaiOpen space, area 10, Tin Shul Wai1996/97 2nd Qtr6.37152LSIVOpen space, area 21, Tin Shul WaiOpen space, area 21, Tin Shul Wai1996/97 2nd. Qtr6.37183LSIVOpen space, area 15, Tin Shul WaiOpen space, area 15, Tin Shul Wai1996/97 3rd Qtr6.43T.29


APPENDIX IINDEX OF PROJECTS ARRANGED BY YEAR OF COMMENCEMENTTIN SHUI WAIPROJECTS TO START IN 1995/1996Item No.& Cat.DescriptionCompletionDatePart 6•Page No.RC LEISURE SERVICES(cont'd)184LSIVDistrict square, area 29, Tin Shu ± Wai.On costs1997/98 4th Qtr6.47Page J.30


APPENDIX IINDEX OF PROJECTS ARRANGED BY YEAR OF COMMENCEMENTTIN SHUT WAIPROJECTS TO START IN 1996/1997Item Ko& Cat.DescriptionCompletionDatePart 6Page No.HIGHWAYS308CLBTin Shui Wai <strong>development</strong>, package 4, engineeringinfrastructure - remainderFootbridge between Areas 1/31998/99 1st Qtr6.32RC LEISURE SERVICES182LSIVIndoor recreation centre (type C), area 14, TinShui Wai1998/99 2nd Qtr6.43184LSIVDistrict square, area 29, Tin Shui WaiDistrict square, area 29, Tin Shui Wai1997/98 4th Qtr 6.47Page 1.31


APPENDIX IINDEX OF PROJECTS ARRANGED BY YEAR OF COMMENCEMENTTIN SHUI WAIPROJECTS TO START AFTER 1996/1997Item No.& Cat.DescriptionCompletionDatePart 6Page No.HIGHWAYS308CLBTin Shu± Wai <strong>development</strong>, package 4, engineeringinfrastructure - remainderFootbridge between Areas 3/52001/02 1st Qtr6,32Dualling of JRoad L52001/02 1st Qtr6.33COMMUNITY FACILITIESN.I.Standard primary school, area 27, Tin Shui Wai1998/99 2nd Qtr6.47N.I.First secondary school, area 27, Tin Shui Wai1999/00 1st Qtr6.42N.I.Second secondary school, area 27, Tin Shui Wai1999/00 1st Qtr6.47024GKCGovernment depot, area 32, Tin Shui Wai1998/99 4th Qtr6.42URBAN & TERRITORY WIDE008GICNew electrical & mechancial sub-workshop & NewTerritories services Yuen Long district vehicledepot1999/00 4th Qtr 6.42Page 1.32


APPENDIX IINDEX OF PROJECTS ARRANGED BY YEAR OF COMMENCEMENTNORTH WEST NTPROJECTS IN HAND OR TO START IN 1992/1993Item No.Cat.DescriptionCompletionDatePart 6Page No.CIVIL ENGINEERING314CLAPing Shan <strong>development</strong>, stage IPing Shan <strong>development</strong>, stage I1993/94 2nd Qtr6.51317CLAYL-TM corridor ~ engineering works at Hung ShuiKiu f stage I, phase I, site formation for schoolsOthers/Con<strong>tin</strong>gencies6.51346CLAYL-TM corridqr - engineering works for commerical/residential area at Hung Shui Kiu, stage I, phase2YL-TM corridor - engineering works for commercial/residential area at Hung Shui Kiu f stage I f phase21991/92 2nd Qtr6.52084DSANorth West New Territories <strong>development</strong> - trunksewers, sewage pumping stations and rising mains -stage I remainder1996/97 3rd Qtr6.76087DSANorth West New Territories <strong>development</strong> - trunksewers, sewage pumping stations and rising mains -stage I (Contract No. NTDB 33/85 (part))1990/91 1st Qtr6.76089DSANorthwest New Territories <strong>development</strong> -trunksewers, sewage pumping stations and rising mains -stage IINorth West New Territories <strong>development</strong> - trunksewers, sewage pumping stations and rising mains -stage II (Contract No. CV/89/12)1991/92 3rd Qtr6.76North West New Territories <strong>development</strong> - trunksewers, sewage pumping stations and rising mains -stage II (Contract No. CV/89/13)1991/92 3rd Qtr6.76North West New Territories <strong>development</strong> - trunksewers, sewage pumping stations and rising mains -stage II (Contract No. 1006/EH/B9)1991/92 3rd Qtr6.77North West New Territories <strong>development</strong> - trunksewers, sewage pumping stations and rising mains -stage II (Contract No. TM 69/88 (part))1991/92 4th Qtr6.77Page 1.33


APPENDIX IINDEX OF PROJECTS ARRANGED BY YEAR OF COMMENCEMENTNORTH WEST NTPROJECTS IN HAND OR TO START IN 1992/1993Item No*& Cat.DescriptionCompletionDatePart 6Page No.CIVIL ENGINEERING(cont'd)090DSANorth West New Territories <strong>development</strong> - sewagetreatment plant (stage 1), effluent tunnel andeffluent outfallContract TM 69/88 - Tunnel, access road and siteformation1992/93 3rd Qtr6.78Contract TM 70/88 .- Submarine outfall to Urmstonroad1992/93 3rd Qtr6.78Miscellaneous1993/94 3rd Qtr6.78Sewage treatment plant1992/93 2nd Qtr6.78328THAYuen Long-Tuen Mun Eastern Corridor and Yuen LongWest Link: site investigations and works1993/94 2nd Qtr6.55HIGHWAYS013HHAFootpath and van tracks in Yeung Uk Tsuen1991/92 4th Qtr6.70014HHAImprovement to Urban fringe and Rural Areas in NewTerritories 1987-88Kam Tsin P/ai - improvement of access road1991/92 3rd Qtr6.70023HHAVillage improvements and <strong>development</strong> schemes in NT: 1992 - 1993 <strong>programme</strong>Pak Nai - improvement of irrigation facilities1993/94 2nd Qtr6.71Water Supply to Sheung & Ha Pak Nai1994/95 2nd Qtr6.71OBOTHANT Circular road improvements, Au Tau to Fan KamRoad - phase I to IV1992/93 4th Qtr6.55Page 1.34


APPENDIX IINDEX OF PROJECTS ARRANGED BY YEAR OF COMMENCEMENTNORTH WEST NTPROJECTS IN HAND OR TO START IN 1992/1993Item No.& Cat.DescriptionCompletionDatePart 6Page No*HIGHWAYS(cont'd)092THAVehicular hoarder link at Lok Ma Chui -consultants fees, investigations and works1991/92 3rd Qtr6.55248THANorth West New Territories <strong>development</strong>. Tin ShuiWai east access and Long Ping Estate linkRoadworks1991/92 4th Qtr6.56Miscellaneous1991/92 4th Qtr6.56249THANorth West New Territories <strong>development</strong> - Yuen Longsouthern bypass1994/95 2nd Qtr6.56308THANorth West New Territories <strong>development</strong> - Tin ShuiWai west accessTin Shui Wai west access1995/96 3rd Qtr6.56351THANorth West New Territories <strong>development</strong> - Yuen Longsouthern bypass, consultants fees andinvestigations1994/95 2nd Qtr6.57475THAImprovement, reconstruction and extension ofvillage access in the N.T. : 1990 - 91 <strong>programme</strong>Mong Tseng Wai, access improvement from Deep BayRoad to Mong Tseng Wai1992/93 1st Qtr6.71484THAImprovement, reconstruction and extension ofvillage access roads in the New Territories: 1991-1992 ProgrammeHung Shui Kiu, Tin Sam Road reconstruction of vantrack1992/93 3rd Qtr6.72Tai Kong Po , provision and improvement of farmaccess1993/94 2nd Qtr6.72Page 1.35


APPENDIX IINDEX OF PROJECTS ARRANGED BY YEAR OF COMMENCEMENTNORTH WEST NTPROJECTS IN HAND OR TO START IN 1992/1993Item No.r Cat.DescriptionCompletionDatePart 6Page No.HIGHWAYS(cont'd)504THAImprovement, reconstruction and extension ofvillage access roads in tne New Territories : 1992<strong>programme</strong>Pavement and footpath at S±k Kong Tsuen, Ha Tsuen,Yuen Long1993/94 1st Qtr6.72Van track and footpath at Wong Nal Tun, Snap PatHeung, Yuen Long1993/94 1st Qtr6.73WATERWORKS047WFAPrincipal distribution system ^between San Tin, SanWai and Kwu Tung1991/92 4th Qtr6.58110WFAWater treatment and transfer facilities at Au Tau,Tuen Long - stage I1993/94 2nd Qtr6.59144WFAWater treatment and tranfer facilities at Au Tau,Yuen Long. Stage 2 -Investigation and design1994/95 2nd Qtr6.59COMMUNITY FACILITIES102ESATwo secondary schools, area 74, Hung Shul Klu,North West New TerritoriesTwo secondary schools, area 74, Hang Shul Klu,NWNT1991/92 2nd Qtr6.64Others/con<strong>tin</strong>gencies6.64103ESASecondary school, Falrvlew Park, North West NewTerritoriesSecondary school, Falrvlew Park, NWNT1989/90 2nd Qtr6.65Others/con<strong>tin</strong>gencies6.65Page 1.36


APPENDIX IINDEX OF PROJECTS ARRANGED BY YEAR OF COMMENCEMENTNORTH WEST NTPROJECTS IN HAND OR TO START IN 1992/1993Item No.Si Cat.DescriptionCompletionDatePart 6Page No.COMMUNITY FACILITIES(cont'd)016HHAImprovement to Urban Fringe and Rural Areas In NewTerritories 1989-90Nam Pin Wai Village Landscape Area1992/93 3rd Qtr6.73DRAINAGE021CDANorth West New Territories <strong>development</strong> - maindrainage channels for Tin Shul Wai hinterlandNorth West New Territories developmtnt - maindrainage channels for Tin Shul Wai hinterland(Contract No. CV/88/01)1992/93 1st Qtr6.60North West New Territories <strong>development</strong> - maindrainage channels for Tin Shul Wai hinterland(Contract No. CV/88/02)1991/92 4th Qtr6.60North West New Territories <strong>development</strong> - maindrainage channels for Tin Shul Wai hinterland(Contract No. CV/89/06)1992/93 2nd Qtr6.60North West New Territories <strong>development</strong> - maindrainage channels for Tin Shul Wai hinterland(Contract No. DR/89/01)1992/93 1st Qtr6.60North West New Territories <strong>development</strong> - maindrainage channels for Tin Shul Wai hinterland -miscellaneous and landscape works6.60138DSAImprovement of sewerage provision to Klu Tau WaiIndustrial area1993/94 4th Qtr6.74015HHAImprovement to Urban Fringe and Rural Areas In NewTerritories 1988-89Tal Kel Leng - drainage Improvement1990/91 3rd Qtr6.74Page 1.37


APPENDIX IINDEX OF PROJECTS ARRANGED BY YEAR OF COMMENCEMENTNORTH WEST NTPROJECTS IN HAND OR TO START IN 1992/1993Item No.& Cat.DescriptionCompletionDatePart 6Page No.DRAINAGE(cont f d)016HHAImprovement to Urban Fringe and Rural Areas ±n NewTerritories 1989-90Chun H±ng Village near Fung Chi Heung, Wang Chau -drainage improvementKau Hui - drainage improvement (phase II)1994/95 4th Qtr1991/92 1st Qtr6.746.74019HHAVillage improvement works and <strong>development</strong> schemesin the N.T. : 1990 - 1991 <strong>programme</strong>Local drainage improvement at Pok Wai1993/94 3rd Qtr6.75020HHAVillage improvement and <strong>development</strong> schemes in theNT : 1991 •- 92 <strong>programme</strong>Tai Kong Po, Provision and improvement of communalirrigation and field drainage facilities1991/92 4th Qtr6.75Page 1.38


APPENDIX IINDEX OF PROJECTS ARRANGED BY YEAR OF COMMENCEMENTNORTH WEST NTPROJECTS TO START IN 1993/1994Item No.& Cat.DescriptionCompletionDatePart 6Page No*HIGHWAYS018HHBVillage Improvement and <strong>development</strong> schemes in theNT1998/99 1st Qtr6.70019HHAVillage Improvement works and <strong>development</strong> schemesIn the N.T. : 1990 - 1991 <strong>programme</strong>Village Improvement works near Lo Uk Tsuen f phaseI - formation of part VEA1993/94 4th Qtr6.70023HHAVillage Improvements and <strong>development</strong> schemes In NT: 1992 - 1993 <strong>programme</strong>Tsat Sing Kong, Improvement of Irrigationfacilities1994/95 1st Qtr6.71446THBImprovement, reconstruction and extension ofvillage access roads In the NT1995/96 4th Qtr6.71475THAImprovement, reconstruction and extension ofvillage access In the N.T. : 1990 - 91 <strong>programme</strong>Village Improvement works near Lo Uk Tsuen, phaseII - construction of access road and carpark1993/94 4th Qtr€.71Village Improvement works near Lo Uk Tsuen, phaseIII •- construction of footpath connection the VEAto Road B161993/94 4th Qtr6.714B4THAImprovement / reconstruction and extension ofvillage access roads In the New Territories: 1991-1992 ProgrammeYuen Kong San Tsuen, reconstruction of van track1993/94 4th Qtr6.72504THAImprovement f reconstruction and extension ofvillage access roads In the New Territories : 1992- 1993 <strong>programme</strong>Reconstruction of van track from Tung Chan Wai toYan Sau Wai, San Tin1993/94 4th Qtr6.72Resurfacing of van track at Fung Kat Heung, KamTin1993/94 4th Qtr6.73Page 1.39


APPENDIX IINDEX OF PROJECTS ARRANGED BY YEAR OF COMMENCEMENTNORTH WEST NTPROJECTS TO START IN 1993/1994Item No.& Cat.DescriptionCompletionDatePart 6Page No.504THA(cont'd)HIGHWAYS(cont'd)Improvement, reconstruction and extension ofvillage access roads in the New Territories : 1992- 1993 <strong>programme</strong>Reconstruction of van track at Hung To Road, ChauTau, San TinTsat Sing Kong, improvement of farm access1994/95 4th Qtr1993/94 3rd Qtr6.736.73WATERWORKS034WFBYuen Long water supply - remaining worksYuen Long water supply - remaining works. Tan K<strong>wai</strong>Tsuen Service Reservoir - Stage I1996/97 1st Qtr 6.58320CLBCOMMUNITY FACILITIESTai Tong East borrow area landscape works1997/98 2nd Qtr 6.60Q43CDBDRAINAGENorth West New Territories <strong>development</strong> - maindrainage channels for Yuen Long and Kam Tin -stage INorth West New Territories <strong>development</strong> -maindrainage channels for Yuen Long and Kam Tin -Stage I (phase 1)North West New Territories <strong>development</strong> - maindrainage channels for Yuen Long and Kam Tin -Stage J (phase 2)1997/98 2nd Qtr1997/98 4th Qtr6*616.61Page 1.40


APPENDIX I'INDEX OF PROJECTS ARRANGED BY YEAR OF COMMENCEMENTNORTH WEST NTPROJECTS TO START IN 1993/1994Item No.& Cat.DescriptionCompletionDatePart 6Page No,109DSB020HHADRAINAGE(cont'd)Provision of sewer and sewage treatment plants Inrural areas In the NTVillage Improvement and <strong>development</strong> schemes In theNT : 1991 - 92 <strong>programme</strong>1998/99 1st Qtr 6.74Tin Ha Road, Ha Tsuen drainage Improvement1994/95 3rd Qtr6.75Mai Po Lung, Local drainage Improvement1994/95 3rd Qtr6.75RC MULTI-FUNCTION001MFIVRegional council complex at Hung Shul Kitz, NWNT1996/97 3rd Qtr6.69Page 1.41


APPENDIX IINDEX OF PROJECTS ARRANGED BY YEAR OF COMMENCEMENTNORTH WEST NTPROJECTS TO START IN 1994/1995Item Wo& Cat.DescriptionCompletionDatePart 6Page tfCIVIL ENGINEERING222CLBYL~TM corridor - engineering works for newresidential areas at Hung Shui Kiu and San HingTsuenYL-TM corridor - engineering works for newresidential areas at San Hing Tsuen1996/97 4th Qtr6.49225CLBYL-^TM corridor - engineer ing works for commercial/residential area at Hung Shui Kiu, Stage II1995/96 3rd Qtr6.50253CLBYL~TM corridor - engineering works for Hung ShuiKiu and Ping ShanYL-TM corridor - engineering works for Hung ShuiKiu1999/00 3rd Qtr6.50290CLBKam Tin rural <strong>development</strong> - engineering works,phase I1996/97 3rd Qtr6.63Q61DSBNorth West New Territories <strong>development</strong> - trunksewers, sewage pumping stations and rising mains -stage III2000/01 2nd Qtr6.76HIGHWAYS275THBPing Ha Road improvement - remaining works1995/96 4th Qtr6.5630BTHA ;; : : : : 'North West New Territories <strong>development</strong> —Wai west accessTin ShuiLandscaping and miscellaneous1996/97 4th Qtr6.56336THBRoad link between the North West New Territoriesand West Kowloon (Route 3) - works for countrypark section and Ting Kau Bridge1998/99 3rd Qtr6.57Page 1.42


APPENDIX IINDEX OF PROJECTS ARRANGED BY YEAR OFCOMMENCEMENTNORTH WEST NTPROJECTS TO START IN 1994/1995Item No.& Cat.DescriptionCompletionDatePart 6Page No.HIGHWAYS(cont'd)484THAImprovement, reconstruction and extension ofvillage access roads in the New Territories: 1991-1992 ProgrammeUpgrading of Shek Wu Tong access roadNgau Tarn Mei access road, phase 11995/96 4th Qtr1995/96 3rd Qtr6.726.72Reconstructionof access road to Fung Kong Tsuen1995/96 2nd Qtr6.72WATERWORKS034WFBYuen Long water supply - remaining worksYuen Long water supply - remaining works. Tan K<strong>wai</strong>Tsuen Service Reservoir - Stage II and additionaltrunk mains1997/98 1st Qtr6.58141WFBAdditional treatment and transfer facilities forNorth Western New TerritoriesAdditional treatment and transfer facilities forNorth Western New Territories (Ngau Tarn MeiTreatment Works -Stage I) (Part A - Design Fees)1994/95 4th Qtr6.59DRAINAGE023CDBNorth West New Territories <strong>development</strong> - villageflood protection for Tin Shui Wai hinterland1999/00 2nd Qtr6.79 ', \02 BCDBMain drainage channels for Ngau Tarn MeiMain drainage channels for Ngau Tarn Mei (phase 1)1997/98 1st Qtr6.79Page 1.43


APPENDIX IINDEX OF PROJECTS ARRANGED BY YEAR OF COMMENCEMENTNORTH WEST NTPROJECTS TO START IN 1994/1995Item No.& Cat.DescriptionCompletionDatePart 6Page No.DRAINAGE(cont'd)030CDBVillage flood protection for Yuen Long, Kam Tinand Wgau Tarn Mei, North West New Territories2001/02 3rd Qtr6.79035CDBMain drainage channels for San Tin, North West NewTerritories1998/99 4th Qtr6.79RC ENVIRONMENTAL HYGIENE019EHIVReprovisioningof Kam Tin Market, NWNT1995/96 1st Qtr 6.67RC LEISURE SERVICES162LSIIILocal open space at Kat Hing Wai, Kam TinOn costs1996/97 3rd Qtr6.67259LSIVLocal open space, Hung Shui Kiu, Phase IIOn costs1998/99 1st Qtr6.53Page 1.44


APPENDIX IINDEX OF PROJECTS ARRANGED BY YEAR OFCOMMENCEMENTNORTH WEST NTPROJECTS TO START IN 1995/1996Item No.& Cat.DescriptionCompletionDatePart 6Page No*CIVIL ENGINEERING207CLBLau Fan Shan <strong>development</strong>, package 4Site formation, roads and drains1999/00 2nd Qtr6.63Sewage pumping station1997/98 3rd Qtr6.63213CLBYL-TM corridor / rural hinterland - engineeringworks for village priority areas (nos. 1-13)1999/00 2nd Qtr6.49222CLBYL-TM corridor - engineering works for newresidential areas at Hung Shul Klu and San HlngTsuenYL-TM corridor - engineering works for newresidential areas at Hung Shul Klu1999/00 2nd Qtr6.49224CLBYL-TM corridor - engineering works for Industrialupgrading areas at San Hlng Tsuen, Tong Ian SanTsuen, Klu Tau Wai and Tan Kwal TsuenEngineering works at Tuen Mun area1997/98 3rd Qtr6.49Engineering works at Yuen Long area1998/99 4th Qtr6.49253CLBYL-TM corridor - engineering works for Hung ShulKlu and Ping ShanYL-TM corridor - engineering works for Ping Shan1997/98 2nd Qtr6.50089DSANorth West New Territories <strong>development</strong> - trunksewers, sewage pumping stations and rising mains -stage IINorth West New Territories <strong>development</strong> - trunksewers, sewage pumping stations and rising mains -stage II (p/s phase II)1996/97 3rd Qtr6*77North West New Territories Development - trunksewers, sewage pumping stations and rising mains -stage II (miscellaneous)1996/97 3rd Qtr6.77Page 1.45


APPENDIX IINDEX OF PROJECTS ARRANGED BY YEAR OF COMMENCEMENTNORTH WEST NTPROJECTS TO START IN 1995/1996Item No.& Cat.DescriptionCompletionDatePart 6Page No.178THBHIGHWAYSVehicular border link at Lok Ma Chan, remainingworks1995/96 4th Qtr 6.56022CDBDRAINAGENorth West New Territoriesdrainage channels for Yuenremainder<strong>development</strong> - main<strong>long</strong> and Kam Tin -North West New Territoriesdrainage channels for Yuenremainder (phase 1)North West New Territoriesdrainage channels for Yuenremainder (phase 2)<strong>development</strong> - mainLong and Kam Tin -<strong>development</strong> - mainLong and Kam Tin -1998/99 1st Qtr1997/98 4th Qtr6.616.61029CDBMain drainage channels for Ngau Tarn MeiMain drainage channels for Ngau Tarn Mei (phase 2)1998/99 2nd Qtr 6.79043CDBNorth West New Territories <strong>development</strong> - maindrainage channels for Yuen Long and Kam Tin -stage JNorth West New Territories <strong>development</strong> - maindrainage channels for Yuen Long and Kam Tin -Stage I (phase 3)1998/99 1st Qtr 6.62022EHIVRC ENVIRONMENTAL HYGIENELau Fau Shan market, NWNT1997/98 1st Qtr 6.67Page 1.46


APPENDIX IINDEX OF PROJECTS ARRANGED BY YEAR OF COMMENCEMENTNORTH WEST NTPROJECTS TO START IN 1995/1996Item No.& Cat.DescriptionCompletionDatePart 6Page Ho,RC LEISURE SERVICES112LSIVKal Shan recreational priority areaOn costs1997/98 1st Qtr6.67153LSIVLau Fau Shan, Town SquareOn costs1997/98 1st Qtr6.67162LSIIILocal open space at Kat Hlng P/ai, Kam TinLocal open space, Kat Hlng Wai, Kam Tin1996/97 3rd Qtr6.67177LSIVLocal open space, Ping ShanOn costs1997/98 3rd Qtr6.53178LSIVLocal open space, Hung Shul Klu, phase IOn costs1996/97 4th Qtr6.53179LSIVHung Shul Klu town squareOn costs1997/98 3rd Qtr6.53187LSIVSwimming pool complex, Kam Tin, NWNT1997/98 2nd Qtr6.68188LSIVIndoor recreation centre (type B), Kam Tin, NWNT1997/98 2nd Qtr6.68Page 1.47


APPENDIX IINDEX OF PROJECTS ARRANGED BY YEAR OFCOMMENCEMENTNORTH WEST NTPROJECTS TO START IN 1996/1997Item No.& Cat.DescriptionCompletionDatePart 6Page No.CIVIL ENGINEERING191CLBPing Shan <strong>development</strong>, remainder2000/01 3rd Qtr6.49219CLBSan Tin <strong>development</strong> - engineering works1999/00 4th Qtr6.63255CLBYL-TM corridor - engineering works for San HlngTsuen, extension area 92 and Tong Yan San Tsuen,extension area 70YL-TM corridor - engineering works at Yuen Longarea1999/00 4th Qtr6.51N.I.Klu Tau Wai Industrial area <strong>development</strong>1998/99 4th Qtr6.52HIGHWAYS172THBNT Circular Road Improvements, Au Tau to Fan KamRoad - Au Tau bypass and remaining works1999/00 2nd Qtr6.55WATERWORKS14.1WFBAdditional treatment and transfer facilities forNorth Western New TerritoriesAdditional treatment and transfer facilities forNorth Western New Territories (Ngau Tarn MelTreatment Works -Stage I) (Part B— Works)1999/00 3rd Qtr6.59DRAINAGE022CDBNorth West New Territories <strong>development</strong> - maindrainage channels for Yuen <strong>long</strong> and Kam Tin -remainderNorth West New Territories <strong>development</strong> - maindrainage channels for Yuen Long and Kam Tin -remainder (phase 3)1998/99 3rd Qtr6.61North West New Territories <strong>development</strong> - maindrainage channels for Yuen Long and Kam Tin -remainder (phase 4)1998/99 3rd Qtr6.61Page 1.48


APPENDIX IINDEX OF PROJECTS ARRANGED BY YEAR OF COMMENCEMENTNORTH WEST NTPROJECTS TO START IN 1996/1997Item No.Cat.DescriptionCompletionDate•art 6'age No*RC LEISURE SERVICES112LSIVKai Shan recreational priority areaKai Shan recreational priority area1997/98 1st Qtr6.67153LSIVLau Fau Shan f Town SquareLau Fau Shan, Town Square1997/98 1st Qtr6.67177LSIVLocal open space, Ping ShanLocal open space, Ping Shan1997/98 3rd Qtr6.53178LSIVLocal open space, Hung Shui Kiu, phase ILocal open space, Hung Shui Kiu, phase I1996/97 4th Qtr6.53179LSIVHung Shui Kiu town squareHung Shui Kiu town square1997/98 3rd Qtr6.53259LSIVLocal open space, Hung Shui Kiu f Phase IILocal open space, Hung Shui Kiu, phase II1998/99 1st Qtr6.53


APPENDIX IINDEX OF PROJECTS ARRANGED BY YEAR OF COMMENCEMENTNORTH WEST NTPROJECTS TO START AFTER 1996/1997Item No.& Cat.DescriptionCompletionDatePart 6Page No.CIVIL ENGINEERING184CLCDevelopment of remaining rural hinterland in theNorth West New Territories - engineering works2003/04 2nd Qtr6.63189CLCLau Fau Shan <strong>development</strong>, package 32001/02 2nd Qtr6.63218CLCKam Tin rural <strong>development</strong> - remaining engineeringworks2001/02 3rd Qtr6.63252CLCYL-TM corridor / rural hinterland - engineeringworks for village priority areas (nos. 14-24)2001/02 3rd Qtr6.50254CLCYL-TM corridor - engineering works for Yick Yuen(south) area 111, Lam Tei, area S5, San SangTsuen, area 123YL-TM corridor - engineering works at Tuen Munarea2000/01 4th Qtr6.50YL-TM corridor - engineering works at Yuen Longarea2000/01 4th Qtr6.50255CLBYL-TM corridor -engineering works for San HingTsuen, extension area 92 and Tong Yan San Tsuen,extension area 70YL-TM corridor - engineering works at Yuen Longarea • : , ' . ' ' .' ' . . • •2000/01 4th Qtr6.51063DSC'.-:•";'. • : ' : •North West New Territories <strong>development</strong> - sewagetreatment plant, remainder2000/01 4th Qtr6.76253TBCYL-TM corridor - site formation, roads & drains atTan K<strong>wai</strong> Tsuen, Hung Shui Kui & San Hing Tsuen2000/01 4th Qtr6.52Page 1.50


APPENDIX IINDEX OF PROJECTS ARRANGED BY YEAR OFCOMMENCEMENTNORTH WEST NTPROJECTS TO START AFTER 1996/1997Item No.& Cat.DescriptionCompletionDatePart 6Page No.HIGHWAYS109THNorth West New Territories develop/went -improvement to Kam Tin Road2000/01 1st Qtr6.55214THTong Tan San Tsuen roads and drains stage II1998/99 3rd Qtr6.52246THCNorth West Territories <strong>development</strong> - Kam Tinbypass stage I1999/00 3rd Qtr6.56436THCDeep Bay coastal road2000/01 3rd Qtr6.57COMMUNITY FACILITIESN.I.SuJb-di visional fire station and ambulance depot atHung Shui Kiu, NWNT1999/00 2nd Qtr6.64N.I.Primary school, Ping Shan, NWNT1998/99 2nd Qtr6.64N.I.Primary school. Wing Lung Wai, Kam Tin, NWNT1999/00 2nd Qtr6.64N.I.Primary school, Fung Kat Heung, NWNT1998/99 2nd Qtr6.64N.I.Primary school, Hung Tso Tin, NWNT1998/99 2nd Qtr6.64N.I.Primary school, Ngau Tarn Mei, NWNT1998/99 2nd Qtr6.64N.I.Primary school, Sheung Chuk Yuen, NWNT1999/00 2nd Qtr6.64N.I.Primary school, Fairview Park, NWNT1998/99 2nd Qtr6.64Page 1.51


APPENDIX IINDEX OF PROJECTS ARRANGED BY YEAR OF COMMENCEMENTNORTH WEST NTPROJECTS TO START AFTER 1996/1997Item No.& Cat.DescriptionCompletionDatePart 6Page No.COMMUNITY FACILITIES(cont'd)N.I.Primary school, Pak Nal, NWNT1999/00 2nd Qtr6.64N.I.Secondary school, Ping Shan, NWNT1999/00 1st Qtr6.65N.I.Secondary school, Kam Tin, NWNT1999/00 1st Qtr6.65N.I.Secondary school, San Tin, NWNT2000/01 1st Qtr6.65N.I.Fish market, Lau Fau Shan, NWNT1999/00 2nd Qtr6.65N.I.Clinic, Kam Tin, NWNT1998/99 3rd Qtr6.65N.I.Clinic, San Tin, NWNT1998/99 3rd Qtr6.65099SCCArea community centre, Hung Shul Klu, NWNT1999/00 1st Qtr6.65looseCArea community centre, Kam Tin, NWNT1999/00 3rd Qtr6.66N.I*Area community centre, Lau Fau Shan, NWNT1998/99 3rd Qtr6.66N.I.Neighbourhood community centre, San Tin, NWNT1998/99 3rd Qtr6.66N.I.Community hall/social centre for elderly, Fung KatHeung, NWNT1998/99 2nd Qtr6.66Page 1.52


APPENDIX IINDEX OF PROJECTS ARRANGED BY YEAR OFCOMMENCEMENTNORTH WEST NTPROJECTS TO START AFTER 1996/1997Item No.& Cat.DescriptionCompletionDatePart 6Page No.COMMUNITY FACILITIES(cont'd)V.I.Community hall/social service centre for theelderly. Hung Tso Tin, NWNT1998/99 2nd Qtr6.66N.I.Community hall/social service centre for theelderly, Sheung Chuk Yuen, NWNT1998/99 2nd Qtr6.66N.I.Community hall /social service centre for theelderly, Pak Nai, NWNT1999/00 2nd Qtr6.66RC LEISURE SERVICESN.I.District open space, Tong Yan San Tsuen, NWNT1998/99 2nd Qtr6.54N.I.Swimming pool complex in Hung Shui Kui1999/00 1st Qtr6.68N.I.Local open space and central area improvements,Kam Tin , NWNTKam Tin central area improvements1998/99 1st Qtr6.68Local open space, Ha Pak Nai2000/01 1st Qtr6.68N.I.IVLocal open space, Tong Yan San Tsuen1998/99 2nd Qtr6.54N.I.IVLocal open space adjacent to community centre, KamTin1998/99 2nd Qtr6.68N.I.IVLocal open space, waterfront amenity area, Lau FauShan2001/02 2nd Qtr6.68N.I.IVLocal open space adjacent to Wing Lung Wai RoadL2 , Kam Tin1998/99 1st Qtr6.68Page 1.53


APPENDIX IINDEX OF PROJECTS ARRANGED BY YEAR OF COMMENCEMENTNORTH WEST NTPROJECTS TO START AFTER 1996/1997Item No.& Cat.DescriptionCompletionDatePart 6Page KRC LEISURE SERVICES(cont'd)N.I.IVLocal open space, Hung Tso T±n1998/99 1st Qtr6.69N.I.IVLocal open space, Ngau Tarn Mel1998/99 1st Qtr6.69N.I.IVLocal open space, Sheung Chuk Yuen1998/99 1st Qtr6.69N.I.IVLocal open space adjecent to Kam Tin San TsuenRoad A71998/99 1st Qtr6.69N.I.IVLocal open space, San Tin2001/02 2nd Qtr6.69N.I.IVLocal open space, Fung Kat Heung1998/99 1st Qtr6.69RC MULTI-FUNCTIONN.I.Indoor recreation centre and market In San Tin1998/99 4th Qtr6.62Page 1.54


NORTH WEST NEW TERRITORIES DEVELOPMENT OFFICETIN SHUI WAI/YUEN LONG DEVELOPMENT PROGRAMME1993 EDITIONAPPENDIX II - INDEX OF PROJECTS ARRANGED BY WORK TYPECONTENTSPAGE No.YL TSW NtfNT• • • •1. COMMUNITY FACILITIESPublic Safety - Fire services II. -25, .50Education - Primary II. 8, .25, .50Education - Secondary II • 9 ' *26 f .51Education - Tertiaryn * . * 27Government Offices - Intra-governmental services 11.10, .21Food Supply - Abattoirs, wholesale markets, quaran<strong>tin</strong>e 11.11, .52facilitiesSupport - Printery, warehousing, workshops, quarries etc. II. *27Law and Order - Policen * * 27Medical and Health - Clinics 11.10, .28, .52Recreation, Culture and Amenities - Museums, 11.10auditoria,cultural complexesa n d librariesRecreation, Culture and Amenities - Open spaces 11,10Social Welfare - Community centres 11.12, -28, .52II. 1


PAGE NO.2. CIVIL ENGINEERING YL TSW NWNTCivil Engineering - Drainage and erosion protection II. 3, .35Civil Engineering - Multi-purpose II. 3, .16Civil Engineering - Land <strong>development</strong> II. 3, .16, .37Environmental Protection - Sewerage and sewage treatment II. 5, .413* HIGHWAYSTransport - Footbridges and pedestrian tunnels II. 6, .23Transport -- Roads II. 7, .22, .44Transport - Interchanges and bus termini II. 7, .224* WATERWORKSWater Supplies - Combined fresh/salt water supply projects II* .24Water Supplies - Fresh water supplies II. .24, .49;5. REGIONAL COUNCIL PROJECTSRC Leisure Services 11.13, .29, .54RC Environmental Hygiene 11.13, .54RC Multi-function II, .56RC Culture and Entertainment II. .32RC Suppor<strong>tin</strong>g Services II. ,326. HOUSINGHousing - Public housing II. .33, .43.Housing - Private housing II. .33II. 2


APPENDIX 11INDEX OF PROJECTS ARRANGED BY WORK TYPEYUEN LONGCIVIL ENGINEERINGItem Wo.&Cat.Policy Sec.&AgencyDescriptionPacfcageCurrentEstimatedCost ($M)ProgrammeStart DateCbtfpletian DatBPart 6Page No.041CDACIVIL ENGINEERINGDrainage & Erosion ProtectionYuen Long nullahs - environmentalinprovemsntsSPELTDDCivil works - YL19/89 (part)9107.541990/91 2nd Qtr1992/93 1st Qtr6.18SPEDEMSDE&M works (1008/EM/90)95.851990/91 3rd Qtr1991/92 4th Qtr6.18SPELTDDLandscaping and miscellaneous works910.601990/91 3rd Qtr1993/94 4th Qtr6.18rrvrr. FWGTNKK% TN&Multi-purpose0270GCYuen Long south eastern extension - siteformation, roads and drainage worksSPELTDDYuen Long south eastern extension - siteformation, road and drainage works11272.001997/98 1st Qtr2001/02 2nd Qtr6.21SPELTDDLandscaping and miscellanous works1116.501997/98 1st Qtr2001/02 2nd Qtr6.2102803BYuen Long south western extension - siteformation, road's and drainage worksSPELTDDYuen Long south western extension - sitefoliation, roads and drainage works12190.051995/96 3rd Qtr1999/00 3rd Qtr6.23SPELTDDLandscaping and miscellaneous works128.311996/97 1st Qtr1999/00 3rd Qtr6.23CTVXL MGDJEERINGLand Development1050,AYuen Long <strong>development</strong>, package 3,engineering worksSPELm>Formation of GTC site north of Yuen Longwestern roundatout31.651995/96 3rd Qtr1996/97 3rd Qtr"\- 6.2.Page 11.3


APPENDIX IIINDEX OF PROJECTS ARRANGED BY WORK TYPEYUEN LONGCIVIL ENGINEERINGItem Wo.&Cat. \Policy Sec.&AgencyDescriptionPackageCurrentEstimatedCost ($M)ProgrammeStart DateCompletion DatePart 6Page No.105CLA(cont f d)CIVIL WGIWERINGLand Development(cont'd)Yuen Long <strong>development</strong>, package 3 fengineering worksSPELTDDLandscaping and miscellaneous31.311986/87 1st Qtr1990/91 4th Qtr6.2106CLAYuen Long <strong>development</strong>, package 4,engineering worksSPELTDDLandscaping and miscellaneous44.511988/89 4th Qtr1991/92 4th Qtr6.5107CLAYuen Long <strong>development</strong>, package 7,engineering worksSPELZWLandscaping and miscellaneous72,521978/79 4th Qtr1990/91 4th Qtr6.14108CLAYuen Long <strong>development</strong>, package 5,engineering worksSPELTDDTal Klu Village - including formationfor school site58.401995/96 2nd Qtr1997/98 2nd Qtr6.8SPELTDDLandscaping and miscellaneous52.001985/86 4th Qtr1990/91 4th Qtr6.8109CLAYuen Long <strong>development</strong>, package 6,engineering worksSPELTDDLandscaping and miscellaneous62.221985/86 4th Qtr1990/91 4th Qtr6.11—Page II.4


APPENDIX IIINDEX OF PROJECTS ARRANGED BY WORK TYPEYUEN LONGCIVIL ENGINEERINGItem No.&Cat.Policy Sec.&AgencyDescriptionPackageCurrentEstimatedCost ($M)ProgrammeStart DateCompletion DatePart 6Page No.111CLACWTL MGTWffiRTNGLand Development(cont'd)Yuen Long <strong>development</strong>, package B,engineering works, stage ISPELTDDSite fozTTBtion, access roads and maindrainage - 640/80839.161981/82 3rd Qtr1984/85 2nd Qtr6.16234CLBYuen Long East public housing site -engineering worfcsSPELWDStage I - footbridge935.121993/94 4th Qtr1996/97 3rd Qtr6.18SPELTDDStage II - site formation, roads anddrainage works9111.711995/96 1st Qtr1998/99 3rd Qtr6.18SPELTDDLandscaping and miscellaneous works919.681994/95 3rd Qtr1998/99 3rd Qtr6.18278CLBKau Hul <strong>development</strong> - engineering worfcs,area 16, Yuen LongSPELTDDSite formation, roads and drainage worfcs10100.481993/94 4th Qtr1997/98 1st Qtr6.20SPELTDDLandscaping and miscellanous works103.641993/94 4th Qtr1997/98 1st Qtr6.20mriBONMENTAL PPDTBCTICNSewerage and Sewage Treatment029DSASPELDSDYuen Long full sewage treatment plant6210.001980/81 1st Qtr1992/93 1st Qtr6.11Page II.5


APPENDIX IIINDEX OF PROJECTS ARRANGED BY WORK TYPEYUEN LONGHIGHWAYSItem No.&Cat.Policy Sec.&AgencyInscriptionPackageCurrentEstimatedCost ($M)ProgramneStart DateConpletion DatePart 6Page No.040TBATRANSPORTFootbridges and Pedestrian TunnelsYuen Long <strong>development</strong>, package 8 -pedestrian and cycle bridgeS for TTDDBridge works NTDB 14/84810.701985/86 3rd Qtr1987/88 1st Qtr6.16058TBBTuen <strong>long</strong> <strong>development</strong>, Long Pingfootbridge extension across On Ning Roadand Castle Peak RoadS for TTDDBridge L extension337.491994/95 1st Qtr1996/97 4th Qtr6.2S for TTDDLandscaping and miscellaneous works34.181995/96 1st Qtr1996/97 4th Qtr6.2059TBANullah bridge at Ma Mui Road and PingWui Street, Yuen LongS for TTDDBridgeworks and road works - NZDB 23/85312.521987/88 3rd Qtr1988/89 2nd Qtr6.3S for Tm>Landscaping and miscellaneous works30.66—1990/91 3rd Qtr6.3061TBAPedestrian and cycle bridge, Long Ping -Teung OkS for TTDDEngineering works - YL19/89 (part)821.841990/91 2nd Qtr1991/92 4th Qtr6.16SforTWDLandscaping and miscellaneous works83.001990/91 2nd Qtr1992/93 3rd Qtr6.16084TBAPedestrian and cycle bridge, Yuen Long,Phase IS for T2EPBridge *P'93.601987/83 4th Qtr1989/90 1st Qtr6.19Page II.6


APPENDIX IIINDEX OF PROJECTS ARRANGED BY WORK TYPEYUEN LONGHIGHWAYSItem No.&Cat.Policy Sec.&AgencyDescriptionPackageCurrentEstimatedCost ($M)ProgrammeStart DateConplet±on DatePart 6Page No.TRANSPORTRoadsw&mA5 for TTDDYuen Long northern bypass, gradeseparation of eastern junctionLandscaping and miscellaneous works51.55_990/91 3rd Qtr6.8145THAYuen Long northern bypass, easternjunction improvements - roadworksS for TTDDRoadworks, bridges H&K 3/NWB/82 (part)416.73983/84 3rd Qtr985/86 3rd Qtr6.51772HAS for THyDImprovements to Yuen Long nullah bunds,stage III916.35988/89 1st Qtr1990/91 3rd Qtr6.19TRANSPORTInterchange and Bus Termini034TIAPublic Light Bus terminus, Fook HongStreet, Yuen LongS for TTDDEngineering works - N2DB 24/8542.311986/87 4th Qtr1988/89 2nd Qtr6.5Page II. 7


APPENDIX IIINDEX OF PROJECTS ARRANGED BY WORK TYPEYUEN LONGCOMMUNITY FACILITIESItem No.&Cat.Policy Sec.&AgencyDescriptionPackageCurrentEstimatedCost ($M)ProgrammeStart DateCompletion DatePart 6#age No.— — • —rjVTTfENGINEERING004CEIVDRSArtihSDYuen Long Civic Centre, package 6 f YuenLong6263.001994/95 2nd Qtr1996/97 3rd Qtr6.11EDUCATIONPrimary052EPATwo standard primary schools in LongPing Estate, Yuen LongSEMHDTwo standard primary schools in LongPing Estate, Yuen Long818.34_1988/89 4th Qtr6.17SEMHDOthers/con<strong>tin</strong>gencies80.36—.-6.17053EPAPrimary school in Shtd Pin Wai, YuenLongSENHDPrimary school in ShwL Pin Wai, YuenLong8.-6.17057EPAPrimary school, package 6, Yuen Long061EPCSEMArchSDsmArchSDOther/con<strong>tin</strong>genciesPrimary school, package 3, Yuen Long631.3533.50-1997/98 1st Qtr1999/00 2nd Qtr6.116.3063EPAPrimary school, package 5, Yuen LongsmArchSDOtter/con<strong>tin</strong>gencies50.756.9_ —Page II.8


APPENDIX IIINDEX OF PROJECTS ARRANGED BY WORK TYPEYUEN LONGCOMMUNITYFACILITIESItem No.&Cat.Policy Sec.&AgencyDescriptionPackageCurrentEstimatedCost ($M)PzpgraniweStart DateCbriple<strong>tin</strong>ra DatePart 6Page No.EDUCATIONPrimary(cont'd)N.I.SEMArchSDPrimary school, area 12, Yuen Long933.501997/98 1st Qtr1999/00 1st Qtr6.19N.I.SEMArchSDPrimary school in Yuen Long southeastern extension1133.501998/99 1st Qtr2000/01 1st Qtr6.21N.I.SEMArchSDPrimary school In Yuen Long southwestern extension1233.501997/98 1st Qtr1999/00 1st Qtr6.23EDUCKFXCNSecondary081ESASecondary school, package 6, Yuen LongSEMArchSDSecondary school, package 6, Yuen Long632.651989/90 3rd Qtr1991/92 2nd Qtr6.11SEMArchSDOther/contlgencies64.55-"•6.11082ESAOne standard secondary school, package6, Yuen LongSEMArchSDOne secondary sctool, package 6, YuenLong622.571988/89 2nd Qtr1989/90 2nd Qtr6.12SEMArchSDOtters/con<strong>tin</strong>gencies61.43~"6.12N.I.SEMAzdhSDSecondary school in Yuen Long southeastern extension1143.001998/99 1st Qtr2000/01 1st Qtr6.21Page II.9


APPENDIX IIINDEX OF PROJECTS ARRANGED BY WORK TYPEYUEN LONGCOMMUNITY FACILITIESItem No.&Cat.Policy Sec.&AgencyDescriptionPackageCurrentEstimatedCost ($M)ProgrammeStart DateCompletion DatePart 6Page No.EDUCXtZCNSecondary(cont'd)N.I.SEMArchSDSecondary school in Yuen Long southwestern extension1243.001997/98 1st Qtr1999/00 1st Qtr6.23GOVERNMENTOFFICESIntra-^governmental Services026KAADRSArchSDMarket, library, squash courts andoffice at Tax Kiu, Yuen Long ToonOthers /Con<strong>tin</strong>gencies47.29_6.6ClinicsQ26MCAClinic, package 5, Yuen LongsimArchSDClinic, package 5, Yuen Long531.421988/89 2nd Qtr1989/90 4th Qtr6.9SHWArchSDOthers/con<strong>tin</strong>gencies50.781995/96 1st Qtr1995/96 4th Qtr6.9RECREATION, CULTURE WD AMFNrrTf!XRetail Markets and Cooked Food Centres020WAI^rcwisioning of Hop Yick privatemarket and Yuen Long hawker bazaarDPSArchSDOthers/con<strong>tin</strong>gencies41.486.6Page II.10


APPENDIX IIINDEX OF PROJECTS ARRANGED BY WORK TYPEYUEN LONGCOMMUNITYFACILITIESItem No.&Cat.policy Sec.&AgencyDescriptionPackageCurrentEstimatedOoat ($M)ProgrammeStart Date"Zorpletion DatePart 6Page No.1BCREKPXGW, CULTURE AMD AMENITIESCjpen Spaces156BOALocal open space, package 6 f Yuen LongDRSTDDLocal open space, package 6 f Yuen Long -contract parent64.81988/89 3rd Qtr990/91 4th Qtr6.12DRSTDDMiscellaneous60.38988/89 3rd Qtr990/91 4th Qtr6.12157POAYuen Long Town ParkDPSTDDYuen Long town park - contract pajment644.20988/89 3rd Qtr991/92 4th Qtr6.12DPSTDDLetter of intent issued60.32988/89 3rd Qtr991/92 4th Qtr6.12DPSTDDMiscellaneous64.53988/89 3rd Qtr991/92 4th Qtr6.12246BDALocal open space, site No. I, package 7,Yuen LongDPSArchSDOtnezB/Oon<strong>tin</strong>gencies70.45-6.1425QBDAYuen Long Tom SquareDPSArchSDOthers/Con<strong>tin</strong>gencies40.07-6.6255PDALocal Open space at On Hing Poad, YuenLongDPSArchSDOthers/Con<strong>tin</strong>gencies30.26-6.3Page 11.11


APPENDIX IIINDEX OF PROJECTS ARRANGED BY WORK TYPEYUEN LONGCOMMUNITY FACILITIESItem No.&Cat.033RSAPolicy Sec.&AgencyDescriptionPBCREfflTCN, CUnWRS MD AMENITIESSports Centres, Swimming Pools and BeachBuildingsYuen Long swimning pool and gardenPackageCurrentEstimatedCbst ( $M)ProgrammStart DateCompletion DatePart 6Page No.— — — - _DPSArdhSDOthers/Con<strong>tin</strong>gencies35.08«.—6.3SOCIALWELFAREConmmity CentresN.I.SHAArchSDNeighbourhood comunity centre in YuenLong south eastern extension1138.001998/99 1st Qtr1999/00 3rd Qtr6.21N.I.fiHAArchSDSheltered workshop in Yuen Long southeastern extension1116.001998/99 1st Qtr1999/00 3rd Qtr6.21N.I.SHAArchSDNeighbourhood community centre in YuenLong south western extension1238.001997/98 1st Qtr1998/99 3rd Qtr6.23— i ._.. —' : ;Page 11.12


APPENDIX IIINDEX OF PROJECTS ARRANGED BY WORK TYPEYUEN LONGRC PROJECTSItem No.&Cat.Policy Sec.&AgencyDescriptionackageCurrentEstimatedCost ($M)ProgrammeStart DateCompletion DatePart 6Page No. \iNyiPQNMEIfflAL i^GIENEoumIVPCArchSDCooked food centre in package 7 / YuenLong76.51996/97 3rd Qtr997/98 2nd Qtr6.14005LSIVPCArchSDDistrict games complex and district openspace , area 12, Yuen Long981.76995/96 3rd Qtr997/95 2nd Qtr6.19096LSIIIXArchSDIndoor recreation centre (type C) ,package 6, Yuen Long657.88994/95 3rd Qtr'996/97 2nd Qtr6.13097LSILocal open space, package 3, phase II,Yuen LongPCTDDLocal open space, package 3, phase II,Yuen Long35.75989/90 3rd Qtr1991/92 3rd Qtr6.4PCTDDOn costs30.92-"""6.4098LSILocal open space, package 4 f phase II,Yuen LongPCTOOLocal open space, package 4 f phase II,Yuen Long42.041969/90 3rd Qtr1991/92 3rd Qtr6.7PCTDDOn costs40.32- "6.7105LSIIILocal open space, package 5 - reminder,Yuen LongPCPSDLocal open space, package 5 - remainder,Yuen Long54.351994/95 2nd Qtr1995/96 3rd Qtr6.9PCPSDOn costs50.701993/94 2nd Qtr1995/96 3rd Qtr6.9Page 11.13


APPENDIX IIINDEX OF PROJECTS ARRANGED BY WORK TYPEYUEN LONGRC PROJECTSItem No.SiCat.Policy Sec.&AgencyDescriptionPackageCurrentEstimatedCbst ($M)ProgranroeStart DateOcupletion DatePart 6Page No.LEISURE SERVICES(cont f d)159LSIVXHDIndoor recreation centre type C, YuenLong east estate f Yuen Long957.881996/97 3rd Qtr1998/99 2nd Qtr6.19168LSLocal qpen space, package 7, Yuen LongwemoLocal open space, package 7, Yuen Long74.841989/90 3rd Qtr1991/92 3rd Qtr6.15J?C2DDOn costs70.781989/90 3rd Qtr1992/93 3rd Qtr6.15169LSIlocal open space, package 5, Yuen LongBCTDDLocal open space, pac&age 5, Yuen Long511.261989/90 3rd Qtr1991/92 4th Qtr6.10PCWDOn. costs51.801989/90 3rd Qtr1991/92 4th Qtr6.10N.I.PCIWLocal open space, package 7, phase III,Yuen Long7-1997/98 1st Qtr1998/99 1st Qtr6.15N.I.RC2DDDistrict open space, south easternextension, Yuen Long11«.2000/01 1st Qtr2001/02 2nd Qtr6.22N.I.PCIDDLocal open space, south easternextension, Yuen Long11—2000/01 1st Qtr2001/02 2nd Qtr6.22N.I.PCArchSDIndoor recreation centre in Yuen Longsouth westen extension1258.001997/98 1st Qtr1998/99 4th Qtr6.24N.I.District and local open spaces, southwestern extension, Yuen LongflCm»Local open space, south westernextension, Yuen Long12—2000/01 1st Qtr2001/02 2nd Qtr6.24PCTDDDistrict open sipace, south westernextension, Yuen Long12M.2000/01 1st Qtr2002/03 1st Qtr6.24Page 11.14


APPENDIX IIINDEX OF PROJECTS ARRANGED BY WORK TYPEYUEN LONGRC PROJECTSItem No.&Cat.Policy Sec.&AgencyDescriptionPackageCurrentEstimatedCost ($M)ProgramsStart DateCcerpletion DatePart 6Page No*N.I.IVJ8C2DDLEISUPE SERVICES(cent f d)Local open space, package 7 - reminder,Yuen Long7_997/98 1st Qtr998/99 2nd Qtr6.15W.I.IVPC2DDDistrict open space, Kau Hu± f Yuen Long10-1998/99 1st Qtr1999/00 2nd Qtr6,20Page 11.15


APPENDIX IIINDEX OF PROJECTS ARRANGED BY WORK TYPETIN SHUI WAICIVIL ENGINEERINGItem No.&Cat.olicy Sec,&AgencyDescriptionPackageCurrentEstimatedCost ($M)ProgrammeStart DateCompletion DatePart 6Page No.CIVIL MGBffiERINGmilti-purpose020CGCompletion of Hung Tin RoadLSPELTDDSouth-Western access road, Contract No.NTOB 12/54325.561985/86 3rd Qtr1986/87 4th Qtr6.27SPELWDJunction Mn39 jwprovenaent39.851991/92 1st Qtr1992/93 1st Qtr6.27SPELTDDTin Shui Wa± west access3102.751992/93 2nd Qtr1995/96 2nd Qtr6.27SPEL2130Miscellaneous38.88-6.27SPEL2DD-Additional fund other than inflation, upto 31.3.92320.00-6.27CIVIL ENGINEERINGLand Development1210,ATin Shui Wai <strong>development</strong> - design andinvestigationSPELTDDSite investigation20.28«6.26227CLBTin Shui Wai <strong>development</strong>, package 3,part XT - village flood protection works- remainderSPEL2EDVillage flood protection works -remainder321 .381994/95 4th Qtr1997/98 4th Qtr6.27SPED2£Dlandscaping & miscellaneous32.161994/95 4th Qtr1997/98 4th Qtr6.27SPEL2DDVillage flood protect "works - remainder(additional work)310.801994/95 4th Qtr1997/98 4th Qtr6.28SPEL2H>Mditional fund other than inflation, upto 31.3.92317.011994/95 4th Qtr1997/98 4th Qtr6.28Page 11.16


INDEX OF PROJECTS ARRmGED BY WORK TYPETIN SHUI WAICIVIL ENGINEERINGItem No.&Cat.Policy Sec.&AgencyjDescriptionPackageCurrentEstimatedCbst ( $M)ProgrammeStart DateCompletion Dateart 6age No.CIVIL ENGINEERINGLand Developmentfcont'dj270CLATin Shui Wai <strong>development</strong>, package 3,part IIA - village flood protectionSPELTDDTin Shui Wai <strong>development</strong> - package 3/part IIA - village flood protection -contract payment333.93987/38 3rd Qtr991/92 1st Qtr6.28SPELTDDVillage flood protection, phase I370.53987/88 1st Qtr990/91 1st Qtr6.28SPELTDDVillage flood pumping stations, phase I34.27987/88 1st Qtr988/89 4th Qtr6.28SPELMiscellaneous38.66-6.28SPELTDDAdditional fund other than inflation, upto 31.3.9237.36_""*6.28298CLATin Shui Wai <strong>development</strong>, package 3,part II, land formation and maindrainage - initial <strong>development</strong> zoneSPELm>Tin Shui Wai develcpraant package 3, partII - land f brmation and min drainage -initial <strong>development</strong> zone - contractpayment3986.251987/88 3rd Qtr1991/92 1st Qtr6.29SPELTDDMiscellaneous33.761990/91 3rd Qtr1991/92 1st Qtr6.29SPELTDDAdditional fund otter tfoan inflation, upto 31. 3. 92342.00-6.29Page 11.17


APPENDIX IIINDEX OF PROJECTS ARRANGED BY WORK TYPETIN SHUT WAICIVIL ENGINEERINGItem No.&Cat.Policy Sec.&AgencyDescriptionPackageCurrentEstimatedCost ($M)ProgrammeStart DateCompletion DatePart 6Page No.312CLACIVIL ENGINEERINGLand Development(cont'djTin Shui Wai <strong>development</strong>, package 3,part II f land formation and maindrainage - land bankSPELTDDTin Shui Wai <strong>development</strong> package 3, partII - land formation and <strong>wai</strong>n drainage -land bank - contract payment3248.091988/89 1st Qtr1991/92 1st Qtr6.29315CLBTin Snui Wai <strong>development</strong>, package 5,engineering infrastructure - remainderSPELPrivateInfrastructure in area 2354.781993/94 2nd Qtr1995/96 4th Qtr6.39SPELPrivateRemainder564.101993/94 4th Qtr1996/97 4th Qtr6.39327CLATin Shui Wai <strong>development</strong> - roads Dl(west) and L9 and formation of LRFreserve, phase ISPELTDDTin Shui Wai <strong>development</strong> - roads Dl(west) and L9 and formation of LRTreserve,phase I (additional work)45.00».-6.31SPELJDDRoads and drains496.121989/90 1st Qtr1991/92 4th Qtr6.31SPELTDDLetter of intent issued to HyD41.461989/90 1st Qtr1991/92 2nd Qtr6.31SPELTDDSPELWDLetter of intent issued to WSDLetter of intent issued to EMSD443.430.571989/90 1st Qtr1991/92 2nd Qtr_-6.316.31SPELTDDMiscellaneous40.481989/90 1st Qtr1991/92 4th Qtr6.31SPELTDDAdditional fund otfcer tftan inflation, upto 31.3.9245.00~6.31Page II.IB


APPENDIX IIINDEX OF PROJECTS ARRANGED BY WORK TYPETIN SHUI WAICIVIL ENGINEERINGItem No.&Cat.Policy Sec.&AgencyDescriptionPackageCurrentEstimatedCost ($M)ProgtronsfleStart DateCfcupletion DatePart 6Page No.334CLACIVIL ENGINEERINGLand Development(cont f d)Tin Shul Wai <strong>development</strong>, package 4 fengineering Infrastructure, phase IISPELWDRoads & drains4284.61989/90 2nd Qtr992/93 3rd Qtx6.32SPELTDDMiscellaneous47.16992/93 1st Qtr994/95 4th Qtx6.32338CLATin Shul Wai <strong>development</strong>, village floodprotection, phase IIISPELTDDVillage flood protection, phase III(Sheung Cheung Wai and Ha Mel San Tsuen)314.50990/91 3rd Qtr991/92 4th Qtr6.30348CLATin Shul Wai <strong>development</strong>, package 5,engineering Infrastructure, phase ISPELTODTin Shul Wai devlopment, package 5,engineering infrastructure, phase I5308.701990/91 2nd Qtr1993/94 3rd Qtr6.39SPELTDDLandscaping and miscellaneous518.831990/91 2nd Qtx1993/94 3rd Qtr6,39SPELTDDTin Shul Wai <strong>development</strong>, package 5,engineering Infrastructure, phase II565.301990/91 2nd Qtr1993/94 2nd Qtr6.39SPEL2BDLandscaping and miscellaneous53.971990/91 2nd Qtr1993/94 2nd Qtr6.39SPELTDDTin Shul Wai devloptnent, package 6,engineering infrastructure andfootbridge L4/F1 (Contract YL 20/90(part))523.601991/92 3rd Qtr1994/95 3rd Qtr6.39SPELWOLandscaping and miscellaneous51.401991/92 3rd Qtr1994/95 3rd Qtr6.40Page 11.19


APPENDIX IIINDEX OF PROJECTS ARRANGED BY WORK TYPETIN SHUI WAICIVIL ENGINEERINGItem No.&Cat.Policy Sec.&AgencyDescriptionPackageCurrentEstimatedCost ($M)ProgrammeStart DateCompletion DatePart 6Page No.3750,ACIVIL ENGINEERINGland Development(cont'djTin Shui Wai developrraent, package £,Engineering Infrastructure, Phase I andPhase HSPEDTDDTin Shui Wai <strong>development</strong>, package 6 fEngineering Infrastructure, Phase 16155.001991/92 3rd Qtr1993/94 3rd Qtr6.45SREZ,TDDTin Shui Wai <strong>development</strong>, package 6,Engineering Infrastructure, Phase II610.001993/94 3rd Qtr1994/95 3rd Qtr6.45378CLASEELI23DAdditional fund other than inflation, upto 31.3.92Tin Shui Wai <strong>development</strong>, package 5,engineering infrastructure for Tin ShuiWai Town Lot Nb.368.00-—6.45SPELPrivateInfrastructure in Area 19 - engineeringworks57.401991/92 3rd Qtr1993/94 1st Qtr6.40389CLASPELPrivateInfrastructure in area 24538.001992/93 2nd Qtr1994/95 4th Qtr6.40390CLATin Shui Wai <strong>development</strong>, package 5,engineering infrastructure, phase IISPELWDJtoads lA(rmBinder), L7 and transpor<strong>tin</strong>terchange at area 33, Tin Shui Wai5139.401992/93 2nd Qtr1996/97 2nd Qtr6.40SPELTDDLandscaping and miscellaneous58.501994/95 2nd Qtr1996/97 2nd Qtr6.40Page II.20


APPENDIX IIINDEX OF PROJECTS ARRANGED BY WORK TYPETIN SHUI WAICIVIL ENGINEERINGItem No.&Cat.olicy Sec.&AgencyDescriptionackageCurrentstimatedJ3St($M)PrograjM^Start DateCompletion DatePart 6Page No.SUPPORTDitra-goverrmeotal Services008GECS for WAnchSSDNew electrical & mechancial sub-workshopSt New Territories services Yuen Longdistrict vehicle depot5110.00997/98 1st Qtr999/00 4th Qtr6.42Page 11.21


APPENDIX IIINDEX OF PROJECTS ARRANGED BY WORK TYPETIN SHUT WAIHIGHWAYSJtem MX&Cat.Policy Sec.&AgencyDescriptionPackageCurrentEstimatedCost ($M)ProgranmeStart DateOoTpletion DatePart 6Page No.OthersmInfrastructure for Tin Shu± Wai Area 13and footbridges between Areas 5/13 & 16 /22431.801995/96 1st Qtr1997/98 3rd Qtr6.32CIVIL JSNGraEERJNGLand Development192CLBTin Shui Wai <strong>development</strong> - remainingworsesSPELPrivateTin Shui Wai <strong>development</strong>, package 6 fengineering infrastructure in Area 20,TSMTL 4(N)65.751993/94 4th Qtr1995/96 4th Qtr6.45SPELTDDTin Shui Wai <strong>development</strong>, package 6 fengineering infrastructure - services totown park and sguares661.701994/95 3rd Qtr1995/96 4th Qtr6.45SPELTDDTin Shui Wai <strong>development</strong> - package 6 fengineering infrastructure in<strong>development</strong> zone6353.521995/96 4th Qtr1998/99 3rd Qtr6.46SPELTDDTin Soui Wai <strong>development</strong> - package 6,engineering infrastructure, initialworks in reserve zone698.021995/96 4th Qtr2000/01 3rd Qtr6.46308CLBTin Shui Wai <strong>development</strong>, package 4,engineering infrastructure - remainderSPELTDDinfrastructure in area 1425.001995/96 3rd Qtr1997/98 4th Qtr6.32SPELTDDInfrastructure in area 3455.001995/96 3rd Qtr1999/00 1st Qtr6.32SPELTDDFootbridge between Areas 1/3415.001996/97 3rd Qtr1998/99 1st Qtr6.32SPELTDDFootbridge Jbetween Areas 3/5415.001999/00 2nd Qtr2001/02 1st Qtr6.32SPELDualling of Road L5422.001999/00 2nd Qtr2001/02 1st Qtr6.33Page 11.22


APPENDIX IIINDEX OF PROJECTS ARRANGED BY WORK TYPETIN SHUI WAIHIGHWAYSItem No.&Cat.Policy Sec.&AgencyDescriptionPackageCurrentEstimatedCost ($M)ProgrammeStart DateCbrjpletion DatePart 6Page No.CIVIL EtK-ilNFfyWrNGLand Development(cont'd)355CLATin Shul Wai <strong>development</strong> , package 4 fengineering infrastructure for Tin ShulWai Town Lot No. 1SPELPrivateInfrastructure area 8 - engineeringworks430.441990/91 2nd Qtr992/93 1st Qtr6.33368CLATin Shui Wai develqpr?jant, package 4,engineering infrastructure for Tin ShuiWai Tom Lot No. 2SPELPrivateInfrastructure area 11 - engineeringworks415.451990/91 4th Qtr1992/93 4th Qtr6.33396CLATin Shui Wai <strong>development</strong>, package 6 fengineering Infrastructure for Tin ShulWai Town Lot Nos. 5 and 6SPELPrivateTin Shul Wai <strong>development</strong>, package 6,engineering infrastructure in Area 27,TSWTL 5651.101992/93 4th Qtr1995/96 2nd Qtr6.46SPELPrivateTin Shui Wai <strong>development</strong>, package 6,engineering infrastructure in Area 28,TSitfTL 6632.901993/94 1st Qtr1995/96 3rd Qtr6.46TRANSPORTFootbridges and Pedestrian Tunnels106TBATin Shul Wai <strong>development</strong>, package 5,jPootJbridge IA/F1S for TWDTin Shul Wai <strong>development</strong> package 5,fbotforidge IA/F1518.201991/92 3rd Qtr1993/94 2nd Qtr6.41Page 11.23


APPENDIX IIINDEX OF PROJECTS ARRANGED BY WORK TYPETIN SHUI WAIWATERWORKSItem No.&Cat.Policy Sec.&AgencyDescriptionCurrent Programme Part 6Package Estimated Start Date Page No.Cost ( $M) Completion Date051WCACtmhined Fresh/Salt Water SupplyProjectsFresh and flushing water reticulationsystems for phase X of Tin Shui Wai<strong>development</strong> (stores)S for WWSDFresh and flushing water reticulationsystems for phase X of Tin ,Shui Wai<strong>development</strong> (part)435.451989/90 2nd Qtr1993/94 4th Qtr6.34S for WWSDOthers/Con<strong>tin</strong>gencies40.25—-6.34N.I.S for WWSDYuen Long Water Supply - Wang ChauServices Reservoir - Stage II430.001994/95 4th Qtr1996/97 4th Qtr6.34WATER SUPPLIESFresh Water Supplies129WFAS for WWSDTrunk main from Au Tau to 7uen Long andwater supply to phase X of Tin ,Shui Wai<strong>development</strong>435.081989/90 1st Qtr1993/94 4th Qtr6.34"~*~ — • — — _Pa ere 11.24


APPENDIX IIINDEX OF PROJECTS ARRANGED BY WORK TYPETIN SHUI WAICOMMUNITY FACILITIEStern No.&Cat.Policy -Sec.&AgencyDescriptionPackageCurrentEstimatedCost ($H)ProgrammeStart DateCompletion DatePart 6Page No.PUBLIC SAFETYFire Services84BFS for 5ArdhSDSub-divisional fire station andambulance depot, area 4, Tin Shui Wai425.001990/91 1st Qtr1991/92 3rd Qtr6.34EDUCATIWPrimary32EPiThree primary schools, area 5, Tin SftuiWaismHDsmHDThree primary schools, area 5, Tin ShuiWaiThree primary schools, area 5, Tin ShuiWai -additional work4474.3010.701988/89 4th Qtr1992/93 4th Qtr_-.6.346.34\33EPLsmHDsmArchSDMditional fund otter than inflation, upto 31.3.92Primary school, area 8, Tin Shui Wai441.0033.50-—1990/91 2nd Qtr1991/92 3rd Qtr6.346.35[54EPiTwo standard primary schools, area 16,Tin Shui. WaismHDTwo standard primary schools, area 16,Tin SfawL Wai.554.101989/90 2nd Qtr1993/94 2nd Qtr6.41smHDOtters/con<strong>tin</strong>gencies5--"6.41167EP\smArdhSDPrimary school, area 19, Tin Shui Wai536.801992/93 2nd Qtr1994/95 4th Qtr6.41168EP3smArchSDPrimary school, area 24, Tin Shui Wai534.001993/94 3rd Qtr1995/96 1st Qtr6.41Page 11.25


APPENDIX IIINDEX OF PROJECTS ARRANGED BY WORK TYPETIN SHUI WAICOMMUNITY FACILITIESItem No.&Cat.Policy Sec.&AgencyDescriptionPackageCurrentEstimatedCost ($M)ProgrammeStart DateCompletion DatePart 6Page No.EDOCKTKMPrdimry(cont'd)N.I.SENArchSDStandard primary school, area 27, TinShu± Wad.633.501997/98 1st Qtr1998/99 2nd Qtr6.47EDUCATIONSecondary079ESAsmArchSDStandard secondary school in area 11,Tin Shui Wai443.001992/93 2nd Qtr1994/95 1st Qtr6.35096ESAsmHD2\vo secondary schools/ area 5, Tin ShuiWai463.001988/89 4th Qtr1993/94 2nd Qtr6.35097ESASecondary school, area 8, Tin Shui WaismArcftSDSecondary school, area B, Tin Shui Wai437.521990/91 2nd Qtr1992/93 1st Qtr6.35smHDOthers/con<strong>tin</strong>gencies45.48— -6.35111ESBSH*ArchSDSecondary school, arm 14, Tin Shui Wai536.001993/94 3rd Qtr1995/96 1st Qtr6.41124ESATwo standard secondary schools, area 16,Tin Shui WaiSEKHDTwo standard secondary schools, area 16,Tin Shui Wai570.401989/90 2nd Qtr1992/93 2nd Qtr6.41smHDOtJiers/CQn<strong>tin</strong>gencies5—^6.41Page 11.26


APPENDIX IIINDEX OF PROJECTS ARRANGED BY WORK TYPETIN SHUT WAICOMMUNITY FACILITIESItem No.&Cat.Policy Sec.&AgencyDescriptionPackageCurrentEstimatedCost ($M)PzogaranroBStart DateCtupletion DatePart 6Page Mo.EDUCATIONSecondary(cont'd)It. I.SEMArchSDFirst secondary school, area 27 / TinShui Wai543.001997/98 1st Qtr1999/00 1st Qtr6.42N.I.smArchSDSecond secondary school, area 27, TinShui Wai643.001997/98 1st Qtr1999/00 1st Qtr6.47E33UCKFICMTertiary045ETASMArchSDOne special school for mildlyhandicapped children ff area 14, Tin ShuiWai517.501993/94 1st Qtr1994/95 2nd Qtr6.42SUPPORTOthers024GKCS forWArchSDGovernment depot, area 32, Tin Shui Wai546.501997/98 1st Qtr1998/99 4th Qtr6.42LW MD ORDERPolice122LPADivisional police station, area 4, TinShui WaiS for SArchSDDivisional police station, area 4, TinShui Wai444.771990/91 2nd Qtr1992/93 1st Qtr6.35S for SArchSDOt±^rs/con<strong>tin</strong>gencies422.23-6.35Page 11.27


APPENDIX IIINDEX OF PROJECTS ARRANGED BY WORK TYPETIN SHUI WAICOMMUNITY FACILITIESItem No.&Cat.Policy Sec.&AgencyDescriptionPackageCurrentEstimatedCost ($M)ProgranwieStart DateCompletion DatePart 6Page No.MEDICAL WD HEAL2HClinics044MCASHWArdhSDUrban clinic f area 26 , Tin Shui Wai432.001991/92 2nd Qtr1992/93 4th Qtr6.35SOCIAL WELFARECormmity Centres0829CASHAHDEstate comuntity centre, Tin Yiu estate.area 5, Tin Shui Wai422.501988/89 4th Qtr1991/92 4th Qtr6.36098SCASHAHDNeighbourhood ccrtmmity centre, area 16,Tin Shui Wai528.001990/91 1st Qtr1993/94 2nd Qtr6.42111SCA®WArdhSDSocial welfare facility (children &youth centre), area 8, Tin Shui Wai415.001991/92 1st Qtr1992/93 1st Qtr6.36124SCASHWArdhSDChildren, youth centre and day nursery,area 24, Tin Shui Wai514.101992/93 2nd Qtr1993/94 3rd Qtr6.42N.I.SKAArdhSDArea comunity centre, area 27, Tin ShuiWai634.001994/95 4th Qtr1996/97 2nd Qtr6.47Page 11.28


APPENDIX IIINDEX OF PROJECTS ARRANGED BY WORK TYPETIN SHUI WAIRC PROJECTSItem No.&Cat.Policy Sec.&AgencyDescriptionackageCurrent^stimatedJ3St ($M)ProgrsiweStart DateCompletion DatePart 6Page Mo.069LSIIIPCArchSDIndoor recreation centre (type C) f area2 r Tin Shul Wai457.881995/96 3rd Qtr1997/98 2nd Qtr6.36108LSIPCArchSDXndoor recreation centre and swimmingpool cojplex, area 14, Tin Shui Wai5160.921991/92 2nd Qtr1993/94 3rd Qtr6.43HOLSIPCArchSDSports ground, area 12, Tin Shul Wai560.001991/92 2nd Qtr1993/94 2nd Qtr6.43149LStOpen space, area 3A, Tin Shul WaiRCTDDQpen space, area 3A, Tin Shul Wai48.361991/92 4th Qtr1992/93 2nd Qtr6.36PCTDDOn costs41.331991/92 4th Qtr1992/93 2nd Qtr6.36150LSIOpen space, area 9, Tin Shul WaiPCTDDqpen space, area 9, Tin Shul Wai44.281990/91 3rd Qtr1991/92 4th Qtr6.36PCTDDOn costs40.041993/94 1st Qtr 11993/94 4th Qtr6.36151LSIVqpen space, area 10, Tin Shul WaiPCTDDOpen space, area 10, Tin Shul Wai418.161995/96 2nd Qtr1996/97 2nd Qtr6.37PCTDDOn costs42.901994/95 2nd Qtr1996/97 2nd Qtr6.37Page 11.29


APPENDIX IIINDEX OF PROJECTS ARRANGED BY WORK TYPETIN SHUI WAIRC PROJECTSJtem No.&Cat.Policy Sec.£AgencyDescriptionPackageCurrentEstimatedCost ($M)ProgranmeStart DateCompletion DatePart 6Page No.TJETSUPE(cont'd)SERVICES152LSIVQpen space, area 21 / Tin Shul WaiPCTDDQpen space, area 21, Tin Shul Wai49.311995/96 2nd Qtr1996/97 2nd Qtr6.37PCTDDOn costs41.491994/95 2nd Qtr1996/97 2nd Qtr6.37160LSIIILocal open space, area 1, Tin Shul WaiPCflSDLocal open space, area 1, Tin Shul Wai42.071993/94 1st Qtr1994/95 1st Qtr6.37PCPSDOn costs40.331992/93 1st Qtr1994/95 1st Qtr6.37182LSJVPCArr&SDIndoor recreation centre (type C) , area14, Tin Shul Wai557.881996/97 3rd Qtr1998/99 2nd Qtr6.43183LSIVOpen space, area 15, Tin Shul WaiPCOT)Open space, area 15, Tin Shul Wai515.911995/96 2nd Qtr1996/97 3rd Qtr6.43PCTDDOn costs52.541994/95 2nd Qtr1996/97 3rd Qtr6.43184LSIVDistrict square, area 29, Tin Shul WaiPCrrw\nAjJUDistrict square, area 29, Tin Shul Wai611.811996/97 4th Qtr1997/98 4th Qtr6.47PCOn costs61.891995/96 4th Qtr1997/98 4th Qtr6.47Page 11.30


APPENDIX IIINDEX OF PROJECTS ARRANGED BY WORK TYPETIN SHUI WAIRC PROJECTSItesn No.&Cat.Policy Sec,&AgencyDescriptioncurrentPart 6Package Estimated Start Date Page No.Cost ( $M ) Ctopletian Date(cont f d)216LSIVOpen space, area 34, Tin Shul WaiPCTDDOpen space, area 34, Tin Shul Wai42.591993/94 1st Qtr1993/94 3rd Qtr6.37PCTDDOn costs40.421993/94 1st Qtr1993/94 3rd Qtr6.37217LSIIIDistrict park - phase I, area 22, TinShul Wai (PC Portion)PC2DDDistrict park - phase I, area 22, TinShul Wai (PC portion)523.001993/94 4th Qtr1994/95 4th Qtr6.43PCTDDOn cost53.681992/93 4th Qtr1994/95 4th Qtr6.43257LSIVDistrict park - phase II, area 22, TinShul WaiPCTDDDistrict park - phase II, area 22, TinShul Wai667.491994/95 2nd Qtr1996/97 1st Qtr6.47PC2DOOn costs610.941993/94 2nd Qtr1996/97 1st Qtr6.47272LSIIIDistrict Park - phase I, area 22, TinShul Wai (sponsored portion)PCPrivateDistrict park - phase I, area 22, TinShul Wai (sponsored area)5-1990/91 4th Qtr1993/94 1st Qtr6.43PCTDDOn costs50.401993/94 1st Qtr1993/94 4th Qtr6.43Page 11.31


APPENDIX IIINDEX OF PROJECTS ARRANGED BY WORK TYPETIN SHUI WAIRC PROJECTSItem No.&Cat.Policy Sec.&TlgencyDescriptionPackageCurrentEstimatedCost ($M)ProgrammeStart DateCompletion DatePart 6Page No.(JJUTUPE MD MTEKTAJNMEM 1(ccnt'd)CVUWPE MDENTERTAINMENTN.I.PCArchSDCultural centre, area 33 A/ Tin Shui Wai.626.501994/95 2nd Qtr1995/96 4th Qtr6.47IEISUKE SERVICESN.I.Qpen spaces, area 25, Tin Shui WaiPCTDDCjpen space, area 25, Tin Shui Wai6—1994/95 1st Qtr1995/96 2nd Qtr6.48PC2DDOpen space, area 25A f Tin Shui Wai6—1994/95 1st Qtr1995/96 2nd Qtr6.48*acm»Qpen space, area 25B f Tin Shui Wai6«.1994/95 1st Qtr1995/96 2nd Qtr6.48SUPPORTINGSERVICES003SPIPCArdhSDRSD Yuen Long vehicle depot530.281990/91 3rd Qtr1991/92 4th Qtr6.44Page 11.32


APPENDIX IIINDEX OF PROJECTS ARRANGED BY WORK TYPETIN SHUI WAIHOUSINGItem No.&Cat.Policy Sec.&AgencyDescriptionPackageCurrentEstimatedCost ($H)ProgrammeStart DateCompletion BatePart 6Page No.Public housing, area 5, Tin. Shul WaiOthersHDTin Ylu Estate phase 1, area 54416.541989/90 3rd Qtr1992/93 1st Qtr6.38OthersHDTin Ylu Estate phase 2, area 54516.221989/90 1st Qtr1992/93 4th Qtr6.38OthersHDTin Ylu Estate phase 3 f area 54589.701989/90 1st Qtr1992/93 3rd Qtr6.38OthersHDTin Ylu Estate phase 4 (HOS) , area 54382.901988/89 3rd Qtr1992/93 2nd Qtr6.38Private housing, areas 5, 8 & 11, TinShul WaiOthersPrivateTin Shul Wai Tom Lot No. 1, area 84-1989/90 1st Qtr1991/92 4th Qtr6.38OthersPrivateTin Shul Wai Town Lot No. 2, area 114-1989/90 4th Qtr1992/93 4th Qtr6.38Public housing, area 16, Tin Sfrizi WaiOthersHDTin Shul Estate phase 1, area 165387.40 \1989/90 4th Qtr1992/93 4th Qtr6.44OthersHDTin Shul Estate phase 2, area 165391.201990/91 3rd Qtr1993/94 3rd Qtr6.44OthersHDTin Shul Estate phase 3, area 165505.101990/91 1st Qtr1992/93 4th Qtr6.44OthersHDTin Shul Estate phase 4, area 165570.201990/91 3rd Qtr1993/94 2nd Qtr6.44Page 11.33


APPENDIX IIINDEX OF PROJECTS ARRANGED BY WORK TYPETIN SHUI WAIHOUSINGItem No.£Cat.Policy Sec.&AgencyDescriptionPackageCurrentEstimatedCost ($M)ProgrammeStart DateCorpletion DatePart 6Page No.Private housing, areas 19 f 23 & 24, TinShui WaiOthersPrivateComercial/ residential housing, area 23;TSV TL 4(part)5-1993/94 3rd Qtr1995/96 3rd Qtr6.44OttersPrivateRl housing, area 24; 2S57 TL 75_.1991/92 2nd Qtr1994/95 1st Qtr6.44OttersPrivateRl housing, area 19; TSW TL 35—1991/92 1st Qtr1993/94 1st Qtr6.44Private housing, areas 20, 27 & 28, TinShui WaiOttersPrivateCommrcial/residential housing, area 20;TSW TL 4(part)6—1993/94 3rd Qtr1995/96 3rd Qtr6.48OttersPrivateRl housing, area 27; TSV TL 56—1992/93 4th Qtr1996/97 3rd Qtr6.48OttersPrivateRl housing, area 28; TSW TL 66—1993/94 4th Qtr1996/97 4th Qtr6.48Public housing, area 13, Tin Shui WaiOttersHDTin Shui Wai Area 13, Phase 14513.151993/94 3rd Qtr1997/98 3rd Qtr6.38OthersHDTin Shui Wai Area 13, Phase 24416.551994/95 1st Qtr1997/98 4th Qtr6.38Page 11.34


APPENDIX IIINDEX OF PROJECTS ARRANGED BY WORK TYPENORTH WEST NTCIVIL ENGINEERINGItem No.&Cat.Policy Sec.&AgencyDescriptionPackageCurrentEstimatedCost ($M)ProgrdflZfieStart DateCompletion DatePart 6Page No.0210)ACIVIL MGENEERINGDrainage & Erosion ProtectionNorth West New Territories <strong>development</strong> -main drainage channels for Tin Shui WaihinterlandSPELDSDNorth West New Territories developmtnt -<strong>wai</strong>n drainage channels for Tin Shui Waihinterland (Contract No. CV/ 88/01)327.201989/90 1st Qtr1992/93 1st Qtr6.60SPELDSDNorth West New Territories <strong>development</strong> -main drainage channels for Tin Shui Waihinterland (Contract No. CV/ 88/02)321.261989/90 3rd Qtr1991/92 4th Qtr6.60SPELBSDNorth West New Territories <strong>development</strong> -main, drainage channels for Tin Shui Waihinterland (Contract No. O//89/06)370.991989/90 3rd Qtr1992/93 2nd Qtr6.60SPELDSDNorth West New Territories <strong>development</strong> -main drainage channels for Tin Shui Waihinterland (Contract No. DR/ 89/01)39.491990/91 3rd Qtr1992/93 1st Qtr6.60SPELHDDNorth West New Territories <strong>development</strong> -main drainage channels for Tin Shui Waihinterland - miscellaneous and landscapeworks36.06-6.60022CDBNorth West New Territories <strong>development</strong> -main drainage channels for Yuen <strong>long</strong>and Kam Tin - jrerTHinder-SPELDSDNorth West New Territories <strong>development</strong> -main drainage channels for Yuen Longand Kam Tin - remainder (phase 1)3249.901995/96 3rd Qtr1998/99 1st Qtr6.61SPELDSDNorth West New Territories <strong>development</strong> -main drainage channels for Yuen Longand Kam Tin - remainder (phase 2)3125.001995/96 4th Qtr1997/98 4th Qtr6.61SPELDSDNorth West New Territories <strong>development</strong> -main drainage channels for Yuen Longand Kam Tin - remainder (phase 3)3103.941996/97 3rd Qtr1998/99 3rd Qtr6.61SPELTDDNorth West New Territories <strong>development</strong> -main drainage channels for Yuen Longand Kam Tin- remainder (phase 4)3104.161996/97 1st Qtr1998/99 3rd Qtr6.61Page 11.35


APPENDIX IIINDEX OF PROJECTS ARRANGED BY WORK TYPENORTH WEST NTCIVIL ENGINEERINGItem No.ScCat.Policy Sec.&AgencyDescriptionPackageCurrentEstimatedCost ($M)ProgranweStart DateCompletion DatePart 6Page tfo.GTVTL JSJNGZKEEJRINGDrainage & Erosion Protection(cont'd)0230)BSPELDSDNorth West New Territories <strong>development</strong> -village flood pzDtection for Tin ShuiWai hinterland7130.001994/95 3rd Qtr1999/00 2nd Qtr6.79029COBMain drainage channels for Ngau Tarn MeiSPELD®>Main drainage channels for Ngau Tarn Mei(phase 1)7160.681994/95 1st Qtr1997/98 1st Qtr6.79SPELDSDMain drainage channels for Ngau Tarn Mei(phase 2)777.321995/96 2nd Qtr1998/99 2nd Qtr6.79030CDBSPELDSDVillage flood protection for Yuen Long,Kam Tin and Ngau Tarn Mei f North West NewTerritories7312.001994/95 3zd Qtr2001/02 3rd Qtr6.79035CDBSPELDSDMain drainage channels for San Tin fNorth West New Territories7170.001994/95 Jztf Qtr1998/99 4th Qtr6.79043CDBNorth West New Territories <strong>development</strong> -main drainage channels for Yuen Longand Kam Tin - stage ISPELDSDNorth West New Territories <strong>development</strong> -main drainage channels for Yuen Longand Kam Tin - Stage X (pfcase i)3445.281993/94 2nd Qtr1997/98 2nd Qtr6.61SPELDSDNorth West New Territories <strong>development</strong> -main drainage channels for Yuen Longand Kam Tin ~ Stage I (phase 2)3402.001993/94 4th Qtr1997/98 4th Qtr6.61SPELDSDNorth West New Territories <strong>development</strong> -main drainage channels for Yuen Longand Kam Tin - Stage I (phase 3)3194.721995/96 1st Qtr1998/99 1st Qtr6.62Page 11.36


Item No&Cat.APPENDIX IIINDEX OF PROJECTS ARRANGED BY WORK TYPENORTH WEST NTCIVIL ENGINEERINGPolicy Sec&Agency— — __ __-Description~— — — — — __CIVIL ENGINEERINGLand DevelopmentPackageCurrentEstimatedCbst ( $M )ProgrammeStart DateCtwpletion £JatePart 6Page No.184CLCSPELTDDDevelopment of remaining ruralhinterland In the North West NewTerritories - engineering works4254.001997/98 1st Qtr2003/04 2nd Qtr6.63189CLCSPELWDLau Fau Shan <strong>development</strong>, package 3440.001998/99 2nd Qtr2001/02 2nd Qtr6.63191CLBSPELWDPing Shan <strong>development</strong>, remainder1130.001996/97 3rd Qtr2000/01 3rd Qtr6.49207CLBLau Fau Shan <strong>development</strong>, package 4SPELIDDSite formation, roads and drains4100.991995/96 3rd Qtr1999/00 2nd Qtr6.63SPELTDDSewage pumping station418.751995/96 3rd Qtr1997/98 3rd Qtr6.63213CLBSPELTDDYlr-IN corridor / rural hinterland -engineering works for village priorityareas (nos. 1-13)188.501995/96 1st Qtr1999/0) 2nd Qtr6.49218CLCSPELTDDKam Tin rural <strong>development</strong> - remainingengineering works4150.001997/98 1st Qtr2001/02 3rd Qtr6.63219CLBSPELTDDSan Tin <strong>development</strong> - engineering works470.001996/97 3rd Qtr\1999/00 4th Qtr6.63222CLBYlr-TN corridor - engineering works fornew residential areas at Hung Shul Kluand San Hing TsuenSPELTDDYlrTM corridor - engineering works fornew residential areas at San Hing Tsuen128.00994/95 3rd Qtr996/97 4th Qtr6.49SPELm»YlrTM corridor - engineering works fornew residential areas at Hung Shul Kiu181.00995/96 1st Qtr999/00 2nd Qtr6.49Page 11.37


APPENDIX IIINDEX OF PROJECTS ARRANGED BY WORK TYPENORTH WEST NTCIVIL ENGINEERINGItem No.&Cat.Policy Sec.&-AgencyDescriptionPackageCurrentEstimatedCost ($M)ProgranineStart DateCompletion DatePart 6Page No.CTVUr ENGINEERINGLand Development(cantf d)224CLBYIHIfi corridor - engineering works forindustrial upgrading areas at San HingTsuen, 2bng Tan San Tsuen, Kiu Tau Waiand Tan JC<strong>wai</strong> TsuenSPELTDDEngineering works at Tuen Mun area126.601995/96 4th Qtr1997/98 3rd Qtr6.49SPELTDDEngineering works at Yuen Long area1119.401995/96 4th Qtr1998/99 4th Qtr6.49225CLBSPELHyD2Zr-2H corridor - engineering works forccmnercial/residential area, at Hung ShwLKin, Stage II144.001994/95 1st Qtr1995/96 3rd Qtr6.50252CLCSPELTDDZL-2H corridor / nzral hinterland -engineering works for village priorityareas (nos. 14-24)175.001997/98 3rd Qtr2001/02 3rd Qtr6.50253CLBYL-TM corridor - engineering works forHung Shut Kiu and Ping ShanSPELWDYL-TM corridor - engineering works forHung Shin. Kiu138.591994/95 3rd Qtr1999/00 3rd Qtr6.50SPELTDDYZr~ZM corridor - engineering works forPing Shan122.411995/96 2nd Qtr1997/98 2nd Qtr6.50254CLCYlr-TH corridor - engineering works forYick Yuen (south) area 111, Lam Te±,area 55, San Sang Tsuen f area 123SPELTDDYL-m corridor - engineering works atTuen Mzn area136.001997/98 1st Qtr2000/01 4th Qtr6.50SPELTDDYlrWM corridor - engineering works atYuen Long area180.001997/98 1st Qtr2000/01 4th Qtr6.50Pacre


APPENDIX IIINDEX OF PROJECTS ARRANGED BY WORK TYPENORTH WEST NTCIVIL ENGINEERINGItem No.&Cat.Policy Sec.&AgencyDescriptionPackageCurrentEstimatedCost ($M)Start Datedepletion DatePart 6Page No.CIVIL ENGINEERINGLand Development(cont'd)2550,BHHZH corridor - engineering works forSan Hing Tsuen, extension area 92 andTong Tan San Tsuen, extension area 70SPELWDYLr~Zft corridor - engineering works atYuen Long area125.001996/97 3rd Qtr1999/00 4th Qtr6.51SPELTEX)Ylr-TM corridor - engineering works atYuen Long area180.001997/98 3rd Qtr2000/01 4th Qtr6.512900,BSPELTDDKam Tin rural <strong>development</strong> - engineeringworks, phase I443.501994/95 3rd Qtr1996/97 3rd Qtr6.63314CLPing Shan <strong>development</strong>, stage ISPELTDDPing Shan <strong>development</strong>, stage I141.291991/92 4th Qtr1993/94 2nd Qtr6.513170,*YLr*M corridor - engineering works atHung Shul Klu, stage I f phase I, siteformation for schoolsSPELHyDOtfters/Cbn<strong>tin</strong>gencies10.94-mm6.51346CLiYlrTM corridor - engineering worfcs foroimrjierical/ziesidential area at Hung ShulKlu, stage I, phase 2SPELHyDYlf-TM corridor - engineering works forcojinercial/2iesidential area at Hung ShulKlu, stage I, phase 2114.801990/91 1st. Qtr1991/92 2nd Qtr6.52Page 11.39


APPENDIX IIINDEX OF PROJECTS ARRANGED BY WORK TYPENORTH WEST NTCIVIL ENGINEERINGItem No.&Cat.PoLLcy Sec.&AgencyDescriptionPackageCurrentEstimatedCost ($M)ProgrammeStart DateCompletion DatePart 6Page No.dVXL ENGINEERINGLand Development(cotxt'd)N.I.SPELTDDKiu Tau Wai jjidustrial area developTient150.001996/97 3rd Qtr1998/99 4th Qtr6.52ENVIRONMENTAL PH2TECTICWSewerage and Sewage Treatment06 IDSBSPELBSDNorth West New Territories <strong>development</strong> -trunk sewers, sewage pumping stationsand rising mains - stage III6155.131994/95 1st Qtr2000/01 2nd Qtr6.76063DSr»SPELTDDForth West New Territories <strong>development</strong> -sewage treatment plant, remainder6906.001997/98 1st Qtr2000/01 4th Qtr6.76084DSASPELDSDNorth West New Territories <strong>development</strong> -trunk sewers, sewage pumping stationsand rising mains - stage J reminder656.201989/90 1st Qtr1996/97 3rd Qtr6.76087DSASPELTDDNorth West New Territories develqpment -trunk sewers, sewage punping stationsand rising mains - stage J (Contract No.NTDB 33/85 (part))611.001987/88 4th Qtr1990/91 1st Qtr6.76089DSANorth West New Territories <strong>development</strong> -trunk sewers, sewage punping stationsand rising mains - stage IISPELDSDWorth West New Territories <strong>development</strong> -trunk sewers, sewage punping stationsand rising mains - stage II ( ContractNo. 07/89/12)640.221989/90 4th Qtr1991/92 3rd Qtr6.76SPELDSDNorth West New Territories <strong>development</strong> -tncik sewers, sewage punping stationsand rising mains -. stage II fCbntractNo. CV/ 89/13)657.201989/90 4th Qtr1991/92 3rd Qtr6.76SPELDSDForth West New Territories <strong>development</strong> -trunk sewers, sewage punping stationsand rising imins - stage II fCbntractNo. 1006/M/89)649.001989/90 3rd Qtr1991/92 3rd Qtr6.77Page 11.40


APPENDIX IIINDEX OF PROJECTS ARRANGED BY WORK TYPENORTH WEST NTCIVIL ENGINEERINGItem No.&Cat.Policy Sec.&AgencyDescriptionPackageCurrentEstimatedCost ($M)Start DateQafpletion DatePart 6Page Mb.Sewerage and Sewage 2!reatment(oont'd)089DSA(cont'd)North West New ^territories <strong>development</strong> ~trunk sewers, sewage piping stationsand rising mains - stage ITSPELTDDNorth West New territories <strong>development</strong> -trunk sewers, sewage pimping stationsand rising mains - stage U (ContractNo. 2H 69/88 (part))65.081990/91 2nd Qtr1991/92 4th Qtr6.77SPELDSDNorth West New Territories <strong>development</strong> -trunk sewers, sewage punping stationsand rising mains - stage II fp/s phase64.751995/96 2nd Qtr1996/97 3rd Qtr6.77SPELTDDNorth West New Territories Development -trunfe sewers, sewage pooping stationsand rising mains - stage U(miscellaneous)610.751995/96 2nd Qtr1996/97 3rd Qtr6.77090DSANorth West New Territories <strong>development</strong> -sewage treatment plant (stage l) feffluent tunnel and effluent outfallSPELTDDContract IN 69/88 - 21znnel, access roadand site formation6375.111989/90 3rd Qtr1992/93 3rd Qtr6.78SPELTDDContract TM 70/88 - Submarine outfall toUrmston road6249.521990/91 2nd Qtr1992/93 3rd Qtr6.78SPELTDDMiscellaneous6129.681989/90 3rd Qtr1993/94 3rd Qtr6.78SPELDSDSewage treatment plant688.291990/91 2nd Qtr1992/93 2nd Qtr6.78Page 11.41


APPENDIX IIINDEX OF PROJECTS ARRANGED BY WORK TYPENORTH WEST NTCIVIL ENGINEERINGItem No.Cat.Policy Sec.£-AgencyDescriptionPackageCurrentEstimatedCost ($M)ProgrammeStart JOateCbrypletion DatePart 6Page No.EtmPCmENTAL PBOTBCTICWSewerage and Sewage Treatmentfcont'dj109DSBSPELDSDProvision of sewer and sewage treatmentplants in rural areas in the NT59.701993/94 1st Qtr1998/99 1st Qtr6.74138DSASPELDSDDrprovement of sewarage provision to KluTau Wai industrial area51.801992/93 3rd Qtr1993/94 4th Qtr6.74Rural Housing Improvement015HHAImprovement to Urban Fringe and RuralAreas in New Territories 1988-89SPELDSDTal Kel Leng - drainage improvement50.281988/89 3rd Qtr1990/91 3rd Qtr6.74016HHAImprovement to Cfeban Fringe and RuralAreas in New Territories 1989-90SPELTDDChun Hing Village near Fung Chi HeungvWang Chau - drainage improvement55.001992/93 3rd Qtr1994/95 4th Qtr6.74SPELDSDKau Hul - drainage improvement (phaseII)50.401991/92 1st Qtr1991/92 1st Qtr6.74019HHAVillage improvement works and<strong>development</strong> schemes in the N.T. : 1990 -1991 <strong>programme</strong>SPELHyDLocal drainage improvement at Pok Wai52.401992/93 1st Qtr1993/94 3rd Qtr6*75020WAVillage improvement and <strong>development</strong>schemes in the NT : 1991 - 92 program*®SPEDDSDTin Ha Jtoad, Ha Tsuen drainageimprwemsnt55.001993/94 2nd Qtr1994/95 3rd Qtr6.75S&ELDSDHai Po Lung, Local drainage improvement53.501993/94 2nd Qtr1994/95 3rd Qtr6.75Page 11.42


APPENDIX IIINDEX OF PROJECTS ARRANGED BY WORK TYPENORTH WEST NTCIVIL ENGINEERINGCat.Pol±cy Sec.&AgencyDescriptionPackageCurrentKstiiTHtecfCbst ($M)Start DateCoipletion DatePart 6Page No.-— —HOUSWGRural Bousing Inprov&nsnt(cont'd)1®W**•*)Village improvement and dsvelqprraentschemes in the NT s 1991 - 92 <strong>programme</strong>SPEC*DSDTai. Kong Po f Provision and inprovementof comunal irrigation ami fielddrainage facilities50.581991/92 3rd Qtr1991/92 4th Qtr6.75TRANSPORTRoads532HSPELTDDHr-IH corricibr - site formation, roads &drains at Tan Kvai Tsuen, Hung Sbui Xui& San Hing Tsuen130.001998/99 1st Qtr2000/01 4th Qtr6.52?82HS for THyDTuen Ikan^-Tuen Mun Eastern Corridor andTuen Long West Link: site investigationsand works2830.551990/91 1st Qtr1993/94 2nd Qtr6.55Page 11*43


APPENDIX IIINDEX OF PROJECTS ARRANGED BY WORK TYPENORTH WEST NTHIGHWAYSItem No.&Cat.Policy Sec.&AgencyDescriptionPackageCUrziantEstimatedCost ($M)Start DateCompletion DatePart 6Page No.HOUSING.Rural Housing Improvement013HHASPEL,3BDFootpath and van tracks in Yeung UkTsuen51.001991/92 3rd Qtr1991/92 4th Qtr5.70014HHAImprovement to Urban Fringe and RuralAreas in New territories 1987-88SPELHyDKam Tsin Wai - improvement of accessroad51.951990/91 2nd Qtr1991/92 3rd Qtr6.70018HHBSPELHyDVillage improvement and <strong>development</strong>schemes in the NT515.201993/94 1st Qtr1998/99 1st Qtr6.70019HHAVillage improvement worfes anddevelcpraent schemes in the N.T. ** 1990 -1991 programs?®SPELHyDVillage improvement works near Lo UkTsuen, pftase X - formation of part VEA50.801993/94 2nd Qtr1993/94 4th Qtr6.70023HHAVillage improvements and <strong>development</strong>schemes in NT : 1992 - 1993 program*?SPELWSDPak Nai - improvement of irrigationfacilities52.001992/93 4th Qtr1993/94 2nd Qtr6.71SPELOttersTsat Sing Kong, improvement ofirrigation facilities51.001993/94 3rd Qtr1994/95 1st Qtr6.71SPELWSDWater Supply to Sheung & Ha Pak Nai52.501992/93 4th Qtr1994/95 2nd Qtr6.71ZKWSPORTRoadsosornAS for THyDNT Circular road improvements, flu Tau toFan Kam Jtoad - pfcase X to XV21070.501984/85 1st Qtr1992/93 4th Qtr6.55Page 11.44


APPENDIX IIINDEX OF PROJECTS ARRANGED BY WORK TYPENORTH WEST NTHIGHWAYSItem No.&Cat.Policy Sec.£AgencyDescriptionCurrent ProgranwePackage Estimated Start DateCbst ( $M) Ctepletion Dateart 6age No.TRMSPQRTtoads(cont'd)Q92TBASforTHyDVehicular boarder link at Lok Ma Chu± -consultants fees, investigations andworks2341 .20983/84 2nd Qtr"991/92 3rd Qtr6.55109THrtS for THyDNorth West New Territories <strong>development</strong> -improvement to Kam Tin Jtoad2291.00997/98 1st Qtr000/01 1st Qtr6.55172THBS for THyDNT Circular Road improvements, Au Tau toFan Kam Road - An Tau l?vpass andreraining works2720.00996/97 2nd Qtr999/00 2nd Qtr6.55178THBS for THyDVehicular border link at Lok Ha Chau /remaining works295.00995/96 1st Qtr995/96 4th Qtr6.56214THCS for THyDTang Yan San Tsuen roads and drainsstage II132.50997/98 1st Qtr998/99 3rd Qtr6.52246THCS for THyDNorth West Territories <strong>development</strong> - KamTin jbvpass stage J299.00997/98 1st Qtr999/00 3rd Qtr6.56248THANorth West New Territories developmsnt,Tin Shul Wai east access and Long PingEstate linkS for TTDDRoadworks285.701989/90 3rd Qtr1991/92 4th Qtr6.565 for TTDDMiscellaneous221 .241989/90 3rd 'Qtr1991/92 4th Qtr6.56249THAS for THyDNorth West New Territories <strong>development</strong> -7uen Long southern bypass2373.781991/92 4th Qtr1994/95 2nd Qtr6.56275THBS for T2DDPing Ha Road improvement - remainingworks220.001994/95 1st Qtr1995/96 4th Qtr6.56Page 11.45


APPENDIX IIINDEX OF PROJECTS ARRANGED BY WORK TYPENORTH WEST NTHIGHWAYSItem No.&Cat.Policy Sec,&AgencyDescriptionPackageQirrentEstimatedCost ($M)ProgrammeStart DateCbrypletion DatePart 6Page No.TPMSPQKTPoads(cont'd)308mANorth West Mew Territories <strong>development</strong> -Tin Shui Wai west accessS for TTDDTin Shui Wai west access2186.601992/93 3rd Qtr1995/96 3rd Qtr6.56S for T2DDLandscaping and miscellaneous210.501994/95 3rd Qtr1996/97 4th Qtr6.56336THBS for THyDKoad link between the North West NewTerritories and West Kcwloon (Route 3) -works for country park section and TingKau Bridge29056.001994/95 4th Qtr1998/99 3rd Qtr6.57351THAS for THyDNorth West New Territories <strong>development</strong> -Yuen <strong>long</strong> southern bypass, consultantsfees and investigations219.261987/88 1st Qtr1994/95 2nd Qtr6.57436WCS for THyDDeep Bay coastal road2134.001997/98 1st Qtr2000/01 3rd Qtr6.57446THBSPELHyDImprovement, recx^nstruction andextension of village access roads in theNT520.201993/94 1st Qtr1995/96 4th Qtr6.71475WAImprovement, reconstruction andextension of village access in tne N.T.: 1990 - 91 <strong>programme</strong>SPELHyDVillage improvement worfcs near Lo UkTsuen, phase II - oonstruction of accessroad and carparfc51.801993/94 2nd Qtr1993/94 4th Qtr6.71SPELHyDVillage improvement works Jiear Lo UkTsuen, phase JIT - cxinstruction offootpath connection the VEA to jtoad B1650.501993/94 2nd Qtr1993/94 4th Qtr6.71SPELHyDMang Tseng ^ai, access improvement fromDeep Bay i?oad to Hong Tseng Wai50.881991/92 2nd Qtr1992/93 1st Qtr6.71Page 11.46


APPENDIX IIINDEX OF PROJECTS ARRANGED BY WORK TYPENORTH WEST NTHIGHWAYSItem Ho.&Cat.Policy Sec.&AgencyDescriptionPackageCurrentEstimatedCost ( $M )PrograwtfiBStart DateCbopletion DatePart 6Page Ho.TRMSPCKTJtoads(cont'dj484THAInprov&nentf reconstruction ancfextension of village access roads in theNew Territories: 1991-1992 Program®SPELHyDUpgrading of Sfeefc Wu Tong access road53.701994/95 4th Qtr995/96 4th Qtr6.72SPELHyDNgau Tarn Mel access road f phase I54.50994/95 2nd Qtr995/96 3rd Qtr6.72SPELHyDReconstruction of access road to FungKong Tsuen51.501994/95 3rd Qtr995/96 2nd Qtr6.72SPELHyDHung Shul Klu, Tin Sam Roadreconstruction of van track51.20992/93 1st Qtr992/93 3rd Qtr6.72SPELHyDYuen Kong San Tsuen, reconstruction ofvan track51.50993/94 2nd Qtr993/94 4th Qtr6.72SPELHyDTal Kong Po f provision and improvementof farm access50.95992/93 4th Qtr993/94 2nd Qtr6.72504THAInprovement, reconstruction andextension of village access roads in theNew Territories ; 1992 - 1993 programsSPELOthersPavement and footpath at Sik Kong Tsuen,Ha Tsuen, Juen Long51.001992/93 4th Qtr1993/94 1st Qtr6.72SPELOthersJteconstruction of van track from TungChan Wai to Yan Sau Wai, San Tin50.701993/94 2nd Qtr1993/94 4th Qtr6.72SPELOthersResurfacing of van track at Fung KatHeung, Kam Tin50.851993/94 2nd Qtr1993/94 4th Qtr6.73SPELOthersReconstruction of van track at Hung ToJtoad, Chau Tan, San Tin50.401993/94 3rd Qtr1994/95 4th Qtr6.73SPELOthersVan track and footpath at Wong Nal Tun,Shap Pat Heung, Yuen Long50.451992/93 4th Qtr1993/94 1st Qtr6.73Pacre 11.47


APPENDIX IIINDEX OF PROJECTS ARRANGED BY WORK TYPENORTH WEST NTHIGHWAYSItem No.&Cat.Policy Sec*&AgencyDescriptionPackageCurrentEstimatedCost ($M)PrograameStart DateOxpletion. DatePart 6Page No.TRWSPORT(cont'd)504mAfcont'djImprovement, jneconstiruction andextension of vi Llage access roads in theNew Territories : 1992 - 1993 program®SPJSLOthersTsat Sing Kong, improvement of farmaccess50.701993/94 2nd Qtr1993/94 3rd Qtr6.73Page 11.48


APPENDIX IIINDEX OF PROJECTS ARRANGED BY WORK TYPENORTH WEST NTWATERWORKSItem No*&Cat.Policy Sec.&AgencyDescriptionPackageCurrentEstimatedCost ($H)ProgranzneStart DateCbrzpletion DatePart 6Page No.WATER SUPPLIESFresh Water Supplies034WFBYuen Long water supply - remaining worksS for WWSDYuen Long water supply - remainingworks. Tan Jfi<strong>wai</strong> Tsuen Service Reservoir- Stage I369.621993/94 3rd Qtr1996/97 1st Qtr6.58S forWWSDYuen Long water supply - remainingworks. Tan K<strong>wai</strong> Tsuen Service Reservoir- Stage II and additional trunk mains377.001994/95 4th Qtr1997/98 1st Qtr6.58047WFAS for WWSDPrincipal distribution system betweenSan Tin, San Wai and Kwu Tung319.651982/83 1st Qtr1991/92 4th Qtr6.58nowAS for WWSDWater treatment and transfer facilitiesat Au Tau, Yuen Long - stage J3429.361986/87 3rd Qtr1993/94 2nd Qtr6.59141WFBAdditional treatment and transferfacilities for North Western NewTerritoriesS for WWSDAdditional treatment and transferfacilities for North Western NewTerritories (Ngau Tarn Mel TreatmentWorks -Stage I) (Part A - Design Fees)315.001994/95 3rd Qtr1994/95 4th Qtr6.59S for WWSDAdditional treatment and transferfacilities for Northwestern NewTerritories (Ngau Tarn Hel TreatmentWorks -Stage I) (Part B - Works)3390.001996/97 2nd Qtr1999/00 3rd Qtr6.59144WFAS for WWSDWater treatment and tranfer facilitiesat Au Tau, Yuen Long. Stage 2 -Investigation and design3302.561988/89 3rd Qtr1994/95 2nd Qtr6.59Page IT.49


APPENDIX IIINDEX OF PROJECTS ARRANGED BY WORK TYPENORTH WEST NTCOMMUNITY FACILITIESItem No.&Cat.Policy Sec.AgencyDescriptionPackageCurrentEstimatedCost ($M)ProgrammeStart DateCbrspletiora DatePart 6Page ifo.PUBLIC SAFETYFire ServicesN.I.S for SSub-divisional fire station andambulance depot at Hung Shu± Kiu, NWNT425.001997/98 3rd Qtr1999/00 2nd Qtr6.64Land Development320CLBSPELTDDTa± Tong East borrow area landscapeworks334.001993/94 1st Qtr1997/98 2nd Qtr6.60EDUCATIONPrimaryN.I.N.I.smArtihSDsmArtihSDPrimary school, Ping Shan, NWTPrimary school, Wing Lung Wai, Kam Tin,WNT4433.5033.501997/98 1st Qtr1998/99 2nd Qtr1997/98 4th Qtr1999/00 2nd Qtr6.646.64N.I.SMArdhSDPrimary school, Fung Kat Heung, WNT433.501997/98 1st Qtr1998/99 2nd Qtr6.64N.I.SEMArcfoSDPrimary school, Hung Tso Tin, WWOT433.501997/98 1st Qtr1998/99 2nd Qtr6.64N.I.SEHArtihSDPrimary school, Ngau Tarn Mei, NWNT433.501997/98 1st Qtr1998/99 2nd Qtr6.64N.I.N.I.SEHsmArchSDPrimary school, Sheung Chuk Yuen, NWNTPrimary school, Fairview Park, NWNT4433.5033.501998/99 1st Qtr1999/00 2nd Qtr1997/98 1st Qtr1998/99 2nd Qtr6.646.64Page 11.50


APPENDIX IIINDEX OF PROJECTS ARRANGED BY WORK TYPENORTH WEST NTCOMMUNITY FACILITIESItem No.&Cat.Policy Sec.&AgencyDescriptionPackageCurrentEstimatedCost ($N)ProgranmeStart DateCompletion DatePart 6Page No.EDUCATIONPrimary(cont'd)N.I.SEMArdhSDPrimary school, Pak Na±/NWNT433.501998/99 1st Qtr1999/00 2nd Qtr6.64Secondary102ESATwo secondary schools, area 74, HungShod. Kiu, North West New TerritoriessmArdhSDTwo secondary schools, area 74, HungShui. Kiu, NWNT460.861989/90 3rd Qtr1991/92 2nd Qtr6.64smArdhSDOthers/con<strong>tin</strong>gencies47.14-_6.64103ESASecondary school, Fairview Park, NorthWest New TerritoriesSEMArchSDSecondary school, Fairview Park, NWNT429.661988/89 1st Qtr1989/90 2nd Qtr6.65SEMArdhSDOthers/ 'con<strong>tin</strong>gencies40.84-~6.65N.I.SEMArchSDSecondary school, Ping Shan, NWNT443.001997/98 1st Qtr1999/00 1st Qtr6.65N.I.SEMArdhSDSecondary school, Kam Tin, NWNT443.001997/98 1st Qtr1999/00 1st Qtr6.65N.I.SEMArchSDSecondary school, San Tw, NWNT443.001998/99 1st Qtr2000/01 1st Qtr6.65Page 11*51


APPENDIX IIINDEX OF PROJECTS ARRANGED BY WORK TYPENORTH WEST NTCOMMUNITY FACILITIESItem No.&Cat.Policy fee.&AgencyDescriptionPackagecurrentEstimatedCost ($M)PrpgnranraeStart DateCompletion DatePart 6Page No.K3QD SUPPLYAbbatoirs, Wholesale Markets &Quaran<strong>tin</strong>e FacilitiesN.I.SESArtihSDFish market, Lau Fau Shan, MtfNT46.001998/99 1st Qtr1999/00 2nd Qtr6.65BOOKING.Rural Housing Jtiprovememt016HHAInprovement to Urban Fringe and RuralAreas in Nav Iterritories 1989-90SPELOthersNam Pin Wai Village Landscape Area51.001992/93 1st Qtr1992/93 3rd Qtr6.73MEDICAL AND HEMJmClinicsN.I.SFWArtihSDClinic, Km Tin, MNT432.001997/98 2nd Qtr1998/99 3rd Qtr6.65N.I.stwArdhSDClinic, San Tin, NWNT432.001997/98 2nd Qtr1998/99 3rd Qtr6.65SQCZKL WELFAREConmmity Centres099SCClooseCSHAArtihSDSHAArtihSDArea comunity centre, Hung Shui Kiu,WNTArea ccnmmity centre, Kam Tin, MNT4443.0043.001997/98 1st Qtr1999/00 1st Qtr1997/98 1st Qtr1999/00 3rd Qtr6.656.66M.I.SHAArt&SDAiBa ccmunity centre, Lau Fau Shan,WNT443.001997/98 1st Qtr1998/99 3rd Qtr6.66Page 11.52


APPENDIX IIINDEX OF PROJECTS ARRANGED BY WORK TYPENORTH WEST NTCOMMUNITY FACILITIESItem No.&Cat.Policy Sec.&AgencyDescriptionPackageCurrentEstimatedCost ($M)ProgranmeStart DateQarTpietion DatePart 6Page No.SDCTAL WKTJPMF.CbOTnunity Centresfcant'djN.I.SHAArchSDNeighbourhood ccnmmity centre, San Tin fWNT438.001997/98 1st Qtr1998/99 3rd Qtr6.66N.I.SHMArdhSDCbramunity had I/ social centre forelderly, Fung Kat Heung, NWNT420.001997/98 1st Qtr1998/99 2nd Qtr6.66N.I.SHWArtihSDConmmity hall /social service centre forthe elderly f Hung Tso Tin, NWNT420.001997/98 1st Qtr1998/99 2nd Qtr6.66N.I.SHWArdhSDCctmimity hall/social service centre forthe elderly, Sheung Chuk Yuen, NWNT420.001997/98 1st Qtr1998/99 2nd Qtr6.66N.I.SHWArchSDQxnmunity hall/social service centre forthe elderly, Pak Nai, W8T420.001998/99 1st Qtr1999/00 2nd Qtr6.66Page 11.53


APPENDIX IIINDEX OF PROJECTS ARRANGED BY WORK TYPENORTH WEST NTRC PROJECTSItem No.&Cat.Policy Sec.&AgencyDescriptionPackageCurrentEstimatedCost ($M)ProgrssflnieStart DateCompletion DatePart 6Page No.TFrr8Up]S SERVTCES?(cont'd)177LSIVLocal open space, Ping ShanPCWDLocal open space, Ping Shan112.401996/97 3rd Qtr1997/98 3rd Qtr6.53PCTDDOn costs11.981995/96 3rd Qtr1997/98 3rd Qtr6.53178LSIVLocal open space f Hung Shui Kiu, phase IPCIE*DLocal open space , Hung Shui K±u f phase I110.041996/97 1st Qtr1996/97 4th Qtr6.53PCTDDOn costs11.611995/96 1st Qtr1996/97 4th Qtr6.53179LSIVHung Shui Kiu town squarePCTDDHung Shu± Kiu torn square18.271996/97 2nd Qtr1997/98 3rd Qtr6.53PCTDDOn costs11.321995/96 1st Qtr1997/98 3rd Qtr6.53187LSIVPCArchSDSwimning pool corplex, Kam Tin, MNT457.881995/96 3rd Qtr1997/98 2nd Qtr6*68188LSIVPCArdhSDIndoor recreation centre (type B), KamTin, JNWNT441.241995/96 3rd Qtr1997/98 2nd Qtr6.68259LSIVLocal open space, Hung Shui Kiu f PhaseIIPCTDDLocal open ^pace, Hung Shui Kiu, phaseII117.121996/97 3rd Qtr1998/99 1st Qtr6.53PCTDDOn costs12.741994/95 3rd Qtr1998/99 1st Qtr6.53Page 11.55


NORTH WEST NEW TERRITORIES DEVELOPMENT OFFICETIN SHUI WAI/YUEN LONG DEVELOPMENTPROGRAMME1993 EDITIONAPPENDIX III - LOCATION PLANSDRG. NO.TITLEMlM2M3M4M5M6North West New Territories - Location PlanYuen Long New Town Development - General Land Use ProposalTin Shui Wai New Town Development - General Land Use ProposalYL/TM Corridor - General Land Use ProposalYuen Long New Town Development PackagesTin Shui Wai New Town Development PackagesIII. 1


TCEflSf rfr!YUEN LONG NEW TOWNDEVELOPMENT PACKAGES''im^nmm;\fV^"-..1:.fOOOQPACKAGE 3PACKAGE 4PACKAGE 5PACKAGE 6PACKAGE 7ISlIli4aiiiPACKAGE 9 3!PACKAGE 10PACKAGE 11PACKAGE 12ISiiilili812*8181Mill;PLANNING AREA NUMBER"'T^v"''' 1 '' 1 'V^if'-Jlr,**%$ .4JA. :-^»r°, : ^^} ^~'*»X 'tfSf 1*S ° i V*** J v //T ... "$&^fc;;lsd(IJl,vV/^ ^.V^^f^U^ \ ' "*;*•»" ' -.^'-ss^>X• J«\*+«^\ ' )*-,, vM»WS^m\mM\M• •'(_j|T"* :Tr ')%;>s-)It if 5it i^gi^;rJ^±i^i±i^^^^^Y^^^^^c^Ja^S55WSffi-LLLJ^-lJtlh 1^! 1 ! 1 ?.»*».-«.» k^tji,^^ v«»< VTC* )4J&V/ Vr>


XnruUJ•xjLnuiruLUDCfr0> COH-J ,-p0 &d P.3D s:3 tf"-t- M-'i ^1 C> (Di ^tr*OODco


•Designed by Government InformatioruServicesPrinted by the Government Printer, Hong Kong.233784-8L-7/93

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!